Chief General Manager (Thermal)
Design, Engineering, Supply, and Construction of Package A, B, C & D – New Lignite Feeding System, Associated Works , Contingency Feeding Arrangement & Dismantling work
325117
GIPCL/SLPP/R&M/LHS/FB-RELOCATION/EPC/2026
Open
Supply,erection and Commissioning
Turn-key
Surat
₹5,900
Gujarat Industries Power Co. Ltd.
₹24.5 L
24 Jul 2026
24 Jul 2026
24 Jul 2026
21 Aug 2026
24 Jul 2026
VOLUME II — TECHNICAL SPECIFICATIONS
Total Description / Purpose for
Document Title Ref. No.
17 Project background, plant
overview, overall scope &
Broad Scope & Project Details V2-S1
coordination requirements —
Mechanical — Technical 30 Mechanical equipment spec for
Specification V2-S2.1 Package A; covers FB, drives,
Package-A conveyors & associated plant
15 Datasheet Set A for Package A
Equipment Data Sheet — Set A
V2-S2.1.1 mechanical equipment (to be
completed by bidder)
09 Datasheet Set B for Package A
Equipment Data Sheet — Set B
V2-S2.1.2 mechanical equipment (to be
completed by bidder)
05 List of mandatory spare parts
Mandatory Spares List that must be quoted along with
Package-A main mechanical equipment
Total Description / Purpose for
Document Title Ref. No.
Quality Assurance Plan (QAP) — 14 Inspection & test plan for
Mechanical V2-S2.1.4 mechanical works; defines
Package-A hold/witness/review points
04 List of pre-approved sub-
Approved Vendor List (AVL)
V2-S2.1.5 vendors; deviations require
written approval from GIPCL
102 Civil works specification
Civil — Technical Specification
V2-S2&S3&S4 applicable across Packages A,
(Package A, B & C)
Earthwork in Excavation, Grading 09 Civil Specification for earthwork
& Backfilling — Attachment-1 V2-S2&S3&S4-1 in excavation, site grading and
Package A, B & C backfilling for civil works
02 Civil Specification for
De-Watering — Attachment-2
V2-S2&S3&S4-2 dewatering of excavations
Package A, B & C
during civil construction
Anti-Termite Treatment — 04 Civil Specification for chemical
Attachment-3 V2-S2&S3&S4-3 barrier treatment against
Package A, B & C subterranean termite attack
Concrete and Allied Works — 28 Civil Specification for ready-
Attachment-4 V2-S2&S3&S4-4 mixed and site-produced
Package A, B & C concrete and allied works
General Building Works — 138 Civil Specification for civil &
Attachment-5 V2-S2&S3&S4-5 architectural works — masonry,
Package A, B & C flooring, and finishing works
Water Supply and Sanitary Works 17 Specification for supply and
— Attachment-6 V2-S2&S3&S4-6 laying of water supply and
Package A, B & C sanitary pipelines
07 Civil Specification for
Plant Road — Attachment-7
V2-S2&S3&S4-7 earthwork, embankment and
Package A, B & C
construction of plant roads
35 Structural steel specification
Structural — Technical
V2-S2&S3&S4 applicable across Packages A,
Specification (Pkg A, B & C)
214 Electrical equipment &
Electrical — Technical
V2-S2.3 installation specification for
Specification – package-A
Package A scope
03 List of mandatory &
Mandatory Spares List — Electrical
V2-S2.3.1 commissioning spare parts for
Package A electrical equipment
C&I (Instrumentation) — Technical Control & instrumentation
Specification- Package-A specification for Package A
08 Full scope of associated civil,
structural, mechanical &
Package B — Associated Works V2-S3
enabling works for New feeding
system (FB relocation)
Total Description / Purpose for
Document Title Ref. No.
97 Combined electrical
Package B — Electrical V2-S3.3 specification for all Package B
12 Scope, design criteria &
Package C — Contingency technical spec (Mechanical) for
Surface Feeder contingency surface feeder
03 Electrical specification for
Package C — Electrical contingency surface feeder —
(Contingency Surface Feeder) power supply, cabling, earthing
& commissioning spares
16 Procedures, safety
Package D — Dismantling &
requirements & disposal
Disposal of Existing LHS V2-S5
obligations for removal of
General Technical Specifications 45 Master GTS applicable to all
& ERECTION AND packages; ECC standards &
COMMISSIONING CONDITIONS interface requirements, safety
OF CONTRACT (GTS-ECC) aspects etc
IT work: Details for package A, B, scope for IT network &
C, D Infrastructure
LIST OF DRAWINGS
Drawing Title Drg. Ref. Description / Purpose for Bidder
Schematic line diagram of the
LHS Line Diagram — Existing System DRG-01 existing Lignite Handling System
showing overall material flow path
General Arrangement drawing of
Package A — Conveyor General
DRG-02 the new conveyor system under
Arrangement (GA)
Package A (FB relocation scope)
Process/material flow diagram for
Package A — Material Flow Diagram DRG-03 Package A showing lignite feed
rates, capacities and routing
GA drawing of the contingency
Package C — Surface Feeder General surface feeder under Package C —
Arrangement (GA) reference for sizing and civil
Overall site plot plan of SLPP
showing existing plant layout, FB
Site Plot Plan — SLPP Plant Area DRG-05
location, access routes and work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PBG.pdf
Tender_Document_Index.pdf
V1-S1_NIT.pdf
V1-S2_ITB.pdf
V1-S3_Submission_of_Bid.pdf
V1-S4_GCC.pdf
V1-S5_SCC.pdf
V1-S6_Appendices.pdf
V1-S7_Price_Schedule.pdf
V2-S1_Broad Scope and Project Details.pdf
V2-S2.1_Mechanical-Package-A.pdf
V2-S2.1.1_Data sheet-A of package-A.pdf
V2-S2.1.2_Data sheet-B of package-A.pdf
V2-S2.1.3_Mandatory Spares List(Mechanical).pdf
V2-S2.1.4_Quality Assurance Plan (QAP) -Mechanical.pdf
V2-S2.1.5_Approved Vendor List (AVL).pdf
V2-S2 and S3 and S4_Civil-Package-A_B_C.pdf
(ATTACHMENT-1) VOL II SECTION 2-EARTHWORK IN EXCAVATION.pdf
( ATTACHMENT-2) VOL II SECTION 2-DE-WATERING.pdf
(ATTACHMENT-3) VOL-II SEC 2-ANTI TERMITE TREATMENT.pdf
(ATTACHMENT-4) VOL-II SECTION 2 -CONCRETE AND ALLIED WORKS.pdf
(ATTACHMENT-5) VOL II SECTION 2-GENERAL BUILDING WORKS.pdf
(ATTACHMENT-6) VOL II SECTION 2-WATER SUPPLY AND SANITARY WORKS.pdf
(ATTACHMENT-7 ) VOL II SECTION 2-PLANT ROAD.pdf
V2-S2 and S3 and S4_Structure_Package-A_B_C.pdf
V2-S2.3 Electrical Technical Specification- package-A.pdf
V2-S2.3.1_Mandatory Spares List — Electrical Package-A.pdf
V2-S2.4 CnI (Instrumentation) Technical Specification-Package-A.pdf
V2-S3_Package_B_Associated_Works.pdf
V2-S3.3_Package_B_Electrical.pdf
V2-S4_FB_Package_C_Contingency_Surface_Feeder.pdf
V2-S4.3_FB_Package_C_Electrical.pdf
V2-S5_FB_Package_D_Dismantling_Disposal.pdf
V2-S6_GTS_ECC.pdf
Vol. 2 – S7 IT Scope of WORK for A B C D.pdf
DRG-01_LHS Line Diagram of existing system.png
PNG
DRG-02_Package-A Conveyor GA.pdf
DRG-03_Package-A flow diagram.pdf
DRG-04_Package-C GA of Surface feeder.pdf
DRG-05_Plot Plan.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].