Loading…
Loading…
Tender Value
₹18.4 L
EMD Value
₹36,800
Closing Date
31 Aug 2026, 3:00 pm3d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
SIGNALLING
6 conditions · 2 needing a document upload
As per Tender Document
As per Tender Document
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Shifting of DFCCIL Signalling & OFC Cables infringing the construction of FOB at Unjha Station on PNUN-ADI section
DFC-ADI-SNT-01-2026-27~WDFC
DFC-ADI-SNT-01-2026-27
Open
Works - General
2 Months
Ahmedabad, Gujarat
₹0
₹36,800
8 Aug 2026
8 Aug 2026
17 Aug 2026
71 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 18,39,022.5 | ||
| — | 3.00 | — | — | ||
| Supply of 48 Fiber Armoured Optical Fiber Cable as per RDSO spec no. IRS:TC 55/2006 Amend 3 or latest | — | — | — | 2,57,043 | |
| — | 3.00 | — | — | ||
| Supply of 24 Fiber Armoured Optical Fiber Cable as per RDSO spec no. IRS:TC 55/2006 Amend 3 or latest | — | — | — | 2,16,966 | |
| — | 1.00 | — | — | ||
| Supply of 12 Core x 1.5 Sq. mm PVC Insulated Armoured, unscreened, underground Railway Signalling cable as per RDSO Spec No.: IRS: S-63/2014 (Rev. 4.0) (STR SIQ 0701 Ver. 3) | — | — | — | 2,37,758 | |
| — | 0.50 | — | — | ||
| Supply of 4 Quad x 0.9 mm Underground Railway jelly filled Telecom Quad cables for Signalling and Telecom installations of RDSO spec no IRS: TC:30/2005 (ver. 1) (Amend. 1 to 5) (STR- TCQ 0007) | — | — | — | 1,20,625.5 | |
| — | 0.50 | — | — | ||
| Supply of Single mode 12 Fiber Armoured Optic Fibre Cable (TYPE-I). It shall Comply to TEC Standard Number-TEC 85170:2024. | — | — | — | 16,225 | |
| — | 0.50 | — | — | ||
| Supply of 10 pair PIJF (Poly Insulated Jelly Filled) 0.5mm Dia cable as per RDSO Specn IRS:TC-41/97 with amendment 2 or latest | — | — | — | 52,805 | |
| — | 8.00 | — | — | ||
| Supply, preparation, splicing and installation of straight joint for 48 fibres along with enclosures with heat shrinkable splice protection sleeve as per TEC Specn.G/OJC-02/01 March-99 or latest. Splice losses in no case should be more than 0.1 dB. The Joint Enclosures must be of Make - Raychem/Comscope/3M or equivalent | — | — | — | 1,22,648 | |
| — | 8.00 | — | — | ||
| Supply, preparation, splicing and installation of straight joint for 24 fibres along with enclosures with heat shrinkable splice protection sleeve as per TEC Specn. G/OJC-02/01 March 99 or latest, Splice losses in no case should be more than 0.1 dB. The Joint Enclosures must be of Make - Raychem/Comscope/3M or equivalent | — | — | — | 1,11,904 | |
| — | 6.00 | — | — | ||
| Supply of Pastorate prefabricated OFC jointing pits (RCC/PVC) of size 0.6mx0.8mx1m. The material shall be supplied as per engineer in charge instructions. | — | — | — | 28,176 | |
| — | 6.00 | — | — | ||
| Installation of Pastorate pre-fabricated OFC jointing pits (RCC/PVC) of size 0.6mx0.8x1m.The material shall be supplied as per engineer in charge instructions | — | — | — | 7,230 | |
| — | 3.00 | — | — | ||
| Supply of HDPE duct 40/33 mm as per RDSO/SPN/TC /45/2013/Rev. 2.0 with latest amendments as available. For each KM of HDPE duct following items are to be supplied. a) end plugs - 2 nos, b) Cable sealing plugs - 2 nos, c) Plastic couplers slip fit/push fit type - 2 nos, d) End plugs to be provided along with drum - 02 nos. | — | — | — | 1,86,726 | |
| — | 3.00 | — | — | ||
| Transportation and laying of HDPE pipe as per approved cable route plan in the excavated trench, taking due care while transporting and laying the same in the trenched or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain sealed till blowing is done. | — | — | — | 19,905 | |
| — | 6.00 | — | — | ||
| Blowing/drawing of OFC cables in the HDPE duct along with all the protective work as per approved standard and instructions of site Engineer. | — | — | — | 63,144 | |
| — | 2.00 | — | — | ||
| Supply of Thermo shrinkable joint kit as per RDSO Spec. No. SPN/TC 57/2015 Rev-1 or latest suitable to PIJF U/G telecom cable of spec. No. IRS TC -41/97, Amd-2 or latest. Size of the cable will be advised by consignee incharge and conforming to as per Technical Specifications. | — | — | — | 6,196 | |
| — | 2.00 | — | — | ||
| Installation of Thermo-shrinkable joining kits for making(a) straight through joints without transformers for 6 quad Jelly filled cable (b) Derivation joint without transformer for 6quad jelly filled cable, and (c)Straight Through joint without transformer for 10 Pr/20Pr. PIJF cables and construction of Brick chamber for protection of joints with contractor's all materials asper railway Drg. where VF transformers are not required. All the materials required for the work are to be arranged by the contractor himself at his own cost except Thermo shrinkable jointing kit which is already covered in supply portion of the tender. After jointing the cable through test such as insulation test, Continuity cable losses etc.to be carried out jointly with the Railway Engineer. If any defect or any damage observed during jointing, the contractor should redo the joint free of cost. | — | — | — | 3,000 | |
| — | 3.00 | — | — | ||
| Supply of Apparatus Case half NE Rly Type as per Drg. No. W. Rly/SW/47/68 Alt-A fitted two nos E Type lock of (ward No will be specified by Engineer-in Charge) as per RDSO Drg. No. SA3376/3473 and Key to Drg.No. 3377. Note: This item includes the supply & fixing of 2 Nos E Type Lock fitted on both doors, along with two Keys | — | — | — | 26,625 | |
| — | 3.00 | — | — | ||
| Installation of NE type Half apparatus case and casting of CC foundation in the ratio of 1:3:6 for NE type apparatus case as per drawing using std. size holding down bolts. Item include excavation, ramming, curing and plastering with 1:4 cement and sand mixtures. This includes filling up of hollow space in the foundation both sand and top surface, plastering. (Aggregate not exceeding 3.8 cm) Plastering should be done to level the surface on all sides upto 75 mm below the ground level after the cable is taken inside the apparatus case. Aggregate, sand, holding down bolts and cement to be supplied by the contractors. This includes supply and fixing of telephone sockets, location lamp holder and making arrangement for padlocking of location boxes. | — | — | — | 21,948 | |
| — | 200.00 | — | — | ||
| Supply of Disconnect Terminal Block, Screw less mounted 2.5sq.mm. 4-wire front entry, Two input, Two output, Disconnected Cage Clamp Terminal block for test and measurement as per site requirement. as per RDSO Spec. No. RDSO/SPN/189/2004. The procurement should be done from RDSO recommended sources. The colour will be decided by Engineer - in - Charge. ( Preferably In BLUE, Red & Grey Colors in the ratio of 1:2:3) | — | — | — | 16,400 | |
| — | 50.00 | — | — | ||
| Supply of End Plate of dimension 10mm/0.0394 in width as per site requirement. | — | — | — | 750 | |
| — | 50.00 | — | — | ||
| Supply of End Stopper of dimension 2.5mm/0.091 in thick as per site requirement. | — | — | — | 750 | |
| — | 20.00 | — | — | ||
| Supply of Carrier Rails of dimension 35mmx7.5mm, 1mm/0.039 in thickness unslotted type as per site requirement | — | — | — | 3,160 | |
| — | 200.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables / Tail Cables) at both ends in location boxes, cable termination rack in relay room, station building, other room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All tools required for this termination will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, other Room, ASM Room, Location boxes etc under supervision and instructions issued by Engr. incharge of the work. | — | — | — | 1,800 | |
| — | 3.00 | — | — | ||
| Lettering/Numbering Termination particulars, equipment's names etc, legibly and neatly inside location boxes (Half Case). This includes supply of paints of Asian Paints/Nerolac/Dulux/Berger Make. This work will be carried out as per the standard practice or as per site in charge's instructions. | — | — | — | 369 | |
| — | 3.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the Apparatus Case Half Size (Outside & Inside) after scraping & cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-incharge. The paint and primer should be from Asian Paints /Nerolac /Dulux/ Berger. The primer/enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970)/ (IS 2932 of 1974). | — | — | — | 1,527 | |
| — | 3.00 | — | — | ||
| Supply of Maintenance Free Earth consisting as RDSO Drg. No. SDO /RDSO/ E&B/001 and RDSO Spec No.RDSO / SPN/197Version 2.0 with latest amendment, consisting of single earth pit which includes supply of 35Sq. mm/16Sq.mm/10Sq.mm (As per site requirement) multistrand single core PVC insulated copper cable as per IS694 for connecting main earth electrode to MEEB in the equipment room in duplicate as per manufacturers recommendation and as per RDSO specification as follows: a) Copper bonded steel electrode of3.0 meter long, 17mm dia. With coppper bonding thickness of minimum 250 microns and UL listed and marked - 1No. b) Earth enhancement compound of RDSO approved brand supplied in sealed bag of minimum 10 Kg-3Nos. c) Coppper strip of 150x25x6 mm(min.) to terminate earth rod. -1No.d) Copper strip of 300x25x6 mm(MEEB) - 1No. e) copper strip of150x25x6mm (min.) (SEEB) -1 No. | — | — | — | 29,892 | |
| — | 3.00 | — | — | ||
| Installation of Maintenance Free Earth Electrode as per Std. Practice as directed in specification RDSO/SPN /197/2008. | — | — | — | 4,545 | |
| — | 30.00 | — | — | ||
| Manual horizontal auger boring for crossing of road/track at depth of 1.2 m from ground level/bottom of rail flange including insertion of 100mm dia (with thickness 3.65mm) DWC pipes/coupling etc. all complete as per the directions of Engineer- in-charge. | — | — | — | 44,010 | |
| — | 250.00 | — | — | ||
| Digging of 1.2 mtr deep and 0.3 mtr wide trenches in all type of soils, including soft rock as per approved cable route plan and back filling the trench after laying of cables. It includes clearing of roots of trees and bushes and temporary obstructions on the selected cable route, ramming of soil. The item includes covering of laid cables by sieved soil. Where digging of 1.2 mtr depth is not possible or depth is reduced/increased as per instructions given by engineer incharge then payment will be decreased/increased proportionately to the depth of trench.Note: Cable trenching between Station Limit (i.e. from Distant to Distant Signals) should be done at distance of 3.0 mtrs(minimum) from centre line of track and Outside Station Limit, cable trenching will be done at distance of 5.5 mtrs(minimum) from centre line of track. If above mentioned minimum distances are not available at site then trenching will be done by contractor as per instructions issued by Site Engineer. | — | — | — | 58,750 | |
| — | 3000.00 | — | — | ||
| Laying of S&T cables of various cores/pairs/quads in trenches/GI Pipes/RCC ducts /DWC/HDPE Pipes/Trunking etc, laying of OFC ducts in trenches as per site requirement and as per approved cable route plan. It also includes laying of cables in track crossing and road crossing. It includes placing of half cut DWC pipes, pre-fabricated ducts and DWC pipes. It also includes provision of labels on each cable of coloured plastic adhesive types or any other identifiable marker to give the cable number at each termination point. The contractor will do meggering of all the cables (main and tail) before laying as well as after laying under the supervision of engineer incharge. Meggering test report of all the cables will be signed jointly by authorized site representative of contractor and site engineer incharge. Note: The length of the cable laid will include length of the cable which have been coiled for termination purpose. Half cut DWC, pre- fabricated ducts and DWC pipes shall be supplied by DFCCIL. | — | — | — | 21,000 | |
| — | 5.00 | — | — | ||
| Double Walled Corrugated (DWC)HDPE Pipe with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/ 2011 or latest anti-rodent & anti-oxidant and non-flame propagating type in 6 meters straight length and of size 120 mm outer die, & 103.5mm inner dia. One of the following coupling arrangements should also be supplied with each pipe as per the site requirement.1) Suitable snap fit coupler with rubber 'O-Ring 2) Spacers 3) Tees 4) Bend, 5) End-cap (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vender name and year of manufacture can be easily identified. Color -Bright Orange;Min Weight = 4kg. Test Check by Consignee & Sample check by JAG Officer. | — | — | — | 8,455 | |
| — | 30.00 | — | — | ||
| Placing of DWC/RCC pipes along with collars in trenches at places of track and road crossings, platform cuttings etc. also for | — | — | — | 840 | |
| — | 350.00 | — | — | ||
| Supply of half round RCC pipes of 150 mm internal dia (2 meter long) along with collars as per ISNo. 458/2003 of NP type. (Supply 1meter x 2 No). | — | — | — | 1,19,350 | |
| — | 700.00 | — | — | ||
| Laying of half round RCC pipe after laying the cables in the trenches. (Cable laying is covered separately | — | — | — | 16,100 | |
| — | 20.00 | — | — | ||
| Supply of RCC cable route markers engraved in one side and painted on both sides along the route every 50m and route diversion as per Drg. shall be provided by railway. | — | — | — | 9,620 | |
| — | 20.00 | — | — | ||
| Installation of RCC cable route markers engraved in one side and painted on both sides along the route every 50m and route diversion as per Drg. shall be provided by railway. | — | — | — | 2,780 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocuments_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].