| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹6.6 L | L1 | Accepted-Finance due to L1 |
| 2 | L2₹6.8 L+₹17,026.86 (2.57%)Rejected-Finance | ₹6.8 L+₹17,026.86 (2.57%) | L2 | Rejected-Finance due to L2 |
| 3 | L3₹6.8 L+₹21,157.14 (3.20%)Rejected-Finance V P O MILLAH TEHSIL SHILLAI DISTT SIRMOUR 173029 | SIRMAUR | HIMACHAL PRADESH | 173029 | ₹6.8 L+₹21,157.14 (3.20%) | L3 | Rejected-Finance due to L3 |
| 4 | L4₹7.0 L+₹37,172.51 (5.62%)Rejected-Finance | ₹7.0 L+₹37,172.51 (5.62%) | L4 | Rejected-Finance due to L4 |
| 5 | L5₹7.2 L+₹54,957.99 (8.31%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹7.2 L+₹54,957.99 (8.31%) | L5 | Rejected-Finance due to L5 |
Tender Value
₹8.4 L
EMD Value
₹17,000
Closing Date
21 Jul 2026, 10:30 amClosed
EE
Executive Engineer, Bilaspur Division No. II HPPWD Bilaspur
Repair Restoration on link road Methi to Sakli road
2026_PWD_138991_1
4830-36 dated 10-07-2026
Open Tender
Civil Works
Percentage
90 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
Yes
₹17,000
Yes
Bilaspur
30 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 21 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (thirty centimeter) in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m (fifty meter) and lift upto 1.5 m, as directed by Engineer-in-charge. ordinary rock including carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 69.5 | Per cubic metre | 342 | ₹23,769 |
| 2 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering as per drawing and technical specification in C.C 1:5:10 (one Cement : Five coarse sand : Ten graded stone aggregate 40 mm (Forty millimeter) nominal size) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess, royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 165 | Per Cubic metre | 4,569 | ₹7,53,885 |
| 3 | Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204. 3.8 of MORD specification,1200 including carriage of materials within all leads and lifts as per direction of Engineer-in-Charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other construction worker, welfare cess, royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 27.25 | Per Cubic Metre | 1,214 | ₹33,081.5 |
| 4 | Providing weepholes in brick masonry/stone masonary/plain reinforced concrete abutment wing wall, return wall with 100 mm ( one hundred millimetre ) dia PVC pipes extending through the full width of the structures with slope of 1 (v): 20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7.including carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 93 | Each | 346 | ₹32,178 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
sbdmethi.pdf
Tender Documents • 9.24 MB
BOQ_205883.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .