Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 L+₹22,416.46 (3.79%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹6.1 L+₹22,416.46 (3.79%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical As per NIT. |
| 4 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical As per NIT. |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of Copper wire with DPC covering covering size-9 SWG | 480 | Kg | 1,303 ₹6,25,440 Lowest | 1,348 ₹6,47,040 |
| 2.00 | Insulation Cost | 1 | No. | 93,816 ₹93,816 Lowest | 97,056 ₹97,056 |
| 3.00 | Labour Cost | 1 | No. | 93,816 ₹93,816 Lowest | 97,056 ₹97,056 |
| 4.00 | Less scrap @60% of Sl. No. 01 | 1 | No. | 3,75,264 ₹-3,75,264 Lowest | 3,88,224 ₹-3,88,224 |
| 5.00 | Cost of LT Bushing Insulator with studs | 2 | No. | 6,400 ₹12,800 Lowest | 7,170 ₹14,340 |
| 6.00 | Cost of Gasket/Corksheet | 2 | No. | 2,545 ₹5,090 Lowest | 2,850 ₹5,700 |
| 7.00 | Contractor's Profit | 1 | No. | 45,569.8 ₹45,569.8 Lowest | 47,296.8 ₹47,296.8 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 90,228.2 ₹90,228.2 Lowest | 93,647.66 ₹93,647.66 |
Tender Value
₹5.5 L
EMD Value
₹6,900
Closing Date
24 Mar 2026, 9:00 amClosed
Project Engineer EnM Bhurkunda Colliery
Office Of Project Engineer EnM Bhurkunda Colliery
Complete rewinding or repairing of 630KVA, 3.3KV/440V distribution transformer having Sl. No. BHK/630KVA/08 under Bhurkunda Colliery.
2026_CCL_356571_1
PE(EnM)/BHK/e Tender/25-26/46
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Office Of Project Engineer EnM Bhurkunda Colliery
Please refer tender documents.
2 documents required · 2 mandatory
₹6,900
21 May 2026
13 Mar 2026
25 Mar 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
14 Mar 2026 - 19 Mar 2026
Cost of Copper wire with DPC covering covering size-9 SWG
Insulation Cost
Labour Cost
Less scrap @60% of Sl. No. 01
Cost of LT Bushing Insulator with studs
Cost of Gasket/Corksheet
Contractor's Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_369424.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .