| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC | ₹7.6 L | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹8.2 L+₹61,156.04 (8.10%)Accepted-AOC | ₹8.2 L+₹61,156.04 (8.10%) | 2 | Accepted-AOC Second lowest bidder |
| 3 | 3₹8.2 L+₹68,943.58 (9.13%)Accepted-AOC | ₹8.2 L+₹68,943.58 (9.13%) | 3 | Accepted-AOC Third lowest bidder |
Tender Value
Refer Docs
EMD Value
₹18,900
Closing Date
23 Jan 2021, 6:00 pmClosed
Assistant Executive Engineer, Hydrology Sub Divisi
Office of the Assistant Executive Engineer, Hydrology Sub Division, Kozhikode-09
NHP- RENOVATION OF KELOTHKADAV RIVER GAUGE STATION AT MANANTHAVADY
2021_Irrig_405829_1
AEEHYDKKD/ET- 05/2020-21
Open Tender
Civil Works - Others
Item Rate
Kelothkadav, Panamaram
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,682
₹18,900
Yes
14 Sept 2022
14 Jan 2021
28 Jan 2021
14 Jan 2021
23 Jan 2021
14 Jan 2021
14 Jan 2021 - 23 Jan 2021
Amount
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
18.12.6 : Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
od21762/2020_2021/IDRB : Supplying porcelain coated gauge scale plate with graduations to read up to 5mmand 1m long including all charges (LS)
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
Prasanth Markose Isac
SONU . E.S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_576989.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .