The Block Development Officer(BP)
Panchayat Union, Sendurai
Repairs of School and Anganwadi buildings 4 Nos in Package No.1 at Sirukalathur, Thular and Maruvathur Panchayat in Sendurai Block of Ariyalur District Under PUGF 2025-26
2025_RDTN_627346_1
R.C.No.A3/3055/2025, Date.17.11.2025
Open Tender
Civil Works - Others
Works
30 days
Sendurai
As per tender document
5 documents required · 5 mandatory
₹0
₹1,380
28 Nov 2025
28 Nov 2025
2 Dec 2025
28 Nov 2025
2 Dec 2025
28 Nov 2025
1.Repairs to Ceiling patchs at Sirukalathur PUM School in Sirukalathur Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
2.Repairs to Ceiling patchs at Poomudaiyankudikadu PUE School in Thular Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
3.Repairs to Ceiling patchs at Poomudaiyankudikadu Anganwadi building in Thular Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
4.Repairs to Ceiling patchs at Maruvathur PUM School in Maruvathur Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TechnicalBid1.pdf
Tender Documents • 0.32 MB
PriceBid1.pdf
Tender Documents • 0.22 MB
BOQ_750043.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .