| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹22.2 LAccepted-Finance | ₹22.2 L | l1 | Accepted-Finance Lowest Bid |
| 2 | l2₹22.2 L+₹6,537 (0.29%)Rejected-Finance 245 2 RAJPUR ROAD OPPOSITE HOTEL MADHUBAN DEHRADUN | ₹22.2 L+₹6,537 (0.29%) | l2 | Rejected-Finance Higher bid |
| Sl No | Description | Qty | Unit | Lotus Contractors and Traders L1 | Modern Electric Company L2 |
|---|---|---|---|---|---|
| 1.00 | Laying of PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing RCC/ HUME/ METAL/DWC pipe as required. Upto 35 sq. mm | 150 | Mtrs. | 35 ₹5,250 Lowest | 40 ₹6,000 |
| 2.00 | Supply, connection, testing and commissioning of heavy duty, medium voltage,
XLPE (IS 7098 - PART-II) insulated, Stranded AL / Cu conductor
Armoured / Flexible cables as per specification & IS.
The cable shall have outer sheeth of XLPE and inner sheath of PVC with stranded AL conductor wherever specified.
The cable shall be laid underground in excavated trench / prepared trench / hume pipes when laid outside the building. Cable shall be laid throught preapred trench / cable tray / duct / hume pipe / channel / floor trunks etc when laid inside
the building as instructed by PMC/Site Incharge.
The scope shall include:
1) Supply of Cables.(With Non Returnable Drums)
2) Delivery of the cables at site.
3) Unloading at site store.
4) Shifting of cable from site store to place of installation.
5) Connection of cable with proper tagging as specified ni specifications.
6) Supply & fixing of cable clamps, brackets, supports, route markers etc. where ever required to fix the cables safely.
7) Earthing the glands and armouring with earthing clamp and jumper and also connecting to common earth bar.
8) Testing of insulation and continuity of cable and submission of reports to the client's representative.
9) To prepare submission drawing and to take approval of consultant at each stage.
10) To prepare & submit as-built drawing and handing over document to end user.
11) Rate shall be inclusive of route markers at 15mtr intervals
12) Each run of cable to be tested with 1KV meggar
13) Proper cables tags of Aluminium shall be made and feeder shall be written. 3C x 4 Sq.mm. CU XLPE armored cable | 150 | Mtrs. | 200 ₹30,000 Lowest | 253 ₹37,950 |
| 3.00 | Supplying and making end termination with brass compression gland and Copper lugs for following size of PVC insulated and PVC sheathed / XLPE copper conductor cable of 1.1 KV grade as required. 3C x 4 Sq.mm. CU XLPE armored cable | 12 | Nos. | 240 ₹2,880 Lowest | 450 ₹5,400 |
| 4.00 | Supply and installation of ARCHITECTURAL POLE
3.3M height Pole (Total height of the pole is 4m including post top) Made in combination of hot dip galvanised mild steel pipe sections 114mm dia. & 140mm dia. Arch. cast iron Base design starts with min 322mm Dia. ring, radially tapers to 140 mm for a height of min 235 mm matching to the drawing. Total weight of the base is min 15 Kgs. Decorative Ring-1 (140/114mm dia. – min 3kgs.) & Top Ring (weight- 3kgs.) are made of cast iron. Entire pole shall be made to provide pleasing aesthetics as approved by Concerned Engineer in-charge. After Fabrication, Entire Pole is hot dip galvanized(60 microns Minimum ) for the effective corrosion resistance . The hot dip Galvanised pole should be provided with an inbuilt junction box (Concealed) to fix 32A connectors and 6A MCB (to terminate incoming and outgoing armoured cables with glands and lulgs), at the bottom -the inbuilt box should have a flush door of suitable size. The decorative pedastal to be mounted on a suitable size steel plate. This mounting steel plate along with foundation bolts of suitable size to be used for ensuring firm grouting into the specially designed RCC foundation. wind pressure calculation as per IS 875(part-3) & structural calculation report as per EN40 should be submitted to verify the pole design. Pole & it's parts are painted in 3 layer coating(coating thickness-100 microns minimum) in which 1st layer with etch primer, 2nd layer with epoxy primer & 3rd final layer with PU paint- customised colour Metallaic Grey (As per Architectural requirement). Adequate size cutout with opeanable hinged door should be provided on pole with necessary gasket to ensure water tight arrangement for pulling cables and installation of mcb, connectors etc, complete in all respect as per requirement and instruction of engineer in charge. Scope also includes necessary foundation, cable termination, earthing as per requirement, cable entry pipes, 3 core round flexible wire from junction box to light fixture etc. all require to complete job. | 4 | Nos. | 45,000 ₹1,80,000 Lowest | 52,000 ₹2,08,000 |
| 5.00 | FIXTURE - 40-45W Power Module LED:
Supply of post top light fixture equivalent to LED FIXTURE - 40-45W Power Module LED, -MOUNTED AT 4 METER HEIGHT POST TOP POLE:it's - Upper frame made in die-cast and sheet aluminium (thickness: 2.5mm), with threaded coupling G3/4" for fixing,Bottom frame with ring made in die-cast aluminium and two arms made in hotgalvanized steel, with flange for fixing equipped of a hole (diam. 28 mm) .Gasket between the upper and bottom frames.Painted with polyester powder coating in Metallaic Grey (As per Architectural requirement). IP Rating - IP 66.Height –690mm, Dia - 550mm, Weight - 11.5Kg, Area Exposed to Wind(S) - 0.105 m2. Power LED's Module (with CREE/NICHIA/OSRAM/SEOUL SMD type LED’s with ESD=>8kV & Ceramic package are accepted. LED manufacturers tech sheet with buying documents should be submitted for verification. Individual LED's Minimum Luminous Flux (lm) is 139lm @ 350 mA (@ 85 °C) same should be supported by LED manufacturer's tech sheet) in compliance with IEC 62031(supporting type test report should be submitted), on Printed Circuit Board with metal core plate. Colour Rendering Index: Ra > 70. Electronic Power Supply for LED Module, which offers Protection against Short Circuit, Over- Voltage & Over- Current, with in-built surge protection upto 1.5kv(an additional surge protection device of 10kV also provided in-built the fixture). Optics with refractive lens (Polycarbonate), UV Resistant & Shock Resistance IK10.LM80 Reported LED Lifetime is L90@ 50,000hours minimum.(same should be supported by LM 80 report from NVLAP accredited lab) & Estimated LED Lifetime is L80 @ 100,000 hours(Ta-25°C) minimum..LM 80 report & TM 21 calculation should be submitted to support the same.The Light fixture shall be in compliance with IEC 60598-2-3; IEC 60598-1.(Supporting Test Report from NABL accredited Laboratory should be submitted) .LM79 report should be submitted from NABL accredited Laboratory. Sample should be submitted for approval from concerned engineer-in charge. | 5 | Nos. | 35,000 ₹1,75,000 | 33,000 ₹1,65,000 Lowest |
| 6.00 | 3.3M HEIGHT HERITAGE SMART POLE FOR INDIRECT LIGHTING
3.3M height Pole Made in combination of Multiple Modules made of mild steel pipe sections 270mm dia. & multiple suitable Cast Iron embellishments like base & rings.Smart features/services such as CCTV dome type camera, PAS-2nos.( Equivalent to Bose spekaer AMU), USB charger, SOS emergency button, WIFI device/router should be inbuilt inside the pole .Entire pole shall be made to provide pleasing aesthetics as approved by Concerned
Engineer in-charge. After Fabrication, MS pipe modules are hot dip galvanized(60 microns Minimum ) for the effective corrosion resistance . The hot dip Galvanised pole should be provided with an inbuilt junction box to fix 32A connectors and 6A MCB, at the bottom - the inbuilt box should have a flush door of suitable size. The decorative pedastal to be mounted on a suitable size steel plate. This mounting steel plate along with foundation bolts of suitable size to be used for ensuring firm grouting into the specially designed RCC foundation. wind pressure calculation as per IS 875(part-3) & structural calculation report as per EN40 should be submitted to verify the pole design. Adequate size cutout with opeanable hinged door should be provided on pole with necessary gasket to ensure water tight arrangement for pulling cables and installation of mcb, connectors etc, complete in all respect as per requirement and instruction of engineer in charge. Scope also includes necessary foundation, cable termination, earthing as per requirement, cable entry pipes, astronomical timer with contactorfor light on-off, 3 core round flexible wire from junction box to light fixture etc. all require to complete job. Pole & Cast iron parts are painted in 3 layer coating(coating thickness-100 microns minimum) in which 1st layer with etch primer, 2nd layer with epoxy primer & 3rd final layer with PU paint. Price shall be inclusive of
following items but not limited to this. Contractor to consider all the components to operate smart pole satisfactory:
Speakar - 2 Nos. (each pole) Equivalent to Bose AMU speaker ,CCTV - 2Nos. (Each pole)
IP 3 MP (20 fps) & Full HD 1080p (25/30 fps) image with 1/3" 3 MP sensor, true widescreen image on a 16:9
display,True Day/Night vision,IR LEDs provide up to 30 m (100 ft) of illumination in night,Smart IR
technology,IP66 & IK10 housing,Small form factor, inconspicuous after installation,2.7–12 mm F1.4
motorized focus/zoom lens,STQC Approved, 1Gbps SFP Module, Media Converter (Fiber to UTP), require port POE network switch, Cat-6 Cable within pole, etc.(including all as require) POE Network switch ,The Dual Band(2.4GHz & 5 GHz)Wi-Fi system .It provides simultaneous,dual-band,MIMO technology . dual-band .omnidirectional antennas deliver expanded range coverage outdoors. The primary port is for data and
POE, Equivalent to NETGEAR WND930, SOS SOS button provided for users To avail the Emergency services .USB charger,Waterproof USB Dual Charge Socket with 5V DC Output.USB Input Voltage Range,12-24V,USB Output .The scope shall also cover to supply and installations of all components like Power supply modules, POE switch, LC, SC modules and all other require /necessary components and accessories to finish and operate smart pole satisfactory. | 1 | Nos. | 15,50,000 ₹15,50,000 | 14,87,000 ₹14,87,000 Lowest |
| 7.00 | Up & Down Light
Supply of 2X10 W LED Up down light suitable for wall mounting , BIS approved, Body made of pressure Die cast aluminium , proper heat sink should be designed for better heat dessipation , The diffuser should be clear toughned glass with IK08 protection . The luminaire is provided with surge protection of 4KV . Electronic driver having power factor>0.95, THD <15 % and input voltage range from 150-270V AC at 50Hz. Minimum lumen 2000 Lumens in CCT range of 3000/4000/5700 as per ANSI,LED Make CREE/Osram/Samsung with LM80
report to be submitted at the time of Supply , life of 50000 burning hours with 70% of initial lumens maintained.Ambient Operating Temperature is -10 Deg. to 50 Deg. Luminaire should Maintain Ingress Protection of IP65 for better weather proofing.
* Colour of light fixture shall be as per Architectural requirements.
* Contractor to submit samples for Approval before ordering the fixture. | 8 | Nos. | 3,500 ₹28,000 Lowest | 20,500 ₹1,64,000 |
| 8.00 | Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector. | 2 | Nos | 1,800 ₹3,600 Lowest | 2,250 ₹4,500 |
| 9.00 | Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector. Size 130 mm x 180 mm x 77 mm (Tolerance ± 10%) | 2 | Nos | 2,210 ₹4,420 | 1,000 ₹2,000 Lowest |
| 10.00 | Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector. Size 155 mm x 210 mm x 92 mm(Tolerance ± 10%) | 2 | Nos | 2,775 ₹5,550 | 1,000 ₹2,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
6 Aug 2025, 5:00 pmClosed
executive engineer e/m
E/M Division, PWD, Bazpur
construction of parking plaza and Streetscape at Dandeshwar, Jageshwar Distt. Almora under Jageshwar Dham Master Plan
2025_pwd_85084_1
700/nividasuchnadt09062025
Open Tender
Electrical Works
Item Rate
jageshwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer E/M Division PWD Bazpur
₹56,000
14 Aug 2025
23 Jun 2025
7 Aug 2025
23 Jun 2025
6 Aug 2025
11 Jul 2025
23 Jun 2025 - 8 Jul 2025
Amount
Laying of PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing RCC/ HUME/ METAL/DWC pipe as required. Upto 35 sq. mm
Supply, connection, testing and commissioning of heavy duty, medium voltage, XLPE (IS 7098 - PART-II) insulated, Stranded AL / Cu conductor Armoured / Flexible cables as per specification & IS. The cable shall have outer sheeth of XLPE and inner sheath of PVC with stranded AL conductor wherever specified. The cable shall be laid underground in excavated trench / prepared trench / hume pipes when laid outside the building. Cable shall be laid throught preapred trench / cable tray / duct / hume pipe / channel / floor trunks etc when laid inside the building as instructed by PMC/Site Incharge. The scope shall include: 1) Supply of Cables.(With Non Returnable Drums) 2) Delivery of the cables at site. 3) Unloading at site store. 4) Shifting of cable from site store to place of installation. 5) Connection of cable with proper tagging as specified ni specifications. 6) Supply & fixing of cable clamps, brackets, supports, route markers etc. where ever required to fix the cables safely. 7) Earthing the glands and armouring with earthing clamp and jumper and also connecting to common earth bar. 8) Testing of insulation and continuity of cable and submission of reports to the client's representative. 9) To prepare submission drawing and to take approval of consultant at each stage. 10) To prepare & submit as-built drawing and handing over document to end user. 11) Rate shall be inclusive of route markers at 15mtr intervals 12) Each run of cable to be tested with 1KV meggar 13) Proper cables tags of Aluminium shall be made and feeder shall be written. 3C x 4 Sq.mm. CU XLPE armored cable
Supplying and making end termination with brass compression gland and Copper lugs for following size of PVC insulated and PVC sheathed / XLPE copper conductor cable of 1.1 KV grade as required. 3C x 4 Sq.mm. CU XLPE armored cable
Supply and installation of ARCHITECTURAL POLE 3.3M height Pole (Total height of the pole is 4m including post top) Made in combination of hot dip galvanised mild steel pipe sections 114mm dia. & 140mm dia. Arch. cast iron Base design starts with min 322mm Dia. ring, radially tapers to 140 mm for a height of min 235 mm matching to the drawing. Total weight of the base is min 15 Kgs. Decorative Ring-1 (140/114mm dia. – min 3kgs.) & Top Ring (weight- 3kgs.) are made of cast iron. Entire pole shall be made to provide pleasing aesthetics as approved by Concerned Engineer in-charge. After Fabrication, Entire Pole is hot dip galvanized(60 microns Minimum ) for the effective corrosion resistance . The hot dip Galvanised pole should be provided with an inbuilt junction box (Concealed) to fix 32A connectors and 6A MCB (to terminate incoming and outgoing armoured cables with glands and lulgs), at the bottom -the inbuilt box should have a flush door of suitable size. The decorative pedastal to be mounted on a suitable size steel plate. This mounting steel plate along with foundation bolts of suitable size to be used for ensuring firm grouting into the specially designed RCC foundation. wind pressure calculation as per IS 875(part-3) & structural calculation report as per EN40 should be submitted to verify the pole design. Pole & it's parts are painted in 3 layer coating(coating thickness-100 microns minimum) in which 1st layer with etch primer, 2nd layer with epoxy primer & 3rd final layer with PU paint- customised colour Metallaic Grey (As per Architectural requirement). Adequate size cutout with opeanable hinged door should be provided on pole with necessary gasket to ensure water tight arrangement for pulling cables and installation of mcb, connectors etc, complete in all respect as per requirement and instruction of engineer in charge. Scope also includes necessary foundation, cable termination, earthing as per requirement, cable entry pipes, 3 core round flexible wire from junction box to light fixture etc. all require to complete job.
FIXTURE - 40-45W Power Module LED: Supply of post top light fixture equivalent to LED FIXTURE - 40-45W Power Module LED, -MOUNTED AT 4 METER HEIGHT POST TOP POLE:it's - Upper frame made in die-cast and sheet aluminium (thickness: 2.5mm), with threaded coupling G3/4" for fixing,Bottom frame with ring made in die-cast aluminium and two arms made in hotgalvanized steel, with flange for fixing equipped of a hole (diam. 28 mm) .Gasket between the upper and bottom frames.Painted with polyester powder coating in Metallaic Grey (As per Architectural requirement). IP Rating - IP 66.Height –690mm, Dia - 550mm, Weight - 11.5Kg, Area Exposed to Wind(S) - 0.105 m2. Power LED's Module (with CREE/NICHIA/OSRAM/SEOUL SMD type LED’s with ESD=>8kV & Ceramic package are accepted. LED manufacturers tech sheet with buying documents should be submitted for verification. Individual LED's Minimum Luminous Flux (lm) is 139lm @ 350 mA (@ 85 °C) same should be supported by LED manufacturer's tech sheet) in compliance with IEC 62031(supporting type test report should be submitted), on Printed Circuit Board with metal core plate. Colour Rendering Index: Ra > 70. Electronic Power Supply for LED Module, which offers Protection against Short Circuit, Over- Voltage & Over- Current, with in-built surge protection upto 1.5kv(an additional surge protection device of 10kV also provided in-built the fixture). Optics with refractive lens (Polycarbonate), UV Resistant & Shock Resistance IK10.LM80 Reported LED Lifetime is L90@ 50,000hours minimum.(same should be supported by LM 80 report from NVLAP accredited lab) & Estimated LED Lifetime is L80 @ 100,000 hours(Ta-25°C) minimum..LM 80 report & TM 21 calculation should be submitted to support the same.The Light fixture shall be in compliance with IEC 60598-2-3; IEC 60598-1.(Supporting Test Report from NABL accredited Laboratory should be submitted) .LM79 report should be submitted from NABL accredited Laboratory. Sample should be submitted for approval from concerned engineer-in charge.
3.3M HEIGHT HERITAGE SMART POLE FOR INDIRECT LIGHTING 3.3M height Pole Made in combination of Multiple Modules made of mild steel pipe sections 270mm dia. & multiple suitable Cast Iron embellishments like base & rings.Smart features/services such as CCTV dome type camera, PAS-2nos.( Equivalent to Bose spekaer AMU), USB charger, SOS emergency button, WIFI device/router should be inbuilt inside the pole .Entire pole shall be made to provide pleasing aesthetics as approved by Concerned Engineer in-charge. After Fabrication, MS pipe modules are hot dip galvanized(60 microns Minimum ) for the effective corrosion resistance . The hot dip Galvanised pole should be provided with an inbuilt junction box to fix 32A connectors and 6A MCB, at the bottom - the inbuilt box should have a flush door of suitable size. The decorative pedastal to be mounted on a suitable size steel plate. This mounting steel plate along with foundation bolts of suitable size to be used for ensuring firm grouting into the specially designed RCC foundation. wind pressure calculation as per IS 875(part-3) & structural calculation report as per EN40 should be submitted to verify the pole design. Adequate size cutout with opeanable hinged door should be provided on pole with necessary gasket to ensure water tight arrangement for pulling cables and installation of mcb, connectors etc, complete in all respect as per requirement and instruction of engineer in charge. Scope also includes necessary foundation, cable termination, earthing as per requirement, cable entry pipes, astronomical timer with contactorfor light on-off, 3 core round flexible wire from junction box to light fixture etc. all require to complete job. Pole & Cast iron parts are painted in 3 layer coating(coating thickness-100 microns minimum) in which 1st layer with etch primer, 2nd layer with epoxy primer & 3rd final layer with PU paint. Price shall be inclusive of following items but not limited to this. Contractor to consider all the components to operate smart pole satisfactory: Speakar - 2 Nos. (each pole) Equivalent to Bose AMU speaker ,CCTV - 2Nos. (Each pole) IP 3 MP (20 fps) & Full HD 1080p (25/30 fps) image with 1/3" 3 MP sensor, true widescreen image on a 16:9 display,True Day/Night vision,IR LEDs provide up to 30 m (100 ft) of illumination in night,Smart IR technology,IP66 & IK10 housing,Small form factor, inconspicuous after installation,2.7–12 mm F1.4 motorized focus/zoom lens,STQC Approved, 1Gbps SFP Module, Media Converter (Fiber to UTP), require port POE network switch, Cat-6 Cable within pole, etc.(including all as require) POE Network switch ,The Dual Band(2.4GHz & 5 GHz)Wi-Fi system .It provides simultaneous,dual-band,MIMO technology . dual-band .omnidirectional antennas deliver expanded range coverage outdoors. The primary port is for data and POE, Equivalent to NETGEAR WND930, SOS SOS button provided for users To avail the Emergency services .USB charger,Waterproof USB Dual Charge Socket with 5V DC Output.USB Input Voltage Range,12-24V,USB Output .The scope shall also cover to supply and installations of all components like Power supply modules, POE switch, LC, SC modules and all other require /necessary components and accessories to finish and operate smart pole satisfactory.
Up & Down Light Supply of 2X10 W LED Up down light suitable for wall mounting , BIS approved, Body made of pressure Die cast aluminium , proper heat sink should be designed for better heat dessipation , The diffuser should be clear toughned glass with IK08 protection . The luminaire is provided with surge protection of 4KV . Electronic driver having power factor>0.95, THD <15 % and input voltage range from 150-270V AC at 50Hz. Minimum lumen 2000 Lumens in CCT range of 3000/4000/5700 as per ANSI,LED Make CREE/Osram/Samsung with LM80 report to be submitted at the time of Supply , life of 50000 burning hours with 70% of initial lumens maintained.Ambient Operating Temperature is -10 Deg. to 50 Deg. Luminaire should Maintain Ingress Protection of IP65 for better weather proofing. * Colour of light fixture shall be as per Architectural requirements. * Contractor to submit samples for Approval before ordering the fixture.
Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector.
Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector. Size 130 mm x 180 mm x 77 mm (Tolerance ± 10%)
Supply, Transportation, Installation, testing and commissioning of IP 68 weather proof Outdoor type junction boxes with terminal block/connector. Size 155 mm x 210 mm x 92 mm(Tolerance ± 10%)
Supply, Installation, Testing and Commissioning of 6 single mode fiber optic cables (9/125 µm) with all necessary accessories to comply the installation. Size 155 mm x 210 mm x 92 mm(Tolerance ± 10%)
Supplying and drawing of UTP 4 pair CAT 6 LAN Cable in the existing surface/ recessed Steel/ PVC conduit as required.
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc. , complete as required. 63 mm dia (OD-63 mm & ID-51 mm nominal)
………………Do…………but size 120 mm dia (OD-120 mm & ID-103 mm nominal)
Comprehensive Annual Maintenance Contract Charges of entire project for 5 years.
Modern Electric Company (BID ID -392237)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_101102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .