Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹63.7 L
EMD Value
₹63,800
Closing Date
20 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Municipal Commissioner
Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd Stone, Chainlink, Grill/B.R.T.S. Railing on various Roads in South East Zone (Limbayat).
364691
Dy.Muni.Commissioner/SEZ/07/2026-27,Work No.11
Open
Paints / Enamels
Works
Surat
3 documents required · 3 mandatory
₹2,832
Commissioner, Surat Municipal Corporation
₹63,800
7 Nov 2026
7 Nov 2026
7 Nov 2026
20 Nov 2026
7 Nov 2026
120 days
Name of work : Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd
Stone, Chainlink, Grill/B.R.T.S. Railing on various Roads in
South East Zone (Limbayat).
Tender Notice (Online) No. Dy.Muni.Commissioner/SEZ/07/2026-27
VOLUME-I : TECHNICAL BID
DOWNLOAD OF TENDER DOCUMENTS : Dt. 07/11/2026 to Dt. 20/11/2026
FROM website smctender.nprocure.com upto 18.00 Hrs.
LAST DATE OF SUBMISSION OF ONLINE : On or Before Dt. 20/11/2026 upto
TENDER 18.00 hrs.
PRE BID MEETING TO BIDDER THE N.A.
LAST DATE OF SUBMISSION OF TENDER : During Dt. 02/12/2026 up to
FEES, EMD AND OTHER DOCUMENTS IN hrs. to Chief Accountant, SMC,
HARD COPY Tapibhavan, Surat by R.P.A.D./Speed
Opening of technical bids (online) : On Dt. 21/11/2026, 16.00 hrs.
Opening of price bids (online) : Intimated Later (Online)
ESTIMATED AMOUNT : Rs. 63,71,140.00 Ps. (Excluding GST)
DOCUMENT FEES : 2832.00 (WITH GST 18 %)
CLASS : "D"Class or Above
TENDER TO BE SUBMITTED TO:
THE CHIEF ACCOUNTANT,
SURAT MUNICIPAL CORPORATION, MUGLISARA
SURAT MUNICIPAL CORPORATION
TENDER DOCUMENT
5.0 SPECIAL CONDITIONS FOR PLACING EARNEST MONEY DEPOSIT AND SECURITY DEPOSIT ............
9.0 CONDITION FOR THE WATER SUPPLY & ELECTRIC SUPPLY....................................................................48
12.0 GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS ...........................................................
13.0 ITEMWISE DETAILED TECHNICAL SPECIFICATIONS ...............................................................................
SURAT MUNICIPAL CORPORATION
1.0 NOTICE INVITING TENDER
(A) RECEIPT AND OPENING OF TENDER :
Online Tenders will be received from the established and reliable contractors on or before 24.00 hours
From 07/11/2026 to 20/11/2026 upto 18.00 hrs. on website smc.nprocure.com. The tender
received after due time and date specified will not be accepted.
1. Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd Stone,
Chainlink, Grill/B.R.T.S. Railing on various Roads in South East Zone
2. ESTIMATED COST : Rs.63,71,140.00 Ps.(Excluding GST)
3. EARNEST MONEY DEPOSIT : Rs.
4. TIME LIMIT : 12(Twelve) Months (Excluding Monsoon)
5. Document Fee : Rs. 2832.00 (WITH GST 18 %)
5. Registration required :"D" class & Above
(C) OPENING OF TENDERS:
The tenders will be opened online in presence of bidders and opening authority subject to receipt of Tender
Fees & EMD in hard copy in account department (Main Office) . But tenderer has to upload relevant
documents as required /mentioned in the technical bid in Soft Copy (By Scanning) .The tenders will be
opened in two stages i.e Technical Bid and Commercial Bid.
(D) PURCHASE OF TENDER DOCUMENTS :
Tender Documents can be downloaded from smc.nprocure.com From 07/11/2026 to 20/11/2026
up to 18.00 hrs.
Tender documents fees of Rs. 2832.00 ( Inclusive GST )per set which is required for submission of
tender towards the cost of tender documents in cash, pay order or by demand draft of any nationalized
bank, in favour of "The Commissioner, Surat Municipal Corporation" payable at Surat and shall be submitted
alongwith EMD and other documents. The cost of the Tender Documents will not be refunded in any
circumstances. The Surat Municipal Corporation shall not be liable for any postal delay in any case.
E.M.D & Tender Fee shall be submitted in electronic format only through online(by scanning) while
uploading the bid. this submission shall mean that E.M.D and tender fee are received for purpose of
opening the bid. Accordingly, offer/tenders of those tenderers whose E.M.D & tender fee is received
electronically, shall be opened. However, for the purpose of realization of EMD and Tender fee ,bidder
shall send the EMD as well as Tender fee in required format in original through RPAD/Speed post so as to
reach to Account Department (Main office) within stipulated date as mentioned in tender notice for the
submission of tender FEE & E.M.D . Punitive action shall be initiated for non submission of EMD & Tender
fees in original to Account Department (Main Office)by bidder including abeyance of registration and
cancellation of E – tendering code for 6 (six) months. all documents in supporting of bid shall be in
electronic format only through online (by Scanning) during the bidding period & hard copy will not be
accepted separately.
All documents must be coloured scanned to be seen as original. Scanning in black and white or gray shall
not be acceptable.
All the documents must be notarised with clearly displaying stamp, number and name of the notary.
(E) CONTRACT PERIOD:
The total contract period is hereby fixed as 12(Twelve) months (Excluding Monsoon) from the 10th Day of
issuance of work order.
(F) Tenderer must comply with and agree to all instructions & requirements in the Notice and in the
Instructions to Tenderers, including requirements in the Contract Documents.
(a) All tenders must be submitted in the prescribed Tender form.
(b) Each Tender must be accompanied by the completion Schedule.
(c) Each tender must be accompanied by the Tender Security (Earnest Money Deposit) Rs.63,800/-
(d) The successful tenderer shall execute the Contract Agreement within fifteen days after the date of
Notice of award.
(e) The successful Tenderer will be required to furnish a performance bond (Security Deposit) of and
amount equal to (2%) Two percent of the tendered amount.
(f) The successful Tenderer shall furnish insurance in accordance with the contract documents.
(g) The Surat Municipal Corporation may withhold issuance of the Notice of proceed for a period not
exceeding fifteen days after the date of execution of the contract agreement.
(h) The tender and tender guarantee bond (Earnest Money Deposit) shall be submitted by the Agency
in whose name tender has been issued. Transfer of tender documents to any other party is
(i) All intending tenderers will have to purchase digital signatures in order to participate in the online
bidding process.
(j) All the applicant contractors are required to have their own employers code number under EPF
Act, 1952 and are required to comply the applicable provisions of said statute regularly and
(k) Further the contractors for services are required to produce the certified copies of paid challans in
respect of employees/workers employed by said contractor in respect of work allotted by Surat
Municipal Corporation, along with copies of Pay Roll and Muster Roll. If the same are not
produced, the bills will not be released.
(G) RECEIPT OF TENDER DOCUMENTS :
The following details are to be submitted online on smc.nprocure.com :
a. Document fees and EMD Details
b. Commercial Bid
The following details shall be submitted in hard copy at prescribed address :
a. Tender fees in prescribed format
b. Earnest Money Deposit in prescribed format
c. Annexure I to X alongwith all necessary supporting documents
Please note that commercial bid shall not be submitted in hard copy under any circumstances. This will hold
the tender liable for rejection.
(H) Tender Validity Period :
The validity period of the tender submitted for this work shall be of one hundred twenty (120) calendar days
from date of opening of the price bid for this work and the Tenderer shall not be allowed to withdraw or
modify the tender offer on his own during the validity period.
(I) Rights Reserved :
Without assigning any reason, The Surat Municipal Corporation reserves the right to reject the lowest or any
other or all tenders or part of its. To waive any informality or irregularity in any tender, which in the opinion
of the Surat Municipal Corporation does not appear to be in its best interest and the tenderer shall have no
cause of action or claim against the Surat Municipal Corporation or its officers, employee, successors or
assignees for rejection of this tender.
The Surat Municipal Corporation further reserves the right to withhold issuance of the notice to proceed,
after execution of the contract agreement by the successful Tenderer. The Surat Municipal Corporation is not
obliged to give reasons for any such action.
During Tender validity period, if any Tenderer withdraws or makes any modifications or additions in the
terms and conditions on his own in this tender, then The Surat Municipal Corporation shall without prejudice
to any right or remedy be at liberty to reject the tender and forfeit the Earnest Money Deposit in full. Such
Tenderer may be disqualified from tendering for further works under the jurisdiction of The Surat Municipal
The Surat Municipal Corporation reserves the right to increase or decrease the scope of work and split the
tender in two or more parts without assigning any reason even after the award of contract.
Executive Engineer,
SOUTH EAST ZONE (LIMBAYAT)
Surat Municipal Corporation
Signature of the Contractor:
ANNEXURE-I TO II FOR PRE-QUALIFICATION TO BE FILLED IN BY TENDERER
Performa for list of works of similar nature already completed by the Tenderer during last 7 years.
Sr. Name of work and Place Cost on Time taken in Client name Date of
No. Completion months to completion
Note: Bidder shall give completion certificate from client. In absent of such completion certificate, experience shall
not be considered for evaluation. If completion certificate covers "Similar work (as per IT-04) with other work" then
bidders shall have to submit copied of final bill indicating similar work or certificate of amount including "Similar
work" from relevant authority.
Please Fill above details attached separate sheet.
Signature of the Contractor
Performa for declaration regarding work on hand with the tender:
Sr. No. Name of Estimated Date of Stipulated Amount of Brief details Name of
work with Cost Issue of period of work done of delay if client
place work order completion any
Present liability = Total of column 3 - Total of column-6
Signature of the Contractor
Note: Amount of work done in Column 6, should be given up to the month previous to the month in which tender
Please Fill above details attached separate sheet.
SURAT MUNICIPAL CORPORATION
SOUTH EAST ZONE (LIMBAYAT)
2.0 CONTRACTOR TO PLEASE READ THIS CAREFULLY
(1) If the tender is taken in favour of the company, a company of attorney in favour of the person who may
have signed the tender for the conpany, must accompany the tender.
(2) Solvency certificate of current year Bank or a Revenue Officer of an amount upto 20% of the tender
cost plus works on the hand still to be executed will have to be produced by the contractor.
(3) Voucher for earnest money must accompany the tender. Tenderer may pay earnest money in form of a
crossed demand draft of a local Bank drawn in favour of the Municipal Commissioner. Earnest Money by
cheque shall not be accepted.
(4) The contractor shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment No. and Ward under he is which assessed.
(5) Copies of certificate as regards previous experience of Govt. or Semi Govt. Dept., if any must accompany
An attested copy of registration with MES, Various department of State Govt., Surat Municipal
Corporation, CPWD etc.
(6) Declaration showing all works on hand with the contractor and the value of works that remains to be
executed in each case must accompany the tender.
(7) All pages of Schedule: `A & B' & specification should be intialed by the contractor.
(8) All corrections, errasures & over writing should be initialed by the contractor.
(9) Descripancies and adjustment of errors:-Any error in quantity or amount in Schedule-`B' showing item of
words to be carried out shall be adjusted in accordance with the following rules:-
(a) In the event of a discrepancy between description in works and figures quoted by a tenderer in the
`rates' column, the descriptions in words shall prevail.
(b) In the event of and error occuring in the amount column of the Schedule- `B' showing items of works as a
result of worng multiplication of the unit rate and quantity, the units rate shall be regarded as firm and
multiplication shall be amended on the basis of the rate.
(c) All the errors in totalling in amount column and in carrying forwarded total shall be corrected.
(d) Any rounding of amounts against item' or in totals' shall be ignored.
The tendered sum so altered shall, for the purpose of the tenders, be substitued for the sum originally
tendered and considered for accetpance.
(10) (i) It may please be noted that the tender shall be considered as invalid specially, if the requirements as per
insiruction No.1 to 9 above are not compleied with before submitting the tender. Also please read
carefully the face sheet and "General Rules and Direction for the suidance of contractor" of his form.
(ii) Right is reserved to reject any or all tender (s) without assigning any person (s) thereof.
(11) In addition to the above the tender will also be liable to rejected outright if :-
(i) The tenderer proposes any alteration in the works specified or in the time allowed for carryin out the work
or any conditions or correction made in any code or made of Schedule-`B' or specifications.
(ii) Any of the page or pages of the tender is removed or replaced.
(iii) All corrections, additions or pasted slips are not initaled by the tenderer.
(iv) Any erasures is made by him in the tender
(v) The tenderer or in the case of a firm, each partner or person holding the power of attorny thereof does
not signed or the signature/s is/are not attested by awitness on page-9 of the tender in the space for the
(12) In respect of the tenders from the co-operative society, a solvency certificate of an amount equal to
20% of the amount of the work put to tender will have to be produced alongwith the tender or a
certificate regarding the borrowing capacity if the society issued by the leagal Assistant, Directorate of
Cottage Industries will have to be produced alongwith the tender.
(13) (1) The serveral documents formining the contract are the essential part of the contract and
requirement occuring in one is as binding as through occuring in all, they are intended to be mutually
explantory and complementary and to described and provide for a complete work.
(2) In the event of any descrpeaney, the serveral documents forming the contract or in any the document,
the following order or precedence should apply:-
(a) Dimension & quantities :-
(ii) Schedule-B of the tender form.
(iii) Specification.
On drawings, figures, dimensions, unless obviously incorrect will followed in preference to seeled
(b) Description :
(i) Scheudule-B of the tender form.
(ii ) Drawings.
(iii) Specifications.
In case of defective description or ambiguity, the Engineer- in-charge should issue further instructions
direction in what meanner the work is to be carried out it being understood that the best modern practice is
to followed. The contractor should forthwith comply with such instructions.
(3) The contractor should taken no advantage of any apparent error or ommission in drawings or specification
and the Engineer in charge shall make such corrections and interpretation as necessary to fulfil the intent
of the Plans and specifications.
(4) No with standing that all proper precautions may have been taken by contractor at all the times during
the progress of the work, the contract shall be held responsible for all damages whether to the work
under execution or to any other property or to lives of persons during the progress of the work and the
period of maintance.
(5) Plans are for rough guidance only when detailed plans are received from the Architect of corporation
during the course of execution the same will supersede previous plans
14. The contractor should appoint a qualified engineer and he must remain present on site during working
15 The Quantity mentioned in the scheduled "B" is Tentative (indicative) for each item. Tender shall
have to execute the concerned work/item as per the site condition and payment shall be made
accordingly as per the actual measurement of the particular item.
16 As per Commissoner Note No.C.N.129, dtd. 9/9/2016
E.M.D & Tender Fee shall be submitted in electronic format only through online(by scanning) while
uploading the bid. this submission shall mean that E.M.D and tender fee are received for purpose of
opening the bid. Accordingly, offer/tenders of those tenderers whose E.M.D & tender fee is received
electronically, shall be opened. However, for the purpose of realization of EMD and Tender fee ,bidder
shall send the EMD as well as Tender fee in required format in original through RPAD/Speed post so as to
reach to Account Department (Main office) within stipulated date as mentioned in tender notice for the
submission of tender FEE & E.M.D .Punitive action shall be initiated for non submission of EMD & Tender
fees in original to Account Department (Main Office)by bidder including abeyance of registration and
cancellation of E – tendering code for 6 (six) months. all documents in supporting of bid shall be in
electronic format only through online (by Scanning) during the bidding period & hard copy will not be
accepted separately.
All documents must be coloured scanned to be seen as original. Scanning in black and white or gray shall
not be acceptable.
All the documents must be notarised with clearly displaying stamp, number and name of the notary.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation
Signature of the Contractor
3.0 DECLARATION FORM
(1) I/We hereby declare that I/We have visited the site and fully acquainted myself/ourselves with the local
situation regarding materials, labour and other factors pertaining to the work before submitting this tender.
(2) I/We hereby declare that I/We have carefully studied the conditions of contract, specifications and other tender
documents of this work and agree to execute the same accordingly.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation
Contractor Signature with
4.0 INSTRUCTION TO TENDERERS
IT-01 GENERAL :
The Contract documents may be secured in accordance with the notice Inviting Tender for the work called.
The work shall include supply of materials necessary for construction of the work.
IT-02 INVITATION TO TENDER:
1. The Surat Municipal Corporation hereinafter referred to as the Corporation will receive tenders for the
Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd Stone, Chainlink, Grill/B.R.T.S. Railing on
various Roads in South East Zone (Limbayat) as per the specifications in the tender documents. The tenders
shall be opened in presence of opening authority Surat in the presence of tenderers or their representatives
who are present. The Corporation reserves the right to reject the lowest or any other or all tenders or part
of it which in the opinion of the Corporation does not appear to be in its best interest, and the tenderer shall
have no cause of action or claim against the corporation or its officers, employees, successors or assignees
for rejection of his tender.
IT-03 LANGUAGE OF TENDER :
Tenders shall be submitted in English, and all information in the tender shall also be in English, Information
in any other language shall be accompanies by its translation in English. Failure to comply with this may make
the tender liable to reject.
IT-04 QUALIFICATIONS OF TENDERERS:-
(A) Tenderer shall be required to submit the enlisted documents along with Technical Bid, E.M.D. and
tender fees. If documents are insufficient or it does not match the required criteria mentioned below, then
the Price Bid of the tenderer shall not be opened.
Mainly tenderer shall fulfill following the pre-qualification.
(a) Experience of having successfully completed similar works during last 7 years.
(b) Turnover during last 3 years, ending 31st March of previous financial year should be atleast 30% of
Estimated Cost. An attested copy of annual turnover for last 3 years should be enclosed.
(c) Solvency certificate from bankers of schedule bank/Nationalized bank for the 20% of tender amount.
Tenderer has to submit higher amount of bank solvency if so desired by Commissioner.
(d) An attested copy of registration with MES, Various department of State Govt., Surat Municipal
Corporation, CPWD etc.
(e) List of the works already complete last years in prescribed proforma as per Annexure-I and attested
copies of certificates from head of the office concerned for completion of the works.
(f) Declaration regarding the work on hand with the tender should also be given in prescribed performa as
per Annexture-II. Attested copies of work orders, interim certificates if any shall also be attach as supporting
(g) Attested cost of partnership deed, power of attorney etc if any.
Definition of "Similar work" means COLOUR Work of Road Divider, Footpath kerb, Kerb Stone, Guard
Stone, Chainlink, Grill/B.R.T.S. Railing, building.
IT-05 TENDER DOCUMENTS :
Printed and online documents and set of drawings shall comprehensively be referred to as Tender
documents. The several sections forming the documents are the essential parts of the contract and a
requirement occurring in one shall be binding as though occurring in all. They are to be taken as mutually
explanatory and describe and provide for complete works.
IT-06 EXAMINATION BY TENDERERS :
A. At his own expenses and prior to submitting his tender, each tenderer shall (a) examine the contract
Documents, (b) visit the site and determine local conditions which may effect the work including the
prevailing wages and other pertinent cost factors, (c) familiarize himself with all CENTRAL, State and
local laws, ordinance, rules, regulations and codes affecting the material supply including the cost of
permits and licenses required for the work and (d) correlate his observations, investigations, and
determinations with the requirements of the Tender Documents.
B. The tender quantity is approximate and may increase or decrease. Any increase or decrease in quantity
will not entitle tenderer to claim any extra over the quoted rate.
C. Tender Documents be completed by legible ink, checked in a responsible manner, signed, stamped and
returned together with the Tender Security Bond by the stipulated date, which shall form the Tender.
The Tenderer is required to complete :
(i) The form of tender, including the Appendices thereto Tender Security Bond and the Tender
summary duly signed and stamped.
All the pages in which entries are required to be made by the tenderer are contained in the tender
documents and the tenderer shall not take out or add to or amend the text of any of the documents
except in so far as may be necessary to comply with any addenda issued pursuant to Clause IT-17
IT-07 EARNEST MONEY DEPOSIT:
A. The Tender shall be accompanied by of Earnest Money Deposit Rs. 63,800.00. The
tenderer shall pay 100% EMD amount in form of crossed Demand Draft or Payorder
of Nationalised Bank payable at Surat issued in favour of "Commissioner, Surat
Municipal Corporation, Surat" through Nationalised/Schedule Bank only or as per City
Engineer Note No.61, dtd. 16/05/2021 the tenderer can pay Tender Fees & EMD
seperately through online by NEFT/RTGS/IMPS as mentioned in Clause 1 (D) on page
Number 8 of Technical bid Vol. I (Part-I). The Earnest Money Deposit in the form of FDR or
cheque shall not be accepted. The tenderer shall have to mention details of Earnest
Money Deposit on the seal cover of Earnest Money Deposit. The tender received without
Earnest Money Deposit shall be out rightly rejected
The instruments for Earnest Money Deposity shall be issued by or payable/encashable at Surat
Branch of the said nationalized bank.
(2) A U Small Finance Bank
(3) Bandhan Bank
(4) Barclays Bank
(5) City Union bank
(7) DBS Bank India Limited
(9) Equitas Small Finance Bank
(10) ESAF Small Finance Bank
(11) Federal Bank
(14) ICICI Bank
(16) IDFC First Bank
(17) Jammu and Kashmir Bank
(18) Jana Small Finance Bank
(19) Karnataka Bank
(20) Karur Vysya Bank
(21) Kotak Mahindra Bank
(22) South Indian Bank
(23) Standard Chartered Bank
(24) Tamilnad Mercantile Bank
(25) Utkarsh Small Finance Bank
(27) Ahmedabad Mercantile Co-op. Bank
(28) Nutan Nagrik Sahakri Bank Limited
(29) Rajkot Nagarik Sahkari Bank Ltd.
(30) Sarswat Co-operative Bank Ltd.
(31) SBPP Co-operative Bank Ltd.
(32) SVC Co-operative Bank Ltd.
(33) The Cosmos Co-op Bank Ltd.
(34) The Gujarat State Co-operative Bank
(35) The Mehsana Urban Co-Op. Bank Ltd.
(36) The Surat District Co-Op. Bank
(37) The Surat People's Co-Op. Bank Ltd.
(38) Saurashtra Gramin Bank
(39) The Kalupur Commercial Co-op.Bank
(40) The Panchmahal District Co-operative Bank
(41) The Baroda District Co-operative Bank
(42) Baroda Gujarat Gramin Bank
B. The Earnest Money Deposit (Tender guarantee) will be forfeited in the event, the
successful tenderer fails to accept the contract and fails to submit the Performance
Guarantee Bond to the owner as stipulated in this tender documents within ten days after
receipt of notice of award of contract. In such case owner may disqualify the tenderer
from tendering for further works, under the jurisdictions of the Corporation (S.M.C.)
C. The Earnest Money Deposit of the successful tender shall be returned after the
performance guarantee bond, as required, if furnished by the contractor.
D. No interest shall be paid by the owner on any tender guarantee.
IT-08 INCOME TAX CLEARANCE CERTIFICATE :
In view of the latest circular of IT Department IT clearance certificate is not required. However
the contractor shall give attested photo copy of the PAN card and a copy of last three years income
tax return. Also provide GST Number and necessary documents as per Govt resolution
IT-09 PREPARATION OF TENDER DOCUMENTS :
Tenderers are requested to note the following while preparing the Tender Documents:
A. Technical bid, EMD and Tender fees shall be submitted on the Tender Form bound herein in
English. All tender items and statements shall be properly filled in. Numbers shall be stated
both in words and in figures where so indicated, and signatures of all persons signing shall be
B. Technical Bid shall be accompanied by the prescribed tender security bond and other required
documents and drawings. All witnesses and sureties shall be persons of status and probity and
their full names, occupations and address shall be stated below their signatures. All signatures
in the Tender Documents shall be dated.
C. Variations to the Contract Documents requested by the tenderer may be affixed to the Tender
Document in the space available and duly signed and stamped. Such variations may be
approved or refused by the Engineer at the time of adjudications of Tenders, and in either case
the Engineer is not obliged to give reasons for his decisions.
D. Delivery of Tenders shall comply with Notice inviting tenders as to place, date and time.
E. Price Bid shall be submitted online. Tenderers are requested to quote for all four parts of the
IT 10 SUBMISSION OF TENDERER DOCUMENT :-
1. Following documents shall be submitted in HARD COPY TO Surat Municipal Corporation:
All necessary documents mentioned in Technical bid (if any).
Tender Fees prescribed format.
Earnest Money Deposit as mentioned in the tender. (i.e. D.D.)
Affidavit on non-Judicial stamp paper of Rs.300/- as per Annexure-A.
Under taking by the tenderer for Annexure-E not black listed on Rs.300/- government stamp
Addenda Corrigendum (if any) duly signed by Contractor.
Technical bid and price bid are not to be submitted in physical form. Please note that non submission of
Technical Bid as well as price bid does not absolve the bidders from any liability created from the bid
condition and bidding process. Technical-Bid and Price Bid in hard copy shall be submitted by
Successful bidder upon intimation from Surat Municipal Corporation.
(i) COVER-1 : Technical Bid E.M.D and Tender Fees for the work of Colour Work for Road Divider, Footpath,
Kerb Stone, Gaurd Stone, Chainlink, Grill/B.R.T.S. Railing on various T.P. Roads of Subzone-A in South East Zone
(Limbayat) along with other Documents in Hard Copy during 07/11/2026 to 20/11/2026 up to 18.00 hrs.
Also mention the name of tenderer, address, tender notice number etc. on the cover .
(ii) PRICE BID Price bid for the work of Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd Stone,
Chainlink, Grill/B.R.T.S. Railing on various Roads in South East Zone (Limbayat) shall be submitted online. The name
of work to be written on cover shall be work of Colour Work for Road Divider, Footpath, Kerb Stone, Gaurd Stone,
Chainlink, Grill/B.R.T.S. Railing on various Roads in South East Zone (Limbayat). Also mention the name and the
address of tenderer, tender notice number on the cover and to be submitted to the Chief Accountant, Surat Municipal
Corporation, Muglisara, Surat – 395
2. Tenderer shall be required to submit the enlisted documents as mentioned below in Cover-1. If necessary
document founds insufficient then the Price Bid of the tenderer shall not be opened.
(a) The tender shall be accompanied by Earnest Money Deposit of Rs.63,800.00 The tenderer will pay
Earnest Money Deposit by Pay Order/Demand Draft issued in favour of "Commissioner, Surat
Municipal Corporation, Surat" by Nationalized Bank. In the form of Demand Draft and Bank
(b) A covering letter detailing various considerations considered in tender shall invariably be given.
(c) Passport size photographs of all the partners (incase of partnership firm) to be fixed on relevant
Page of the tender documents.
3. (a) List of tools, plants and equipments with tenderer in detail.
(b) Technical establishment/staff of the tenderer in required Performa with their names, qualifications
and experience.
(c) Tenderer shall furnish along with the tender, information regarding Income tax circle of the
district in which he is assessed for income tax with PAN No.
4. Submission of a tender by a tenderer shall mean that he has read this notice and contract documents and has
made himself aware of the scope and specifications of the work to be done and of conditions and nature of
required quantities of materials stores, tools and plants etc. that may be required by him in carrying out the
work and of local conditions and laws and bylaws of the Government, Surat Municipal Corporation and
other factors bearing influence on the execution and cost of the works.
5. E.M.D., Tender Fee and other necessary document in hard copy shall be received by Registered Post A.D. or
by Speed Post through Postal Authority only by the "Chief Accountant, Surat Municipal Corporation,
Muglisara, Surat-395003 on during 07/11/2026 to 20/11/2026 up to 18.00 hrs.
The same will be opened on the 21/11/2026 (Technical Bid) (Probable) on wards in the presence of the
tenderers, who shall remain present in the office of "Tender opening officer, Surat Municipal Corporation,
Surat. Late tenders (i.e. tenders received after the specified time of opening), delayed tender (i.e. tenders
received before the time of opening but after due date and the time of receipt of tender) shall not be
considered at all. Tenders received by Registered Post A.D./ Speed Post after the time and the date
specified in the tender notice shall not be received by the client from the postman. Such tenders if received
will not be opened and will stand rejected.
6. Tender shall stand rejected if:
1. Any eraser is made in the tender unauthenticated or any page or pages is/are removed or replaced.
2. The tenderer shall submit the tender which satisfied each and every conditions laid down in the
notice tender documents, failing which the tender will be liable for rejection.
3. Tenderer's tender/quotation containing conditions shall be liable for rejection out rightly without
assigning any reason for the same.
4. Stipulates the validity period less than what is stated in the form or tender.
5. Stipulates his own conditions.
6. Does not quote his rates inclusive of Octroi duty and other terminal or sales tax or CENTRAL taxes
7. Does not disclose the full names and address of all his partners in the case of partnership firm.
8. Does not pay the Earnest Money Deposit by Demand Draft/Pay order and Tender Fees with
Technical Bid (Cover-1).
9. Does not submit the tender before the stipulated time and specified date in the Account Office as
10. Does not attached the document mentioned.
11. The tenderer proposes any alteration in the work specified in the tender or in the time limit allowed
for carrying out the work or any other condition.
7. All corrections, additions or posted slips to be initialed by the tenderer.
8. All page of tender documents including specifications should be initialed by the contractor.
9. The tenderer shall submit the tender which satisfies each and every conditions laid down in this notice and
tender documents failing which the tender is liable for rejection.
10. Notice of inviting tenders shall be a part of the contract documents.
11. Acceptance of tenderer/quotation will rest with the competent authority of Surat Municipal Corporation
who does not bind himself to accept the lowest and reserves the right to accept or to reject any or all
quotations/tenders and no reasons will be given for acceptance or rejection thereof.
12. The contractor shall also attach list of machineries, tools, plants, equipments which he propose to deploy for
13. All octroi duty and other taxes chargeable by the Municipal Corporation shall be payable by the Contractor.
14. Tender once accepted shall be binding on the contractor even if the formal agreement is not signed.
15. Tender once offered can not be withdrawn except with the permission of head of the concerned department,
Surat Municipal Corporation, Surat.
16. The successful tenderer shall be required to enter in to agreement with Municipal Corporation after placing
the work order for the said work from SMC.
17. The successful tenderer may be required to furnish surety of 20% of the contract value on stamp paper if so
desired by the Municipal Commissioner.
18. The tenderers are requested to give complete specification of work quoted.
19. Unless specifically mentioned by the tenderer for the extra payment of taxes on price quoted by them it will
be presumed the prices quoted are inclusive of the all taxes and no claim will be entertained for payment
of extra taxes on the bills submitted by them.
20. The Price-bid will be opened only after technical clarifications are clarified.
21. Surat Municipal Corporation reserves the right to open or not to open any or all Price-bid without assigning
any reason thereof.
IT-11 TENDER VALIDITY PERIOD :
The validity period of the tender submitted for this work shall be of one hundred twenty (120) Calendar day
from the date of opening of price bid and that the tenderer shall not be allowed to withdraw or modify the
tender offer on his own during the validity period. The tenderer will not be allowed to withdraw the tender
or make any modifications or additions in the terms and conditions of his own in his tender. If this is done
then the owner shall, without prejudice to any right or remedy, be at liberty to reject the tender and forfeit
the Earnest Money Deposit in full.
IT-12 SIGNING OF TENDER DOCUMENTS :
If the Tender is made by an individual it shall be signed with his full name above his current address. If he
tender is made by a Proprietary firm it shall be signed by the proprietor above his name and the name of his
firm with his current address.
If the tender is made by a firm in partnership it shall be signed by all the partners of the firm above their full
names and current addresses, or by a partner holding the power of attorney for the firm signing the Tender
in which case a certified copy of the power of attorney shall accompany the Tender. A certified copy of the
partnership deed, current addresses of all the partners of the firm shall also accompany the tender.
If the tender is made by a limited company or a limited Corporation, it shall be by a duly authorised person
holding the power of attorney for signing the Tender in which case a certified copy of the power of attorney
shall accompany the Tender. Such limited company or Corporation may be required to furnished satisfactory
evidence of its existence before the contract is award.
All witnesses and sureties shall be persons of status and probity and their full names, occupations and
addresses shall be stated below their signatures. All signatures in the Tender document shall be dated.
IT-13 WITHDRAWAL OF TENDERS :
If, during the Tender validity period, the Tenderer withdraws his Tender, the Tender Security (Earnest
Money) shall be forfeited and the Tenderer may be disqualified from tendering for further works under the
jurisdiction of SURAT MUNICIPAL CORPORATION
IT-14 INTERPRETATIONS OF TENDER DOCUMENT :
Tenderers shall carefully examine the tender documents and fully inform themselves as to all the conditions
and matters which may in any way effect the work or the cost thereof. Should a tenderer find discrepancies
or omission from the specifications or other documents, or should be in doubt as to their meaning, he
should at once address querry to the Divisional Head provided for concerned authority as referred in the
Tender Document in Clause GC-01 (Definitions and interpretations) of the (General Condition of Contract).
Any resulting interpretation of the Tender documents will be issued to all Tenderers as an addenda
corrigendum. Verbal clarification and / or information given by the SMC / Consulting Engineer shall not be
binding on the Municipal Corporation.
IT-15 ERRORS AND DISCREPANCIES IN TENDERS :
In case of conflict between the figures and words in the rates, the rates expressed in words shall prevail and
apply in such cases.
IT-16 MODIFICATION OF DOCUMENTS :
Modification of specifications and extension of the closing date of the tender, if required, will be made by
an addendum. Copies of each addendum will be sent to all tenderers. These shall be Signed and shall form a
part of tender. The tenderer shall not add to or amend the text of any of the documents except in so far as
may be necessary to comply with any addenda.
Addenda form part of the contract documents & full consideration shall be given to all addenda in the
preparation of tenders. Tenderers shall verify the number of addenda issued, if, any and acknowledge the
receipt of all Addenda in the Tender. Failure to acknowledge may cause the Tender to be rejected.
A. The Engineer of the owner may issue Addenda to advise Tenderers of changed requirements. Such
addenda may modify previously issued Addenda.
B. No Addendum may be issued after the time stated in Notice Inviting Tenders.
IT-18 TAXES AND DUTIES ON MATERIAL :
All charges on account of Octroi, terminal tax or Sales tax etc. and other duties on material obtain for the
works from any source shall be borne by the Contractor. 'P' and 'C' form shall not be supplied by the
Municipal Corporation.
IT-19 EVALUATION OF TENDERS : DELETED
IT-20 EVALUATION OF TIME REQUIRED FOR COMPLETION :
The time required for completion of work shall be considered as indicated by the tenderer in the completion
schedule attached with the tender. The completion period mentioned in this schedule is to be reckoned from
10th day from the date of work order to proceed. Total completion period is calendar months from 10th day
from date of issue of work order and tenderers should adhere to this delivery time.
IT-21 POLICY FOR TENDER UNDER CONSIDERATION :
Tenders shall be termed to be under consideration from the opening of the tender until such time an official
announcement of award is made.
While tenders are under consideration, tenderers and their representative or other interested parties are
advised to refrain from connecting by any means Municipal Corporation or representatives on matters
related to the tenders under study. The Engineer's representative if necessary will obtain clarification on
tenders by requesting information from any or all the tenderers either in writing or through personal
contact, as may be necessary. The tenderers will not be permitted to change the substance of his tender
after price submission. Non-compliance with this provision shall make the tender liable for rejection.
IT-22 PRICES AND PAYMENTS :
The tenderer must understand clearly that the price quoted are for the total works or the part of the total
works quoted for and include all costs due to materials labour, equipment, supervisions, other services,
royalties and Octroi etc. and to include all extras to cover the cost. No claim for additional payment beyond
the prices quoted will be entertained and the tenderer will not be entitled subsequently to make any claim
on any ground excepting for the condition laid down in GC-35 (Price Adjustment).
IT-23 PAYMENT TERMS :
The terms of payment are defined in the General Conditions of Contract. The Municipal Corporation shall
not under any circumstances relax, their terms of payment and will not consider any alternative payment
terms. Tenderers should therefore in their own interest note this provision to avoid rejection of their
Award of the Contract or the rejection of tenders will be made during the Tender validity period stated in the
Notice Inviting Tenders.
A. After all contract contingencies are satisfied and the Notice of Award is issued, the successful Tenderer
shall execute the Contract Agreement within the time stated in the Notice Inviting Tenders and shall
furnish the Bond as required herein. The Contract Agreement shall be executed in the form stipulated by
the owner. A copy of the required form is included in the contract documents.
B. If the Tenderer receiving the Notice of Award fails or refuses to execute the Contract Agreement within
the stated time limit or fails or refuses to furnish the Bond as required herein, the SMC may annul his
award and declare the tender security forfeited.
C. A Corporation, Partnership firm or other consortium acting as the Tenderer and receiving the Award
shall furnish evidence of its existence and evidence that the officer signing the Contract Agreement &
Bonds for the Corporation, partnership firm or other consortium acting as the Tenderer is duly
authorised to do so.
IT-25 SIGNING OF CONTRACT :
The successful tender shall be required to pay the security deposit and to execute the contract within
days of receipt of intimation to execute the contract, failing which the Municipal Corporation will be entitled
to annul the award and forfeit the Earnest Money Deposit. The person to sign the contract document shall
be person detailed in Article IT-12.
IT-26 DISQUALIFICATION :
A tender shall be disqualified and will not be taken for consideration if :-
(a) The outer envelope does not show on the outside the reference of bid and thus get opened before the
due date of opening (as per Article IT-10 i.e. Submission of Tender Document).
(b) The tender Security Deposit is not deposited in full and in the manner i.e. Earnest Money Deposit.
(c) The tender is in a language other than English or does not contain its English Translation in case of other
language adopted for tender preparation.
(d) The tender documents are not signed by an authorised person.
(e) The general performance data for qualification not submitted fully.
(f) The tenderer does not agree to deposit security amount as specified (as per Article IT-25 i.e. Signing of
(g) The tenderer does not agree to payment terms defined as per Article IT-23 i.e. Payment Terms.)
(h) Conditional tender.
A. Tenderer may further be disqualified if :
(a) Price variation is proposed by the Tenderer on any principles other than provided in the Tender
(b) Completion schedule offered is not consistent with the completion schedule defined and
specified in tender documents.
(c) The validity of tender is less than that mentioned in Article IT-11 i. e. Tender Validity Period.
(d) Any of the page or pages of tender is/are removed or replaced.
(e) All corrections or pasted slips are not initialed by tenderer.
(f) Any erasure is made in the tender.
IT-27 PERFORMANCE GUARANTEE (SECURITY DEPOSIT) :
As a contract security the tenderer to whom the award is made shall furnish a performanceguarantee
(Security Deposit) for amount equal to Two percent (2%) of the contract price to guarantee the faithful
performance completion and maintenance of the works of the contract in accordance with all the conditions
and terms specified herein and to the satisfaction of the Engineer and ensuring the discharge of all
obligations arising from the execution of contract, inone of the forms mentioned below.
(a) Initial Security Deposit of 2% (Shall be Released after completion of final bill as well as defect liability
period & on completion of audit related procedure)
(b) 5% Retention money deposit to be deducted from running bills (Shall be released with final bills)
Note: 2% Initial Security deposit shall be deposited in the form of Cash/DD/Pay order only.
Security deposit shall be paid in time and if it is paid after ten (10) days from the date of preliminary
work order then the penalty of 0.065 % per day of the amount of security deposit shall be recovered from
the contractor while receiving the security deposit. On due performance and completion of the contract in
all respects, the performance guarantee (security deposit) will be returned to the contractor after the defect
liability period and on completion of audit related procedure. It is clarified that the amount of security
deposit shall be collected on the basis of Contract Price and not on the basis of estimated amount put to
tender. As initial Security Deposit Two percent (2%) of the tendered amount accepted by the competent
authority shall have to be paid towards security deposit at the time of execution of agreement. This will be
known as initial security deposit which will be released after the total completion of contract after
completion of final bill as well as defect liability period & on completion of audit related procedure.
Five percent (5%) shall be deducted from running bills as retention money.
IT-27.1 ADDITIONAL PERFORMANCE SECURITY DEPOSIT( as per I/C City Engineer note No.
I/C CE/OUT/NO.14, dt.13/10/2026) :
(a) if the contract Price offered by the selected Bidder is lower than 10% but upto 20% of the estimated
Project Cost, then the Additional performance Security shall be calculated @ 20% of the difference in the (i)
Estimated Project Cost (as mentioned in Bid Document )-(Minus) 10%of the Estimated Project Cost and (ii)
Contract Price Offered by the Selected Bidder.
(b) if the contract Price offered by the selected Bidder is lower than 20% of the estimated Project Cost, then
the Additional performance Security shall be calculated @ 30% of the difference in the (i) Estimated Project
Cost (as mentioned in Bid Document )-(Minus) 10%of the Estimated Project Cost and (ii) Contract Price
Offered by the Selected Bidder
(c) This Additional performance Security shall be treated as part of the Performance Security
(d) Additional performance security deposit shall be valid beyond 28 days of project completion date.
IT-28 STAMP DUTY :The successful tenderer shall have to enter into an agreement on a non-judicial
stamp paper of Rs.4.90% of S.D. Amount, if S.D. Amount paid in form of FDR and otherwise as
per the form of the agreement approved by the Municipal Corporation, Surat.
The Surety shall be executed on stamp paper worth Rs.300/-..
IT-29 BRAND NAMES :
Specific references in the specifications to any materials by tender's name, or catalogue number shall be
construed as establishing a standard or quality and performance and not as limiting competition and the
tenderer in such cases, may at their option freely use any other product, provided that it ensures and equal
or higher quality than the standard mentioned and meets Municipal Corporation approval.
IT-30 NON-TRANSFERABLE :
Tender documents are not transferable.
IT-31 COST OF TENDERING :
The owner will not defray expenses incurred by Tenderers in tendering.
IT-32 DEFECT OF TENDER :
The Tender for the work shall remain open for a period of 120 calendar days from the date of receipt of the
tenders for this work and that the tenderer shall not be allowed to withdraw or modify the offer on his own
during the period. If any tenderer withdraws or makes any modifications or additions in the terms and
conditions on his own, then the Municipal Corporation, shall without prejudice to any right or remedy, be at
liberty to reject the tender and forfeit the earnest money in full.
IT-33 CHANGE IN A QUANTITY :
The Surat Municipal Corporation reserves the right to waive any informality in any tender and to reject one
or all tenders without assigning any reasons for such rejections and also to very to quantities of items or
group as specified in the Schedule of price as may be necessary. Claim what so ever by the contractor on the
basis of variation of quantities shall not be entertained.
IT-34 NEW EQUIPMENT AND MATERIAL ;
All materials, equipment and spare parts thereof shall be new, unused and originally coming from
manufacturer's plant to the Corporation. The rebuilt or overhauled equipment/materials will not be allowed
to be used on work.
IT-35 RIGHTS RESERVED ;
The SMC reserves the right to reject any or all tenders, to waive any informality or irregularity in any tender
without assigning any reasons. The SMC further reserves the right to withhold issuance of the notice to
proceed, after execution of the contract agreement, for the period of time stated in the notice inviting
tenders and no additional payment will be made to the successful tenderer on account of such withholding.
The SMC is not obliged to give reasons for any such action.
IT-36 Municipal Commissioner reserves the right to reduce the scope of work and split the tender in two or more
parts without assigning any reason even after the award of contract.
IT-37 No mobilisation advance or advance on machinery will be given.
IT-38 The scope of work is clearly mentioned in the tender documents. The contractor shall have to carry out the
work in accordance with the details specifications. No conditions will be accepted. The conditional tender
will be liable to be rejected.
IT-39 The surplus excavated earth, after backfilling the trenches shall have to be removed from the site as
After compaction and consolidation, if any short fall of earth is found then contractor has to bring the same
to the required quantity in order to meet shortfall at his own cost. More over, if any settlement of road after
reinstatement is observed during the defect liability period of the work. Contractor shall be fully responsible
for the defective work and patches/ depression / settlement shall be repaired with quarry spoil or metal at
contractor's own cost. If contractor fails to repair the patches / depression / settlement in time, corporation
will repair it at all risk and cost of contractor.
Surplus earth shall not be disposed off in a way that leads to nuisance to the public or SMC.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation,
SIGNATURE OF THE CONTRACTOR.
SURAT MUNICIPAL CORPORATION
PERCENTAGE RATE TENDER & CONTRACT FOR WORKS
5.0 SPECIAL CONDITIONS FOR PLACING EARNEST MONEY DEPOSIT AND SECURITY DEPOSIT
(1) The Tenderer shall place Tender Deposit/Earnest Money Deposit by Demand Draft or pay order drawn on
any Nationalized /Scheduled Bank situated in Surat favouring "Commissioner" Surat Mahanagar Seva Sadan and
payable at Surat only. The Tender Deposit/Earnest money deposit in any other form shall not be accepted and in that
case the tender shall be liable for rejection without assigning any reason what soeverfor such rejection.
2) On awarding the contract : The Awardee/Contractor/Supplier shall place security deposit at such rate of
the consideration of contract as the authority may specifically require to place which shall not be in any form other
than in CASH, Demand Draft or Fixed Deposit of any branch of Nationalized/Scheduled Bank having its branch at
Surat. The fixed deposit so placed as Security measure for due performance of the contract should be strictly in
the name of Commissioner, Surat Mahanagar Seva Sadan only. The Security so placed shall be liable for forfeiture
for violation or breach of any clause or clauses of the contract without assigning any reason whatsoever for such
Where the tenderer desires to place the Security Deposit in form of fixed deposit receipt of any Scheduled
Bank outside Surat City, the Account of the same shall have to be transferred by him to any of its branch at Surat. So
as to make the amount of such FDR encashable and payable at the branches of any Scheduled Bank situated at Surat
(3) No interest shall be paid on Tender Deposit/Earnest Money Deposit or Security Deposit placed in
Cash/D.D. at any time by the Surat Municipal Corporation (The Contractee). Similarly, if the Awardee/Contractor/
Supplier desire to place Security Deposit in the form of Fixed Deposit as above, the same shall be strictly for minimum
period of two years or entire contractual liability period whichever is less. In case when the contract period is for
more than two years, the Security Deposit to be placed in the form of Fixed Deposit as above shall be initially for a
period of not less than two years and the Corporation will renew fixed deposit receipt or reinvest the amount
thereof alongwith the interest accrued thereon for the remaining period of the contractual liability. In any other
case, the Corporation will not and does not undertake responsibility to renew the Fixed Deposit Receipt or reinvest
the amount thereof nor will it should any responsibility to collect and disburse interest accrued during the
contractual liability period. Any loss that might cause due to non renewal or such Fixed Deposit Receipt(s) shall
solely lie with the concerned Awardee/Contractor/Supplier.
4. (i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that extent
4. (i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that extent
may be refunded to the Contractor while releasing the payment of final bill.
In short, the S.D. to be retained by the Corporation after payment of final bill shall be equal to 5% of the
amount of final bill as per the prevailing norms or as per the norms decided from time to time.
(ii)If there is increase in amount of work more than 5% of the contract value, the additional S.D. should be
recovered from the running bill. When the total amount of workdone by the Contractor upto running bills under
recovered from the running bill. When the total amount of workdone by the Contractor upto running bills under
consideration is more than 5% of the contract value. However, such S.D. shall be recovered in the round figure of
Rs. 1000/- i. e. the amount of workdone when it exceeds 5% of the contract value it shall be rounded of the nearest
multiple of Rs. 25,000/- such additional S.D. shall be recovered for the works amount to Rs. 5 Lacs or more at the rate
of 4% of the additional amount.
(iii)In many cases, the contractors are stopping the work half- way due to number of reasons and when the
department has to take actions in accordance to clause 3(a) or (b) or (c) of the contract the remaining work has to
be carried out by advertising the tender for the remaining work and the whole administrative process right from
inviting tenders to finalising the tender etc.shall be reapeted.
In such cases a fixed amount of Rs.1000/- should be recovered from the original contractor towards the cost
of advertisement and other administrative charges incurred by the department in finalising the contract for the
remaining work. In case a seperate advertisement is issued for a single work actual cost of advertisement shall be
recovered such recovery shall be in addition to the recovery to be made under clause-3 or such other relevant
5. Contractor should place security deposits for tendered amounts. At present security deposit is recovered
from the tender in following manner :
(i) 2% of the total tendered amount to be deposited by the successful tenderer before commencement of the
work either in form of Cash, Demand Draft or Fixed Deposit Receipt of any Nationalized/Scheduled Bank having its
branch at Surat within 10 days from the date of receipt of work order and if the successful tenderer fails to do so, a
penalty at the rate of 0.065% of S.D. Amount per day shall be charge for delayed period. Security deposit shall be
released after completion defect liability period.
TENDER CONDITION: E.M.D. & tender fee
Demand Draft for E.M.D. & Tender (Bid) fee shall be submitted in electronic format through online mode (by
scanning) while uploading the bid. This submission shall mean that E.M.D. & tender fee are received for
purpose of opening of the bid. Accordingly offer of those shall be opened whose E.M.D. & tender (bid) fee is
received electronically. However, for the purpose of realization of D.D. bidder shall send the D.D. in original
through RPAD / Speed post reach to Chief Accountant, SMC within 7 days from the last date of online
submission of the bid as per tender notice.
Penaltative action will be taken for not submitting original Demand Draft in the account department of Surat
Municipal Corporation within 7 days from the last date of online submission of the bid for the first time as
mentioned below.
Sr. No. Tender Amount Penalty Amount in Rs.
1. Up to Rs. 1 Crore Rs. 10,000/-
2. More than Rs. 1 Crore and Upto Rs. 10 Crore Rs. 20,000/-
3. More than Rs. 10 Crore and Upto Rs. 50 Crore Rs. 30,000/-
4. More than Rs. 50 Crore and Upto Rs. 100 Crore Rs. 70,000/-
5. More than Rs. 100 Crore Rs. 1,00,000/-
If bidder will not submit the penalty amount within 10 days to Surat Municipal Corporation and/or bidder will
not submit the demand draft in original for the second time and after, Penaltative action shall be taken for
abeyance of registration and cancellation of E-tendering code for 6 (six) months.
Any documents in supporting of bid shall be in electronic format only through online (by scanning) & hard
copy will not be accepted separately.
(ii) 5% of the work done amount shall be deducted as retaintion money from the running account bill which
will be released at the time of final bill.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation.
SIGNATURE OF THE CONTRACTOR.
6.0 GENERAL CONDITION OF CONTRACT
GC-01 DEFINITIONS AND INTERPRETATIONS :
1.0 In the contract documents, as herein defined the following words and expression used shall, unless,
repugnant to the subject or context thereof, have the following meanings assigned to them.
1.1 The "Owner/Municipal Corporation, Surat represen-ted by Municipal Commissioner/Add.City Engineer, any
officer authorised by the Municipal Corporation.
1.2 The "Contractor" shall mean the person or the persons, firm of company whose tender has been accepted
by the owner and includes his legal representative successors and permitted assignes.
1.3 The "Engineer-in-charge" shall mean the person designated as such by the owner from time to time and
shall include those who are expressly authorised by the Municipal Corporation to act for and on its behalf for the
operation of this contract.
1.4 "Engineer - in - charge's Representative" shall mean any Engineer or Asstt. to the Engineer-in-charge
designated from time to time by the Engineer-in-charge to perform duties set forth in the Tender documents
whose authority shall be notified in writing to the Contractor by the Engineer-in-charge.
1.5 "Tender" The offer or proposal of the Tenderer submitted in the prescribed form setting forth the prices
for the work to be performed, and the details thereof.
1.6 "Contract Price shall mean total money payable to the Contractor under the contract documents.
1.7 "Addenda" shall mean the written or graphic notices prior to submission of tender which modify or
interpret the contract documents.
1.8 "Contract Time" - The number of consecultative calendar months for the completion of work as stated
in the executed contract agreement.
1.9 "Contract" shall mean agreements between the parties for the execution of works including therein all
contract documents.
1.10 "Tender document" shall mean Designs, Drawings, specifica- tions, agreed variations, if any, and such other
documents constituting the tender and acceptance thereof.
1.11 "The Sub-Contractor" means any person, firm or company (other than the contractor) to whom any part
of the work has been entrusted by the Contractor with the written consent of the Engineer-in-charge and the
legal personnel representative, successors and permitted assigness of such person, firm or company.
1.12 "The Specifications" shall mean all directions' the various technical specifications provisions and
requirements attached to the contract which pertain to the method and manner or performing the work to the
quality of the work and the materials to be furnished under the contract for the work and any order(s) or
instruction (a) thereunder. It shall also mean the latest Indian Standards Institution Specifications for or relative to
the particular work or part there of, so far as they are not contrary to the Tender specifications or I.S.I.
specifications, and in absence of any tender specifications, the specifications of any other country applied in India
as a matter of Standard Engineering practice and apprroved in writing by the Engineer-in-charge with or without
1.13 The "Drawing" shall include maps, plans, tracings or prints thereof with any modifications approved in
writing by the Engineer-in-charge and such other drawings, as may, from time to time, be furnished or approved in
writing by the Engineer-in-charge in connection with the work.
1.14 The "Work" shall mean the works to be executed in accordance with the context or the part thereof as
the case may be and shall include extra, additional altered or substituted works as required for the purpose of
the Contract. It shall mean the totally of the work by expression or implication envisaged in the contract and
shall include all material, equipment and labour required for or relative or incidental to or in connection with the
commencement, performance and completion of any work and/or for incorporation in the work.
1.15 The "Permanent work"means works which will be incorporation in and form part of the work to be
handed over to the owner by the contractor on completion of the contract.
1.16 The "Temporary Work" shall mean all temporary works of every kind required in or about the execution,
completion and maintenance ofthe work.
1.17 "Site shall mean the land and other place on, under, on or through which the work is to be carried out
and any other lands or places provided by the Municipal Corporation for the purpose of the Contract together with
any other places designated in the Contract as forming part of the site.
1.18 "The Construction Equipment" means all appliance/equipments of whatever nature required in or for
execution, completion or maintenance of work or temporary works (as hereinafter defined) but does not include
materials or other things intended to form or forming part of the permanent work.
1.19 "Notice in Writing or Written Notice" means a notice written, types or printed form delivered
personally or sent by Regisgered post to the latest know private of business address at Registered Office of the
1.20 The "Alteration/Variation order" means an orders given in writing by the Engineer-in-charge to effect
additions to or deletion from and alterations in the work.
1.21 "Final Test Certificate" shall mean the final test Certificate issued by the owner within the provisions
of the Contract.
1.22 The "Completion Certificate" shall mean a certificate to be issued by the Engineer-in-charge when the
work has been completed to his satisfaction.
1.23 The "Final Certificate" shall mean the final certificate issued by the Engineer-in-charge after the work is
finally accepted by the owner.
1.24 "Defect Liability Period" shall mean the specified period between the issue of completion Certifi-cate and
the final certificate as specificed in the tender.
1.25 "Approved" shall mean approved in writing including subsequent modification in writing of previous
verbal approval and "Approval" means approved in writing including as aforesaid.
1.26 "Letter of Acceptance"shall mean an intimated by a letter to tenderer that the tender has been accepted in
accordance with provisions contained therein.
1.27 "Order" and "Instruction" shall respectively mean any written order or instruction given by the
Engineer-in- charge within the scope of his powers in terms of the Contract.
1.28 "Running Account Bill" shall mean a Bill for the payment of "On Account" money to the contractor during
the progress of work on the basis of work done and the non-perishable materials to be incorporated in the work
supplied by the Contractor.
1.29 "Security Deposit" shall mean the deposit to be held by the owner as security for the due performance of
contractual obligations.
1.30 "The appointing authority" for the purpose of Arbitration shall be the Municipal Commissioner, Surat
Municipal Corporation, Surat.
1.31 Retention Money shall mean the money retained from R.A.Bill for due completion of "NET WORK'.
1.32 Unless otherwise specifically stated, the masculine gender shall include the faminine and natural
genders and viceversa and the singular shall include the plural and vice-versa.
GC-02 LOCATION OF SITE AND ACCESSIBILITY :
The site of works is within the limits of Surat Municipal Corporation. It is served by all weather roads
and Western Railway Broad Guage line, Government Irrigation Canal Crossing. The intending Tenderer should
inspect the site and make himself familier with site conditions and available communication facilities. Non
availability of access/roads shall in no case be the cause to condon any delay in the execution of the work or be
the cause for any claims or extra compensation.
GC-03 SCOPE OF WORK :
The scope of work is defined broadly in the special conditions of Contract and specifications. The Contractor shall
provide all necessary materials equipment and labour etc. for the execution and of the work till completion. All
materials that go with the work shall be approved by the Engineer-in-charge prior to procurement and use.
Owner at his discretion may endeavour to provide water to the Contractor at the owner's source of supply at one
point at the rate charged for such works.
The contractor shall make his own arrangement for the distribu- tion pipe net works from the source of supply
after getting prior permission for the same from the Engineer-in-charge. Supply of water shall not be free and the
necessary charges as fixed by the Local Body shall have to be paid by the contractor.
However, owner does not guarantee the supply of water and this does not relieve the contractor of his
responsibility in making his own arrangements and for the timely completion of the work as stipulated.
The Contractor shall have to make his own arrangement for power supply.
LAND FOR CONTRACTOR'S FIELD OFFICE, GODOWN & WORKSHOP:
Owner will not be a position to provide land required for Contractors shall have to make his own
arrangement for the same. No land will be provided by S.M..C. to the contractor for constructing his labour and
supervisory comp and other service facilities.
GC-04 RULLING LANGUAGE :
The language according to which the contractor shall be constructed and interpreted shall be English.
All entries in the contract documents and all correspon-dence between the contractor and the Municipal
Corporation or the Engineer shall be in English. All dimensions for the materials shall be given in metric units only.
GC-05 INTERPRETATION OF CONTRACT DOCUMENT :
1. The provisions of the General Conditions of Contract and special conditions of contract shall prevail over
those of any other documents of the contract unless specifically provided otherwise. Should there be any
discrepancy, inconsistency error or ommission in the several documents forming the contract, the matter may be
referred to the Engineer-in-charge for his instructions and decision. The Engineer-in-charge's decision in such case
shall the final and binding to the contractor.
2. Works shown upon the drawings but not described in the specifications of described in the specific
specifications without showing on the drawings shall be taken as described in the specifications and shown on the
3. The heading and the marginal notes to the clauses of those general conditions of contract or to the specifications
or to any other part of tender documents are solely for the purpose of giving a concise indication and not a
summary of contents thereof or be used in the interpretation or construction thereof of the contract.
4. Unless otherwise stated specifically, in this contract documents the singular shall include the plural and vice
versa wherever the context so requires. Works implementing persons shall include relevant corporated
companies/ registered associations / body of individual / firm of partnership.
5. Notwithstanding the sub-divisions of the documents into separate sections and volumes every part of each
shall be supplementary to and complementary of every other part and shall be read with and into the context so far
as it may be practicable to do so.
6. Where any portion of the General Conditions of contract is repugnant to or ar variance with any provisions of
the special conditions of contract, then, unless a different intension appears, the provisions of the special
conditions of contract shall be deemed to override the provisions of General conditions of Contract and shall to
the extent of such repugnancy or variance prevail.
7. The materials, Design and Workmanship shall satisfy the relevant I.S.S.and Codes referred to. If Additional
require- ments are shown in the specifications, the same shall be satisfied over and above I.S.S. and Codes.
8. If the specification mention that the contract shall perform certain work or provide certain facilities, it will mean
that the contractor shall do so at his own cost.
9. The correctness of the details given in the tender documents is not guaranteed. The contracotr shall independently
obtain all necessary information for making the tender. The contractor shall be deemed to have examined the
Contract Documents, to have generally obtained his own information in all matters that might affect the carrying
out of the work or the Tenderer rates. Any error in description of quantity or commission there from shall not
vitiate the contract or release the contractor from executing the work comprised in the contract according to the
Drawings and specifications at the tendered rates. He is deemed to have known the scope, nature and magnitude
of the work and the requirements of materials and labour involved and as to what all works he has to complete in
accordance with the contract what-soever be the defects, omissions, or errors that may be found in the contract
documents. The contractor shall be deemed to have visited the site and the surroundings,to have satisfied himself to
the nature of all existing structures, if any, and also as to the nature and the conditions of railways, roads, bridges
and culverts, means of transport and communications, whether by land, air or water and as to possible interceptions
thereto and the access and agrees from the site, to have made inquires, examined and satisfied himself as to the
sites for obtaining sand, stones, bricks and other materials, the sites for disposal of surplus materials, the
available accommodation as to whatever required, the depicts and such other buildings as may be necessary for
executing and completing the work, to have local independent inquiries as to the subsoil, subsoil water and variation
thereof, storms, prevailing winds, climatic conditions and all other similar matters effecting the work. He is deemed
to have acquinted himself as to his liability for payment of Government taxes, custom duty and other charges.
Any neglect or failure on the part of the contractor in obtaining necessary and reliable information upon the
forgoing or any other matters affecting the contract shall not relieve him from any risks or liabilities or the entire
responsibility from completion of the work at the tendered rates and time in strict accordance with the contract
No verbal agreement or inference from conversation with any officer or employee of the worner either before or
after the execution of the Contract Agreement shall in any way effect or modify any of the terms of obligations
herein contained.
GC-06 CONTRACTOR TO UNDERSTAND HIMSELF FULLY ;
The contractor by tendering shall be deemed to have satisfied himself, as to consideration and
cirucmstances affecting the tender price, as to the possibility of executing the works as shown and described in
the contract and to have fixed his prices accordingg to his own view on these matters and to have understand that
no additional allowances except as otherwise expressely provided, will after words be made beyond the
contract price. The contractor shall be responsible for any misunder-standing or incorrect information given in
writting by the Engineer.
GC-07 ERROR IN SUBMISSION ;
The contractor shall be responsible for any errors or ommissions in the particulars supplied by him.
Whether such particulars have been approved by the Engineer or not, provided that such discrepancies, errors or
ommissions be not due to inaccurate information or particular furnished in writing to the Contractor by the
Municipal Corporation or the Engineer.
GC-08 SUFFICIENCY OF TENDER :
The Contractor shall be deemed to have satisfied himself before tendering as to the correctness of the tender
rates which rates shall, except as or other wise provided for, cover all the Contractor's liabilities and obligation
set forther or implied in the contract for the proper execution of work for compliance with requirements of Article
GC-09 DISCREPANCIES :
The drawings and specifications are to be considered as mutually explanatory of each other, detailed
drawings being followed in preference to small scale drawings and figures dimension in preference to scale and
special conditions in preference to general conditions. Special direction or dimen- sions given in the specifications
shall supersede all else. Should any discrepanies however, appear or should any misunderstanding arise as to
the meaning and intent of the said specifications or drawings, or as to the dimensions or the quality of the
materials or the due and proper execution of the works, or as to the measurement or quality and valuation of the
works executed under this contract or as extra there upon the same shall be explained by the Engineer-in-charge
and his explanation shall subject to the final decision of the Additional City Engineer, in case reference be made
to him, be binding upon the contractor shall execute the work according to such explanation (subject to aforesaid)
and without addition to or deduction from the contract and shall also do all such works and things necessary for the
proper completion of the works as implied by the Drawings and specifications, even though such works and
things are not specially shown and described in said specifications. In cases where not particular specifications are
given for any article to be used under the contract, relevant specifications of the Indian Standard Institution shall
GC-10 PERFORMANCE GUARANTEE : (Security Deposit)
As a contract security the tenderer to whom the award is made shall furnish a performance guarantee (Security
Deposit) for amount equal to Two percent (2%) of the contract price to guarantee the faithful performance
completion and maintenance of the works of the contract in accordance with all the conditions and terms specified
herein and to the satisfaction of the Engineer and ensuring the discharge of all obligations arising from the
execution of contract, in one of the forms mentioned below.
(a) Initial Security Deposit of 2% (Shall be Released after completion of final bill as well as defect liability period & on
completion of audit related procedure)
(b) 5% Retention money deposit to be deducted from running bills (Shall be released with final bills)
Note: 2% Initial Security deposit shall be deposited in the form of Cash/DD/Pay
GC-11 INSPECTION OF WORK :
1. The Engineer in charge will have full power and authority to inspect the work at any time wherever in
progress either on the site or at the contractor's any other manufacturers workshops or factories wherever
situated and the contractor shall afford for Engineer-in-charge every facility and assistance to carry out such
inspection. Contractor or his authorised representative shall, at all time during the usual working hours and all other
times when so notified, remain present to receive orders and instructions, orders given to Contractor's
representative shall considered to have the same force as if they had been given to the contractor himself.
Contractor shall give not less than 7 days notice in writing to the Engineer-in- charge before covering up or
otherwise placing beyond reach of inspection and measuring any work in order that the same may be inspected
and measured. In the event of breach of the above, the same shall be recovered at Contractor's expenses for
carrying out such inspection or measurment.
2. No material shall be despatched from contract store on site of work before obtaining approval in
writing of the Engineer-in-charge, Contractor shall provide at all time during the progress of work and
maintenance period proper means of access with ladders, gangways, etc. and the necessary attendance to
move and adopt as d irected for inspection or measurement of work by E ngineer-in-charge.
GC-12 DEFECT LIABILITY :
1. Contractor shall guarantee the work for a period of 12 months from the date of issue of completion
certificate.Any damage or defect that may arise or that may remain undis- covered at the time of issue of
completion certificate connected in any way with the equipment or materials supplied by him or in the
workmanship be rectified or replaced by contractor at his own expenses as desired by Engineer-in-charge or in
default may cause the same to be made good by other agency and deduct expenses of which the certificate of
Engineer-in-charge shall be final from any sums that may then or any time thereafter become due to contractor of
sale thereof or of a sufficient portion thereof.
2. From the commencencement to completion of work contractor shall take full responsibility for the case
of the work including all temporary works and in case any damage, loss or injury shall happen to work or any part
thereof or to any temporary works from any cause whatsoever and shall at his own cost repair and make good the
same so that at completion work shall be in good order and in confirmity in every respect with the requirements
of contract and as per the instructions of the Engineer-in-charge.
3. If at any time before the work is taken over, the Engineer- in-charge shall -
(a) Decide that any work done or materials used by the contractor are defective or not in accordance
with contract or that work of any portion thereof is defective or do not fulfill the requirements of contract (all
such materials being hereinafter called defects in this clause and (b) as soon as reasonably practicable given to
contractor notice in writing of the said defect specifying particulars of the defects alleged to exist or to have
occured, then contractor shall at his own expenses and with all speed make good the defects so specified.
(b) In case contractor fails to do so, owner may take at the cost of the contractor, such steps as may in
all circumstances, be reasonable to make good such defects. The expenditure so incurred by S.M.C. will be recovered
from the amount due to contractor. The decision of Engineer-in-charge with regard to the amount to be
recovered from contractor will be final and binding on the contractor.
GC-13 POWER OF ENGINEER TO GIVE FURTHER INSTRUCTIONS :
The Engineer shall have the power and authority from time to time and at all times to give further instructions
and directions as may appear to him necessary or proper for the guidance of contractor and the works and
efficient execution of the works according to the terms of the specifications, and the contractor shall receive,
execute, obey and be bound by the same, according to the true intent and meaning thereof, as fully and effectually
as though the same had accompanied or had been mentioned or referred to in the specifications. No work which
readically changes the original nature of the contract shall be ordered by the Engineer and in the event of any
deviation being ordered,which in the opinion of the contractor changes the original nature of the contract, the shall
nevertheless carry it out and any disagreement as to the nature of the work & the rate to be paid thereof shall be
resolved.The time of completion of works, in the event of any deviations, resulting in additional cost over the
contract sum being ordered, then be extended or reduced reasonable by the Engineer. The Engineer's decision in
the case shall be final and binding.
GC-14 PROGRAMME :
The time allowed for execution of works shall be essence of the contract. The contract period shall commence from
date of Notice of intimation to proceed. The tenderer at the time of submitting his tender shall indicate the
construction or pipeline schedule, the month-wise programme required for the execution of the works and shall
confirm the same within fourteen (14) days of the acceptance of his Tender. The contractor shall provide to the
Engineer-in-charge a detailed programme of time schedule for execution of the works in accordance with the
specifications & the completion date. The entire programme to be finalised by the Contractor,has to confirm to the
execution period mentioned alongwith the Bill of Quantities in the Tender Documents.The Engineer upon scrutiny of
such submitted programme by contractor,shall examine suitability of it to the requirement of contract and suggest
modifications, if found necessary.
GC-15 SUBLETTING OF WORKS :
No part of the contract nor any share or interest thereon shall in any manner or degree be transferred,assigned or
sublet by the contractor directly or indirectly to any firm or Corporation whatsoever except as provided for in the
succeding subclause without the consent in writing of the owner.
GC-16 SUB-CONTRACTORS FOR TEMPORARY WORKS ETC. :
The owner may give written consent to sub-contractors for execution of any part of the work at the site being
entered upon by the contractors provided each individuals contractor is submitted to the Engineer-in-charge before
being entered into and in approved by him. List of Sub-Contractors is to be supplied. Not with standing any
subletting with such approval as aforesaid and not with standing the Engineer-in-charge shall have received copies
of any sub-contractors, the contractors shall be and shall remain solely responsible for the quality and proper
expenditions and execution of the works and the performance of all the conditions of contract in all respects as if
such submitting or sub-contracting had not taken place and as if such work had done directly by the Contractor.
GC-17 TIME FOR COMPLETION:
1. The work covered under this contract shall be commenced from the date of contract is served with a
notice to proceed with the work and shall be completed before the date as mentioned in the time schedule of
work. The time is the essence of the contract and unless the same is extended as mentioned in clause No. GC-18
(Extension of time) the contractor will be panalised for the delay.
2. The general time schedule for work is given in the tender document. Contractor shall prepare a detailed
weekly or monthly programme of work in consultation with Engineer-in-charge soon after the agreement and
the work shall be strictly executed accordingly. The time for as construction of road given includes,the time
required for testing, rectification if any, retesting and completion in all respects to the entire satisfaction of the
Engineer- in-charge.
GC-18 EXTENSION OF TIME :
Time shall be considered as the essence of the contract. If however, the failure of the Contractor to
complet e the work as per the stipulated dates referred to above arises from delays on the part of Municipal
Corporation in supplying the materials of equipment it has undertaken to supply under the contract or from
delays in handing over sites or from increase in the quantity of work to be done under the contract, or force
Majeure an appropriate extension of time will be given. The Contractor shall request such extension within one
month of the cause of such delay and in any case before expirry of the contract period.
GC-19 CONTRACT AGREEMENT :
The successful tenderer shall when called upon to do so, enter into and execute the Contract Agreement
within (15) fifteen days of the Notice of Award, in the form shown in tender documents with such modifications
as may be necessary in the opinion of the Municipal Commissioner. It should be incumbent on the contract to pay
the stamp duty and the legal charges for the completion of the contract agreement.
GC-20A. PENALTY FOR DELAY :
If the contractor fails to complete the work within the stipulated completion date for the work or he shall
pay liquidated damages at one tenth of Two percent of contract value per day of delay in completion and handing
over the work or part thereof as the case may to the Municipal Commissioner. The amount of liquidated damages
shall, however, be subjected to a maximum of ten (10) percent of the contract value. Delays in excess of one
hundred days will be a cause for termination of the contract and forfeiture of all security for performance.
The successful tenderer shall have to submit the progress bar-chart within fifteen days after the contract, and
the contractor should work as per the approved bar-chart, failing the contractor shall have to pay the compensation
for delay as per the decision of Municipal Commissioner.
GC-21 FOR FEITURE OF SECURITY DEPOSIT :
Whenever any claim arises against the contractor for the payment of a sum of money out of or under the contract,
the owner shall be entitled to recover such sum by appropriating in part of whole, the security deposit of the
contractor. In case the Security deposit is insufficient the balance recoverable shall be deducted from any sum
then due or which at any time thereafter may become due to the contractor shall pay to the owner on demand
may balance remaining due.
GC-22 ACTION OF FORFEITURE OF SECURITY DEPOSIT :
In any case in which under any clause or clauses of the contract, the contractor shall have forfeited the whole of
his Security deposit or have committed a breach of any of the terms contained in this contract, the owner shall
have power to adopt any of the following courses as he may deem best suited to his interest -
(a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the owner
shall be conclusive evidence) in which case, the security deposit of the contractor shall stand forfeited and be
absolutely at the disposal of the owner.
(b) To employ labour and to supply materials to carry out the balance work debiting contractor with the cost of
labour employed and the cost of materials supplied for which a certificate of the Engineer-in-charge shall be final
and conclusive against the contractor and 10% costs on above to cover all departmental charges and crediting him
with the value of work done at the same rates as if it has been carried out by the contractor under the terms
of his contract. The certificate of Engineer-in-charge as to the value of the work done shall be final and
conclusive against the contractor.
(c) To measure up the work of the contractor and to take such part hereof as shall be unexecuted out of his hand
to give it to another contractor to complete. In this case the excess -expenditure incurred than what whole
have been paid to the original contractor, if the would work had been executed by him, shall be earnest and
paid by the original contractor and shall be deducted from any money due to him by the owner under the
contract or otherwise and for the excess expenditure, the certificate of the Engineer- in-charge shall be final and
In the event any of the above course being adopted by the owner, the contractor shall have no claim to
compensation for any less sustained by him by reason of his having purchased or procured any materials or
entered into any agree-ment so or made by advance on account of or with a view to the execution of the work of
the performance of the contract. In such case the contractor shall not be entitled to recover or be paid by sum for
any work actually performed under this contract unless the Engineer-in-charge will certify in writing the
performance of such work and the value payable in respect thereof and the shall only be entitled to be paid the
value so certified. In the event of the owner putting in force the powers as stated in a, b, c, above vested in him
under the preceeding clause, he may, if he so desire, take possession of all or any tools and plant, materials and
stores in or upon the work or the site thereof belonging to the contractor, or procured by him and intended to
be used for the execution of the work or any part thereof paying or allowing for the same in account at the
contract rates to be certified by the Engineer-in-charge whose certificate thereof shall be final otherwise the
Engineer-in-charge may give notice in writing to the contractor or his representative requiring him to remove such
tools plant materials or stores from the premises within the time specified in the notice and in if the contractor
fails to comply with any such notice, the Engineer-in-charge may remove them at the Contractor's expenses or sell
them by auction or private sale on account of the contractor and his risks in all respects without any furhter notice
as to the date, time to place of the sale and the certificate of Engineer-in-charge as to the expenses of any such
removal and the amount of the proceeds and the expenses of any such sale shall be final and conclusive against
the contractor.
GC-23 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK :
If at any time from the commencement of work, the owner shall for any reasons whatsoever not require the whole
or part thereof a specified in the tender to be carried out, the Engineer-in- charge shall give notice in writing of the
contractor, who shall have no claim to any payment or compensation whatsoever on account of any profit or
advantage which he might have derived from execution of work in full, but which he did not derive in consequence
of the full amount of the work not having been carried neither shall be have any claim for compensation by
reason if any alternations having been made in original specifications, drawings, designs and instructions which
shall involve any curtailment of the work as originally contemplated.
When the contractor is a partnership firm, the prior approval in writing of the S.M.C.shall be obatined before any
change is made in the constitution of the firm, where the contractor is an individual or a Hindu Undivided Family
business concern, such approval as aforesaid shall, likewise be obtained before sub- contractor enters into any
agreement with other parties whereunder the reconstituted firm would have the right to carry out the work
hereby undertaken by the contractor. In either case if prior approval as aforesaid is not obtained, the contract shall
be deemed to have been allotted in contravention of sub- letting clause hereof and the same action may be taken
and the same consequence shall ensure as provided in the sub-letting clause.
GC-24 IN EVENT OF DEATH OF CONTRACTOR :
Without prejudice to any of the right or remdies under the contract, if the contractor dies, the owner shall have
the option of terminating the contract without compensation to the contractor.
GC-25 MEMBER OF THE OWNER NOT INDIVIDUALLY LIABLE :
No official or employee of the owner shall in any way be personally bound or liable for the acts or obligations
of the owner under the contract or answerable for any default or ommission in the observance or performance
of the acts, matters or things which are herein contained.
GC-26 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS :
The contractor shall not be entitled to any incresse on the Schedule of rates or any other rights or claims
whatsoever by reason of representation, explanation or statement or alleged representation, promise or
guarantees given or alleged to have been given to him by any person.
GC-27 CONTRACTOR'S OFFICE AT SITE :
The Contractor shall provide and maintain an office at the site for the accommodation of his agent and staff and
such office shall be opened at all reasonable hours to receive instruc- tions, notice or other communications.
GC-28 CONTRACTOR'S SUBORDINATE STAFF AND THEIR CONDUCT :
1. The contractor on award of the work shall name and depute a qualified Engineer, having experience of carrying
out work of similar nature, to whom equipments, materials, if, any, shall be issued and instructions for work given.
The contractor shall also provide to the satisfaction of Engineer in-charge sufficient and qualified staff to
superintend the execution of the work, competent sub- agents, foremen and leading hands including those
specially qualified by previous expeditions to a supervise the type of works comprised in the contract in such manner
as will ensure work of the best quality and expeditions working, it, in the opinion of the Engineer-in-charge,
additional properly qualified supervision staff is considered necessary, if shall be employed by the contractor
without additional charge on account thereof. The contractor shall ensure to the satisfaction of the Engineer- in-
charge that sub - contractors, it any shall provide competent and efficient supervision over the work entrusted to
2. If and whenever any of the contractor 's or sub-contractor agents, sub-agents, assistance, formen or other
employees shall, in the opinion of Engineer-in-charge, be guilty of any misconduct or be incompetent or
insufficiently qualified or inteligent in the performance of their duties or that in opinion of the owner or Engineer-in-
charge, it is undesirable for administrative or any other reason for person or persons to be employed in the works,
the contractor, if so directed by the Engineer-in-charge, shall at once remove person or persons from employment
thereon. Any person or persons so removed shall not again be remployed in connection with the works without the
written permission of the Engineer-in- charge. Any person so removed from the works shall be immediately
replaced at the expenses of the contractor by acqualified and competent substitute. Should the contractor be
required to repatriate any person removed from the works he shall do so and shall bear all costs in connection
3. The contractor shall be responsible for the proper behaviour of all the staff, foremen, workmen and others shall
exercise proper control over them and in particular and without prejudice to the same. Generally, the contractor
shall be bound to prohi-bit,and prevent any employee from trespassing or acting in any way detrimental or
prejudicial to the interest of the community or of the properties or occupiers of land and properties in the neigh-
bourhood and in the event of such employees so trespassing, the contractor shall be responsible therefore and
relieve the owner of all consequent claims, actions for damages or injury or any other grounds whatsoever. The
decision of the Engineer-in- charge upon any matter arising under this clause shall be final.
4. If and required by the owner, the contractor's personnel entering upon the owner's premises shall be
properly identified by badges of a type acceptable to the S.M.C. which must be worn at all times on owner's
GC-29 TERMINATION OF SUB-CONTRACTOR BY OWNER :
If any sub-contractor engaged upon the works at the site executes any work which in the opinion of Engineer-in-
charge is not in accordance with the contract documents, the S.M.C. may be give written notice to the contractor
request his to terminate such sub-contract and the contractor upon the receipt of such notice shall terminate such
sub-contract and the letter shall forthwith leave the works failing which the owner shall have the right to remove
such sub-contractors from the site.
No action taken by the owner under the above clause shall relieve the contractor of his liabilities under the
contract or give rise to any right to compensa-tion, extension of time or otherwise.
GC-30 POWER OF ENTRY :
If the contractor shall not commence the work in the manner previously described in the contract documents or if
he shall, at any time, in the opinion of Engineer-in-charge.
(i) Fail to carry out works in conformity with the documents or
(ii) Fail to carry out the works in accordance with the time schedule.
(iii) Substantially suspend work or the works for a period of fourteen days without authority from Engineer-in-
(iv) Fail to carry out and execute the work to the satisfaction of the Engineer-in-charge or
(v) Fail to supply sufficient or suitable construc-tion plant temporary works, labour materials or things or
(vi) Commit breach of any other provisions of the contract on his part to be performed or observed or persist in any
of the above mentioned breached of the contract for fourteen days after notice in writing shall have been given to
the contractor by the Engineer-in-charge requiring such breach to be remedied or
(vii) Abandon the work or
(viii) During the continuance of the contract becomes bankrupt, make any arrangement or compromise with his
creditors, or permit any execution to be levied or go into liquidation whether compulsory or voluntary not being
merly a voluntary liquidation for the purpose of amalgamation or reconstruction then in any such case.
The owner shall have the power to enter upon the works and take possession thereof and of the materials,
temporary works, constructional plant and stock therein, and to r evoke the contractor's licence to use the same
and to complete the works by his agents, other contractor or workman or to relate the same upon any terms and to
such other person, firm or corporation as the owner in his absolute discretion may think proper to employ, and for
the purpose aforesaid to use or authorise the use of any materials, temporary works, constructional plant, and stock
as aforesaid, without making payment or allowance to the Contractor for the said materials other than such as may
be certified in written by the Engineer-in-charge to be reasonable and without making any payment or allowance to
the contractor for the use of said temporary works, constructional plant and stock or being liable for any less or
damage thereto. If the owner shall be reason of his taking possession of the works or of the work being got
completed by other contractor incur excess certified by the Engineer-in-charge shall be deducted from any money
which may be due for the work done by the contractor under the contract and not paid for. Any deficiency shall
fortwith be made good and paid to the owner by the contractor and the owner shall have power to sell in such
manner and for such price as he may think fit all or any of the constructional plant, materials etc. constructed by or
belonging to and recoup and retain the said deficiency or any part thereof out of the proceeds of the sale.
GC-31 CONTRACTOR'S RESPONSIBLITY WITH THE OTHER CONTRACTOR & AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor executing the work of
civil construction to work in close co-operation and co-ordinate the work with other contractors or their authorised
represaentative and the contractor will put a joint scheme with the concurrence of other contractors showing the
arrange-ments for carrying his portion of the work to the Engineer-in-charge and get the approval. The Engineer-
in-charge before approving the joint scheme will call the parties concerned and modify the scheme if required.
No claim will be entertained on account of the above. The contractor shall conform in all respects with the
provisions of any statutory regulations, ordinances or by laws of any local or locally consitituted authorities or public
bodies which may be applicable from time to time to works or any temporary works. The contractor shall keep
the owner indemnified against all penalties and liabilities of every kind arising out of non-adherence to such
statutes, ordinanace, laws, rules, regulations, etc.
GC-32 OTHER AGENCIES AT SITE :
The Contractor shall have to execute the work in such place and condition where other agencies will also be
engaged for other works, such as site grading, filling and levelling, electrical and mechanical engineering works,
etc. No claim shall be entertained for works being executed in the above circumstances.
GC-33 NOTICES :
Any notice under this contract may be served on the contractor or his duly authorised representative at the job site
or may be served by registered post direct to the official address of the contractor proof of issue of any such notice
could be conclusive of the contractor having been duly informed of all contents therein.
GC-34 RIGHT OF VARIOUS INTERESTS :
The owner reserves the right to distribute the work between more than one contractor. Contractor shall co-operate
and afford reasonable opportunity to other contractors for access to the works for the carriage and storage of
materials and execution of their works.
Wherever the work being done by any department of the owner or by other contractor employed by the owner is
contingent upon work covered by this contract, the respective rights of the various interests shall be determined
by Engineer-in-charge to secure the completion of various portions of the work in general harmoney.
GC-35 PRICE ADJUSTMENT :
No adjustment in price shall be allowed as the time limit for completion of the project is less than One year.
GC-36 TERMS OF PAYMENT :
The payment of Bills shall be made progressively according to the rules and practice followed by the Municipal
Corporation. The progressive payment unless otherwise provided in the Contract Agreement or sub-sequently
agreed to by the parties, shall be made generally monthly on submission of a bill by the Contractor in prescribed
form in an amount according to the value of the work performed less the aggregate of previous progressive
payments and as required by clause GC-37 (Retention money) herein. All such progressive payment shall be regarded
as payment by way of advance against final payment.
Payment for the work done by the contractor will be based on the measurement at various stages of the work, in
accordance with the conditions at Clause GC-77 (Measurement of Work in Progress)
GC-37 RETENTION MONEY :
Pursuant to Clause GC-36 Terms of Payment) on all money due to the contractor for work done, Municipal
Corporation will hold as retention money of Five percent (5%) of the value of work. The retention money will not
normally be due for payment until the completion of the entire work and till such period the work has been finally
accepted by the Municipal Corporation and completion certificate issued by the Municipal Corporation in pursuant
to Clause No.GC-83 (Completion Certificate).
However, after the assurance of completion certificate, and Municipal Commissioner may at its own discreation
and having considered the Contractor's performance and diligence during the contract time allow the retention
money to converted into a Bond as stipulated in the Clause GC-10 (Performance Bond Security Deposit).
GC-38 PAYMENT DUE FROM THE CONTRACTOR :
All costs, damages or expenses, for which under the Contract the Contractor is liable to the Municipal Corporation
deducted by the Municipal Corporation from any money due or becoming due to the Contractor under the contract
or from any other contract with the Municipal Corporation or may be recovered by action at law or other-wise
from the Contractor.
GC-39 CONTINGENT FEE :
1. The Contractor warrants that he has not employed any person to solicit or secure the contract upon any
agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty shall give the
Municipal Commissioner the right to cancel the contract or to take any other measure as the Municipal
Commissioner may deem fit. The warranty does not apply to commissions payable by the contractor to establish
commercial or selling agent for the purpose of securing business.
2. No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or to any
benefit that may rise therefrom.
GC-40 BREACH OF CONTRACT BY CONTRACTOR :
If the contractor fails to perform the work under the contract with due diligence or shall refuse or neglect to
comply with instruction given to him in by the Engineer-in-charge accordance with the contract, or shall contravence
the provisions of the contract,the S.M.C. may give notice in writing to the contractor to make good such failure,
neglect or contravention. Should the Contractor fail to comply with such written notice within twenty eight (28) days
or receipt, if the Municipal Commissioner shall think fit, it shall be lawful for the Municipal Corporation, without
prejudice to any other rights, the contractor may have under the contract, to terminate the contract for all or part of
the works, and to make any other arrangements it shall deem necessary to complete the work outstanding under
the contract at the time of termination. In this event Article GC-15 (Subletting of work)and GC-16 (Sub-Contracts for
Temporary Works etc.)hereof shall be invoked and the performance Bond shall immediately become due and
payable to the Municipal Commissioner the value of the work done on the date of termination and not paid for
shall stand forfeited to the Municipal Corporation and the Municipal Corporation shall have free use of any works
which the contractor may have at the site at the time of termination of the contract.
GC-41 DEFAULT OF CONTRACTOR :
1. The Municipal Corporation may upon written notice of default to the contractor terminate the contract in
circumstance detailed hereunder :
(a) If in the judgement of the Municipal Corporation the contractor fails to make completion of works within the
time specified in the completion schedule or within the period for which extension has been granted by the
Municipal Corporation /Engineer to the Contractor.
(b) If in the judgement of the Municipal Corporation the contractor fails to comply with any of the provisions of this
2. In the event the Municipal Commissioner terminates the contract inwhole or in part as provided in Article
GC-48 (Termination of Contract), the Municipal Corporation reserves the right to perchase upon such terms and in
such manner as it may deem appropriate, plant similar to that terminated and the contractor will be liable to the
Municipal Corporation for any additional costs for such similar and / or for liquidated damaged for delay until
such resonable time as may be required for the final completion of works.
3. If this contract is terminated as provided in this paragraph GC - 30 (Power of entry) (1) the Municipal
Corporation in addition to any other rights provided in this clause, may require the Contractor to transfer title
and deliver to the Municipal Corporation under any of the following cases in the manual and as directed by the
Municipal Corporation. (a) Any partially completed information and contract rights as the contractor has specifically
produced or acquired for the performance of the contract so termi-nated.
4. In the event the Municipal Corporation does not terminate the contract as provided in the paragraph GC-
(Termination of Contract) the Contractor shall continue performance of the contract, in which case the shall be
liable to the Municipal Corporation for liquidated damages for delay until the works are accepted.
GC-42 BANKRUPTCY :
If the Contractor shall become bank rupt or insolvent or have a receiving order made against him, or compound
with the creditors, or being the Municipal Corporation commence to be wound up, not being a member's
Voluntary winding up for the purpose of amalgamation or reconstruction, or carry on its business under a
receiver for the benefit of his creditors or any of them, the owner shall be at liberty to either (a) terminate the
contract forthwith by giving notice in writing to the contractor or to the receiver or liquidator or to any person or
organisation in whom the contract may become vested and to act in the manner provided in Article GC-41
(Default of Contractor) as though the last mentioned notice had been the notice referred to in such Article of (b) to
give such receiver liquidator or other person in work the contract may become vested the option of carrying out
the contract subject to his providing a satisfactory guarantee for the due and faithfully performance of the
contract subject to his providing a satisfactory guarantee for the due and faithfull performance of the contract
upto an amount to be agreed. In the event that the Municipal Corporation terminates the Contract in accordance
with this article, the performance Bond shall immediately become due and payable on demand to Municipal
GC-43 OWNERSHIP :
Works supplied pursuant to the Contract shall become the property of the Municipal Corporation from
whichever is the earlier of the following times, namely,
(a) When the works are completed pursuant to the Contract.
(b) When the Contractor has been paid any sum to which he may become entitled in respect thereof pursuant to
clause GC-36 (Terms of Payment).
GC-44 DECLARATION AGAINST WAIVER :
The condonation by the Municipal Corporation of any breach of brenches by the stipulations and conditions
contained in the contract shall in no way prejudice or effect to the constructed as a waiver of the Municipal
Corporation rights, powers and remidies under the contract in respect of any breach or breaches.
GC-45 LAWS GOVERNING THE CONTRACT :
The contract shall be co nstitued according to and Subject to the laws of India and the State of Gujarat and
under the jurisdiction of the courts of Gujarat at Surat.
GC-46 OVERPAYMENT AND UNDERPAYMENT :
Whenever any claim forths payment of a sum to the Municipal Corporation arises out of or under this Contract
against the contractor the same may be deducted by the Municipal Corporation from any sum then due or which at
any time thereafter may become due to the contractor under this contract and failing that under any other contract
with the Municipal Corporation or from any sum due to the contractor with the Municipal Corporation (which may
be available with Municipal Corporation), or from his retention money, or he shall pay the claim on demand.
The Municipal Corporation reserves the right to carry out post payment audit and technical examination of the
final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected no
withstanding the fact that the amount of the final bill may be included by the Contractor.
It as a result of such audit and technical examination any over payment is discovered in respect of any work done
by the Contractor or alleged to have been done by him under the contract, it shall be recovered by the
Municipal Corporation from the contractor by way of all the means prescribed above or if any under payment is
discovered by the Municipal Corporation, any amount due to the contractor under this contract or under payment
may be adjusted against any amount then due or which may at any time thereafter become due before payment is
made to the contractor from him to the Municipal Corporation on any other contract account whatsoever.
GC-47 SETTLEMENT OF DISPUTES :
Except or otherwise specifically provided in the contract, all disputes concerning questions of fact arising under
the contract shall be decided by the Commissioner, subject to a written appear by the Contractor to the
Commissioner, and these decisions shall be final and binding to the contractor.
GC-48 TERMINATION OF THE CONTRACT:
1. If the Contractor finds it impracticable to continue operation owing to Force Majeure reasons or for any reason
beyond his and/or the Municipal Commissioner find site impossible to continue operation when prompt
notification in writing shall be given by the party affected to the other.
2. If the delay or difficulties so caused can not be expected to cease or become unavoidable or if operations can
not be resumed within six(6) months the party shall have the right to terminate the contract upon Ten (10) days
written notice to the other. In the event of such termination of the contract, payment to the Contractor will be
made as follows :
a) The Contractor shall be paid for all works approved by the Engineer and for any other legitimate expenses due to
b) If the Municipal Commissioner terminates the contract owing to Force Majeure or due to any cause beyond its
control, the contractor shall additionally be paid for any work done during the said Six (6) months period including
any financial commitment made for the proper performance of the Contract and which are not reasonable defrayed
by payment under (a) above;
c) The Municipal Commissioner also release all bonds and guarantees at its disposal except is cause where the
total amount of payments made to the contractor exceeds the final amount due to him in which case the contractor
total amount of payments made to the contractor exceeds the final amount due to him in which case the contractor
shall refund the excess amount within Sixty (60) days after termination and the Municipal Commissioner thereafter
shall release all bonds and guarantees, should the contractor fail to refund the amount received in excess within the
said period such amounts shall be deducted from the bonds or guarantees provided.
3. On the termination of the contract for any cause the contractor shall see the orderly suspension and
termination of operations, with due consideration to the interests of the Municipal Corporation with respect to
completion, safeguarding or storing of materials procured for the performance of the contract and the salvage and
resale thereof.
GC-49 CHANGES IN CONSTITUTION :
Where the contractor is a partnership firm, the prior approval in writing of the Municipal Commissioner shall be
obtained any change is made in the constitution of the firm. Where the contractor is an individual or an
undivided family business concern such approval as aforesaid shall like wise be obtained before the contractor
enters into any partnership agreement whereunder the partnership firm would have the right to carry out the
works hereby undertaken by the contractor. If prior approval as aforesaid is not obtained the contract shall be
deemed to have been assigned in contravention of Article thereof.
GC-50 SUB-CONTRACTUAL RELATIONS :
All work performed for the contract by sub-contractor shall be pursuant to an appropriate agreement between the
contractor and sub-contractor which shall contain provisions to :
a) Protect and preserve the rights of the Municipal Corporation and the Engineer with respect to the work
to be performed under the sub-contract so that the sub-contractor thereof will not prejudice such rights.
b) Require that such work be performed in accordance with requirements of the Contract documents.
c) Require under such contract of which the contractor is a party, the submission to the contractor of
application for payment and claims for additional costs, extension of time, damages for delay or otherwise with
respect to the sub- contracted portions of the work in sufficient time, that the contractor may apply for payment
and comply in accordance with the contract Documents for like claim by the Contractor upon the Municipal
d) Waive all rights the contracting parties may have against one another for damages caused by fire or other
perils covered by the property insurance except such rights as they may have to the proceeds so such insurance
held by the Municipal Corporation as trustee and,
e) Obligate each sub-contractor specifically to consent to the provisions of this Article.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable and which is
chargeable to the contractor, the owner shall have the right to retain out of any payment then due or thereafter
to become due an amount sufficient to completely indemnify the owner against such lien or claim or if such lien
or claim be valid the owner may be or become due and payable to the contractor. If any lien or claims remaining,
unsettled after all payments are made, the contractor shall refund or pay to the owner all money that the latter may
be compelled to pay in discharging such lien or claim including all cost and reasonable expenses.
GC-52 EXECUTION OF WORK :
The whole work shall be carried out in strict conformity with the provisions of the Contract Documents, detailed
drawings, specifications and the instructions of the Engineer-in-charge from time to time. The Contractor shall
ensure that the whole work is executed in the most substantial, proper and best workmanship using materials of
best quality in strict accordance with the specifications to the entire satisfaction of the Engineer-in- charge.
GC-53 WORK IN MONSOON :
When the work continues in monsoon, the contractor shall maintain minimum labour force required, for the work
and plan and execute the construction and erection work according to the prescribed schedule. No extra rate will
be considered for such work in monsoon. During monsoon and entire constructing period the contractor shall
keep the site free from water at his own cost.
GC-54 WORK CLOSED ON SUNDAYS & HOLIDAYS & BETWEEN SUNSET AND SUNRISE:
No work shall be carriedout on Sundays and Corporation Holidays and no work shall be carried out between
sunset and sunrise. Except with the special permission of Engineer-in-charge in writing perviously obtained and
with holding such permissions shall be no ground of complaint on the part of contractor or cause for
compensation to them. Working period shall be maximum eight (8) hours per days.
GC-55 EXTRA SUPERVISION CHARGES TO BE BORNE BY CONTRACTOR :
Further to clause No.GC-54 when Engineer-in-charge feels necessary to give permission to contractor for carrying
out work for period of more than Eight hours working period in a day and/or to continue work on sunday and
Corporation holidays. Extra Supervision charges arising due to overtime working of Corporation's staff shall be borne
by the contractor at prevailing rates from time to time. Such extra supervision charges shall be deducted by
Corporation from the running bill/s of the contractor at Surat Municipal Corporation's description.
GC-56 DRAWING TO BE SUPPLIED BY THE OWNER :
The drawings attached with the tender documents shall be for general guidance of the contractor to enable him to
visualize the type of work contemplated and scope of work involved. Detailed working drawings according to which
the work is to be done shall be furnished from time to time as the work progresses. The contractor shall study the
drawings thoroughly in connection with other connected details and discrepancy if any bring to the notice of the
Engineer-in-charge before actually carrying out the work.
GC-57 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR :
Where drawings, date are to be furnished by the contractor they shall be as enumerated in special condition of
contract and shall be furnished within the specified time. Where approval of drawings has been specified it shall
be the Contractor's responsibility to have these drawings got approved before any work is taken up with regard to
the same. Any changes becoming necessary in these drawings during the execution of the work shall have to be
carried out by the contractor at no extra cost. All final drawings shall bear the certification stamp as indicated below
duly signed by both the contractor and Engineer- in-charge.
"Certified true for ___________________________________project Agreement
Engineer-in-charge Drawings will be approved within three (3) weeks of the receipt of the same by the Engineer-in-
GC-58 SETTING OUT WORK :
The contractor shall set out the work on the site handed by the Engineer-in-charge and shall be responsible for the
correctness of the same. The work shall be carried out to the entire satisfaction of Engineer-in-charge. The approval
thereof or partaking by Engineer-in-charge in setting out work shall not relieve contractor of any of his
responsibilities.
The contractor shall provide at his own cost all necessary level posts, pegs, bamboos, flage, ranging, rods, strings
and other materials and labourers required for proper setting out of the work. The Contractor shall provide, fix
and be responsible for the maintenance of all stakes, temples level marks profiles and similar other things and shall
take and necessary precautions to prevent their removal or disturbance and shall be responsible for the conse-
quence for such removal or disturbance. The contractor shall also be responsible for the maintenance of all existing
Survey Marks, Boundary Marks, Distance Marks and Centre line marks either existing or fixed by the Contractor.
The Centre, longitudinal or face lines and cross lines shall be marked by small masonary pillars. Each pillar shall
have distance mark at the centre for setting up the theodolite. The work shall not be started unless the setting out
is checked by Engineer-in-charge in writing but such approval shall not relive the contractor of his responsibilities.
The contractor shall provide all materials, labour and other facilities necessary for checking at his own cost.
Pillars bearing geodetic marks on site shall be protected by the Contractor. On completion of the work the contractor
shall submit the Geodetic documents according to which the work has been carried out.
GC-59 RESPONSIBILITIES OF CONTRACTOR FOR CORRECTTNESS OF WORK:
The contractor shall be entirely and exclusively responsible for the correctness of every part of the work and shall
rectify completely and errors thereon at his own cost when so instructed by Engineer-in-charge.
1. Materials to be supplied by Contractor :
Contractor shall procure and provide all the materials required for the execution and maintenance of work
including M.S. rods, all tools, tackle, construction plant and equipment except the materials to be supplied by the
owner detailed in the contract documents and for the transport thereof, owner, shall made recommendations to
the respective authorities if designed by the contractor but assumes no responsibility or any nature. Owner shall
insist for procurement of materials with ISI Marks supplied by reputed firms on the DGS & D List. 2. If however the
Engineer-in-charge feels that work is likely to be delayed due to contractor's inability to procure the materials, the
Engineer-in-charge shall have the right to procure materials from the market and the contractor will accept these
materials at the rates decided by Engineer-in-charge
GC-60 MATERIALS TO BE SUPPLIED BY THE OWNER :
1. If the contract provides certain materials or stores to be supplied by the S.M.C. such materials and stores
shall be transported by the contractor at his cost from S.M.C's stores or Railway Station. The sum due from
contractor for the value of materials supplied by the owner will be recovered from the R.A.Bill on the basis of
actual consumption of materials in the work covered and for which R.A.Bill has been prepared. After completion of
the work contract has to account for the full quantity of materials supplied to him.
2. The value of store materials supplied by the S.M.C. to the contract shall be charged at rates shown in the
contract document and in case any other material not listed in the schedule of materials is supplied by the S.M.C.,
the same shall be charged at cost price including carting and other expenses inclurred in procuring the smae. All
materials so supplied shall remain the property of the owner and shall not be removed from the site on any
account.Any material remaining un-used at the time of completion of work or termination of contract shall be
returned to S.M.C.'s store or any other place as directed by the Engineer-in-charge in perfectly good condition at
contractor's cost. When materials are supplied free of cost for us in work and surplus and unaccounted balances
thereof are not returned to the Municipal Corporation, recovery in respect of such balance will be effected at
double the applicable issue rate of the materials or the market rate whichever is higher.
GC-61 CONDITIONS OF ISSUE OF MATERIALS BY THE S.M.C.:
a) The materials specified to be issued by the S.M.C. to the contractor shall be issued by the S.M.C.'s store
or at Railway Station and all expenses for its shifting to site shall be borne by the contractor. The materials will be
issued during working hours and as per rules of S.M.C. from time to time.
b) Contractor shall bear all expenses for storage and safe custody at site of materials issued to him before
c) Material shall be issued by the S.M.C.in Standard/non-standard sizes as obatined from manufacturer.
d) Contractor shall construct suitable godowns at site for storing the materials to proect the same from
damage due to rain, dampness, fires, theft etc.
e) The contractor should take the delivery of the materials issued by the S.M.C. after satisfying himself that they
are in good conditions. Once the materials are issued, it will be the responsibility of the Contractor to keep them in
good condition and in safe custody. If the materials get damaged or if they are stolen, it shall be the responsibility
of the contractor to replace them at his according to the instruc- tions of the Engineer-in-charge.
f) For delay in supply or for non supply of materials to be supplied by the S.M.C., on account of natural calamities,
act of enemies, other difficulties beyond the control of the S.M.C., the S.M.C. carries non-responsibilities. In no
case the contractor shall be entitled to claim any compensation for loss suffered by him on this account.
g) None of the materials issued to the contractor, shall be used by the Contractor for manufacturing items which
can be obtained from manufacturer. The materials issued by the owner shall be used for the work only and no other
h) Contractor shall be required to execute indemnity bond in the prescribed form for the same custody and account
of materials issued by the owner.
i) Contractor shall furnish sufficiently in advance a Statement of his requirements of quantities of materials to be
supplied by the S.M.C. and the time when the same will be required for the work, so as to enable Engineer-in-charge
to make arrange-ments to procure and supply the materials.
j) A daily account of materials issued by the owner shall be maintained by the Contractor showing receipt,
consumption and balance in head in the form laid down by Engineer-in-charge with all connected paper and shall
be always available for inspection in the site office. k) Contractor shall see that only the required quantities of
materials are got issued and no more. The contractor shall be responsible to return the surplus materials in
good condition at S.M.C.'s store at his own cost.
GC-62 MATERIALS PROCURED WITH ASSISTANCE OF THE OWNER :
Notwithstanding anything contained to the contrary in any of the clauses of this contract, where any materials for
the execution of the contract are procured with the assistance of the S.M.C. either by issue from S.M.C. stock or
purchase made under orders or permits or licences issued by the Government, the contractor shall hold the same
materials as trustees for owner and use such materials economically and solely for the purpose of contract and not
dispose them off without the permission of S.M.C.and return, iif required by Engineer-in-charge, all surplus or
unserviceable materials that may be left with him after the completion of the contract or at its termination for any
reason whatsoever on his being paid or credited such prices as Engineer-in-charge shall determine having due
regard to the conditions of the materials. The price allowed to contractor shall not exceed the amount charged to
him excluding the storage charges if any. The decision of Engineer-in-charge shall be final and conclusive in such
matters. In the event of breach of the aforesaid condition, the contractor shall in terms of licence of permits and/or
for criminal breach of trust be liable to compensateS.M.C. at double rate or any higher rates.In the event of these
materials at that time having higher rate or not being available in the market then any other rate to be determined
by the Engineer-in-charge and his decision shall be final and conclusive.
GC-63 MATERIALS OBTAINED FROM DISMANTLING :
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons other than on
account of bad or imperfect work, the materials obtained from dismantling will be the property of the S.M.C. and
will be disposed of as per instruction of Engineer-in-charge in the best interest of the S.M.C.
GC-64 ARTICLE OF VALUE OR TREASURE FOUND DURING CONSTRUCTION:
All gold, silver and other minerals of any discription and all previous stones, coins, treasures, relics, antiquities and
other similar things which shall be found in under or upon site shall be the property of the owner and the
contractor shall property preserve the same to the satisfaction of Engineer-in-charge and shall hand over the same
GC-65 DISCREPANCIES BETWEEN INSTRUCTIONS :
If there is any discrepancy between the various stipulations of the contract documents of instructions to the
contractor or his authorised representative or if any doubt arises as in the meaning of such stipulation or
instructions, the contractor shall immediately refer in writing to the Engineer-in-charge whose decision shall be
final and conclusive and no claim for losses caused by such discrepancy,shall in any event be admissible.
Incase there is any descripancy in measurements shownin drawinge and specifications, the same shown in drawing
shall be considered as final and will be binding upon the contractor.
GC-66 SCHEDULE OF QUANTITIES AND EXTRA ITEMS :
A. Schedule of Quantities :
Variations in the quantities of work in schedule of quantities shall not vitiate the contract. The rates quoted for the
individual items shall apply for the quantities of work increased or decreased by not more than twenty percent
for each of the items, should the quantities of work actually involved under any item very by more than twenty
(20%)percent, the rate for such item of work shall be revised in accordance with the procedures indicated under
clause "Extra Items". The payment for the items will, however, continue to be at the original rate till the revised rate
B. Extra Items :
Extra Items of work shall not vitiate the contract. The contractor shall be bound to execute extra items of work
as directed by the Engineer-in-charge. The rates for extra items shall be derived from the S.O.R.(R&B Division) Year
2024-2025 and quoted premium of tender. If the rate of extra item is not available in S.O.R. it will be derived on
prevailing market rate.
GC-67 ACTION WHEN NO SPECIFICATION IS ISSUED :
In case of any class of work for which no specification is supplied by the S.M.C. in the tender documents,such
work shall be carried out in accordance with I.S.S. do not cover the same, the work should be carried out as per
standard Engineering practice subject to the approval of Engineer-in- charge.
GC-68 ABNORMAL RATES :
Contractor is expected to quote rate for each item after careful analysis of cost involved for the performance of the
completed item considering all specifications and conditions of contract. This will avoid loss of profit or gain in case
of curtailment or change or specification for any item. In case it is notice that the rates quoted by a tenderer for any
item is usually high or unusually low, it will be sufficient cause for rejection of tender unless the S.M.C. is
convinced about the reasonableness of the rates on scrutiny of the analysis for such rate to the furnish-ing by the
tenderer or demand.
GC-69 ASSISTANCE TO ENGINEER-IN-CHARGE :
Contractor shall make available to Engineer-in-charge free of cost all necessary instruments and assistance in
checking of any work made by the contractor for taking measurement of work.
GC-70 TEST OF QUALITY OF WORK :
1. All workmanship shall be of the best kind described in the contract document and in accordance with the
instructions of Engineer-in-charge and shall be subjected from time to time to such test at contractor's cost as the
Engineer-in-charge may directed at the place of manufacture of fabrication or on site or at any such place.Contractor
shall provide assistance, instruments labour and materials as are normally required for examining measuring and
testing any work workmanship as may be selected and required by Engineer-in-charge.
2. All tests will be necessary in connection with the execution of work as decided by Engineer-in-charge shall be
carried out at an approved laboratory at contractor's cost.
3. The contractor shall furnish to Engineer - in - charge for approval when requested or if required by the
specification adequate samples of all materials and finished goods to be used in work and sufficiently in advance
to permit test and examination thereof. All materials furnished and finished goods applied in work shall be
exactly as per the approved samples.
4. All the testing charges shall be borne by the Contractor.
GC-71 ACTION AND COMPENSATION IN CASE OF BAD WORKMANSHIP :
If it shall appear to the Engineer-in-charge that any work has been executed with materials of inferior description,
or quality or are unsound or with unsound imperfect or unskilled workmanship or otherwise not in accordance with
the contractor shall, no demand in writing from Engineer-in-charge or his authorised representative specifying
the work, materials or articles compained of, notwithstanding that the same may have been inadvertantly
passed, certified and paid for forthwith rectify or remove and reconstruct the work, specified and in the event of
failure to do so within a period to be specified by Engineer- in-charge in his aforesaid demand, contractor shall be
liable to pay compensation at the rate of one (1) percent of the tendered cost of work for every Ten (10) days
limited to a maximum of Ten (10%) Percent of the value of work while his failure to do so continue and in the case
of any such failure the Engineer-in- charge may on expiry of the notice period rectify and remove and re-execut the
work or remove and replace with other at the risk and cost of the Contractor. The decision of the Engineer-in-
charge as to any question arising under this clause shall be final and conclusive.
GC-72 SUSPENSION OF WORK :
Contractor shall, if ordered in writing by Engineer-in-charge or his representative temporarily suspended the work
or any part thereof for such time (not exceeding two months) as ordered and shall not after receiving such written
order proceed with the work until he shall have received a written order to proceed therewith the contractor shall
not be entitled to claim compensa- tion for any loss or damage sustained by him by reason of temporary
suspension of work as aforesaid. An extention of time for completion of work will be granted to the contractor
corresponding to the delay caused by such suspension of work if the applied for the same provided the suspension
was not conse- quent upon any default or failure on the part of the contractor.
GC-73 OWNER MAY DO PART OF THE WORK :
When the contractor fails to comply with any instructions given in accordance with the provisions of this
contract,the S.M.C. has the right to carry out such parts of work as the S.M.C. may designate whether by
purchasing materials and engaging labour or by the agency of another contractor. In such case the S.M.C.shall deduct
from the amount which otherwise might become due to contractor the cost of such work and materials with Ten
(10%) percent added to cover all departmental charges and should the total amount thereof exceed the amount
(10%) percent added to cover all departmental charges and should the total amount thereof exceed the amount
due to contractor, contractor shall pay the difference to S.M.C.
GC-74 POSSESSION PRIOR TO COMPLETION :
The Engineer-in-charge shall have the right to take possession of or to use any completed or partly completed
work or part of work, such possession or use shall not be deemed to be an acceptance of any work completed
in accordance with the contractor. If such prior possession or use by Engineer-in- charge delays the progress of
work, equitable adjustment in the time of completion will be made and the contract shall be deemed to be modified
GC-75 COMPLETION CERTIFICATE :
As soon as the work has been completed in accordance with contract (except in minor respect that do not effect
their use for the purpose for which they are intended and except for maintenance thereof) as per general
conditions of contract and has passed the tests on completion, the Engineer-in-charge shall issue a certificate
(hereinafter called completion certificate) in which he shall certify the date on which work has been completed
and has passed the said tests and S.M.C. shall be deemed to have taken over work on the date so certified. If work
has been divided in various groups in contract, S.M.C. shall be entitled to take over any group or groups before the
other or others and there-upon the Engineer-in-charge will issue a completion certificate which will, however,
be for such group or groups so taken over only. In order that contractor could obtain a completion certificate, he
shall made good, with all speed any defect arising from the defective materials supplied by contractor or
workmanship or any act or ommission of contract that may have been discovered or developed after the work or
group of works has been taken over. The period allowed for carrying out such work will be normally, one month.
If any defect be not remedied within a reasonable time, S.M.C. may proceed to do work at contractor's risk and
expenses and deduct from the final bill such amount as may be decided by S.M.C. If by reason of any default on
the part of the contractor, a completion certificate has not been issued in respect of every portion of work within
one month after the date fixed by contractor for completion of work, S.M.C. shall be at liberty to use work or any
portion thereof in respect of which a completion-certificate has been issued, provided that work or the portion
thereof so used as aforesaid shall be afforded reasonable opportunity for completion of this workfor the issue of
completion certificate.
GC-76 SCHEDULE OF RATES :
1. The price/rates quoted by the contractor shall be remain firm till the issue of finalcertificate and shall be subject
to price ADJUSTMENT CLAUSE GC-35. Schedule of rates shall be deemed to include and cover all costs expenses
and liabilities of every description and all risks of every kind to be taken in executing, completing and handling
overwork to owner by contractor. Contractor shall be deemed to have known the nature, scope, magnitude and
the extent of work and materials required through contract documents may not fully and precisely furnish them.
He shall make such provision in the schedule of rates as he may consider necessary to cover the cost of such items
of work and materials as may bereasonable and necessary to completion work. The opinion of Engineer-in-charge as
to the item of work shall be final and binding on Contractor although the same may be not shown on or described
specifically in contract documents.
2. The Schedule of rates shall be deemed to include and cover the cost of all constructional plant, temporary work,
pumps, materials, labour and all other materials in connection with each item in schedule of rates and the execution
of work or any portion thereof furnished complete in every respect and maintained as shown or described in the
contract document or as may be ordered in writing during the continuance of the contract.
3. The Schedule of rates shall be deemed to include and cover the cost of all royalties and free for the articles and
processes, protected by letters patent or otherwise incorporated in or used in connection with work, also all
royalities, and other payments in connection with materials of whatsoever kind for work and shall include an
indemnity to-owner which contractor hereby gives against all action, proceeding, claims, damages, costs and
expenses arising from the incorporation in use of work of any such articles, processes or materials. Octroi of other
Municipal or Local Board charges if levied on materials equipment of machineries to be brought to site for use on
work shall be borne by the contractor.
4. No exemption or reduction of custom duties excise duties, sales-tax or any other taxes or charges of the Central
or State Government any local body whatsoever will be granted to obtained. All of such expenses shall be deemed
to have been included in and covered by schedule of rates. Contractor will also obtained and pay for all permits or
other privileges necessary to complete work.
5. The schedule of rates shall be deemed to include and cover risk on account of delay or intereference with
contractor's conduct of work which may occure from any cause including orders of S.M.C. in the exercise of his
power and no account of extension of time granted due to various reasons.
6. For work under unit rate basis no alteration will be allowed in the schedule of rates by reason of work or any part
of them being field, altered extended, diminished or ommitted.
GC-77 PROCEDURE FOR MEASUREMENT OF WORK IN PROGRESS :
1. All measurements shall be in metric system. All the work in progress will be jointly measured by the
representative of Engineer-in-charge and contractor's authorised agent. Such measurements will be got recorded in
the measurement book by the Engineer or his authorised representative and signed by contractor or his
authorised agent in token of acceptance. If the contract or his authorised agent fails to be present when even
required by the Engineer-in-charge for taking measurements for any reasons whatsoever, the measurement will be
taken by the Engineer - in - charge or his authorised representative not withstanding the absence of contract and
these measurement will be deemed to be correct and binding on contractor.
2. Contractor will submit a bill in approved proforma in duplicate to the Engineer - in - charge of the work giving
abstract and detailed measurements of various items executed during a month as mutually agreed. The Engineer-
in-charge shall verify the bill and the claim, far as admissible, adjusted if possible, within 10 days of presentation
3. In case of Tenders for completed items of work, contractor may be allowed 'Secured Advance' on the Security of
materials brought to site for execution of the constructed items of work the extent of 75% of the value of materials
of unperishable nature and an agreement bedrawn up with contractor under which the owner secured a lien on
these materials and is safe guarded against losses due to any reasons whatsoever. Recoveries of advance paid
would not be post-poned till the whole work is completed but shall be adjusted from his work done or the
materials used, the necessary deductions being made when the items of work in which they are used and are billed
for. When the mode of measurement is not covered by contract for any item of work it shall be as per latest I.S.I.
GC-78 RUNNING ACCOUNT PAYMENT TO BE RECOVERDED AS ADVANCES :
1. All running account payments shall be regarded as payments by way of advance against the final payment only
and not as payment for work actually done and completed and shall not preclude the requiring of bad, unsound
and imperfect or unskilled work to be removed and taken away and reconstructed or to be considered as an
admission of the due performance of contract or any part thereof.
GC-79 NOTICE FOR CLAIM FOR ADDITIONAL PAYMENT :
If the contractor considers that he is entitled to extra payment or compensation or any claim whatsoever in respect
of work, he shall forthwith give notice in writing to the Engineer-in-charge about his extra payment and/or
compensation. Such notice shall be given to the Engineer-in-charge within Ten (10) days from the happening of any
event upon which contractor basis such claims and such notice shall contain full particular of the nature of such
claim with full details and amount claimed. Failure on the part of the contractor to put forward any claim with
the necessary particulars as above within the time above specifed shall be an absolute waiver thereof. No
commission by S.M.C. to reject any such claim and no delay in dealing therewith shall be waiver by S.M.C. of any
rights in respect thereof.
GC-80 PAYMENT OF CONTRACTOR'S BILL :
1. The price to be paid by the S.M.C. to contractor for the work to be done and for the performance of all the
obligations under taken by the contractor under contract shall be based on the contract price and payment to be
made accordingly for the work actually executed and approved by the Engineer-in-charge.
2. No payment shall be made for work costing less than Rs.5,000/-till the work is completed and a certificate of
completion given. But in case of work estimated to cost more than Rs.5,000/- contractor on submitting the bill
thereof will be entitled to receive a monthly payment, proportionate to the part thereof, approved and passed by
Engineer-in-charge whose certificate of such approval and passing of the sum so payable shall be final and
conclusive against contractor. This payment will be made after making necessary deductions as stipulated
elsewhere in the contract documents for materials, security deposit, etc. The payment shall be released to
the contractor within Thirty ( 30 ) days of submission of the bill in case of running bill and with in two (02) months
in case of final bill, contractor shall present the bill duly pre-receipted on proper revenue stamp.
Payment due to Contractor shall be made by the by crossed Accounts payee cheque in Indian currency forwarding the
same to the registered office of the contractor. Owner shall not be responsible if the cheque is mislaid or
misappropriated by unauthorised person.
GC-81 FINAL BILL :
The final bill shall be submitted by Contractor within two (02) month of the date of physical completion of work,
Otherwise the Engineer-in-charge certificate of the measurement and of total amount payable for work shall be
Otherwise the Engineer-in-charge certificate of the measurement and of total amount payable for work shall be
finalised binding on all parties.
GC-82 RECEIPT FOR PAYMENT :
Receipt for payment made on account of work when executed by a firm must be signed by a person holding power
of attorney in this respect on behalf of contractor except when described in the tender as a limited company in
which case the receipt must be signed in the name of the company by one of its principal officers or by some
other person having authority to give effectual receipt for the Company.
GC-83 COMPLETION CERTIFICATE :
1. When the contractor fulfil his obligation as per terms of contract he shall be eligible to apply for completion
certificate. Contractor may apply for separate completion certificate in respecf of each such portion of work by
submitting the completion documents alongwith such application for completion certificate.
The Engineer-in-charge shall normally issue to contractor the completion certificate within 2 (Two) month after
receiving an application thereof from contractor after verifying from the complete documents and satisfying
himself that work has been completed in accordance with and as set out in the construction and erection drawings
and the contract document. Contractor after obatining the completion certifi-cate is eligible to present the final bill
for work executed by him under the terms of contract.
2. Within 2 (Two) month of completion of work in all respect contractor shall be furnished with a certificate by
the Engineer-in-charge of such completion but no certificate shall be given nor shall work be deemed to have been
executed, until all (1) scaffolding, surplus materials and rubbish is clearing off site completely (2) until work shall
have been measured by the Engineer-in-charge whose measurement shall be binding and conclusive and (3) until all
the temporary works, labour and staff colonies etc. constructed are removed and the work site cleaned to the
satisfaction of the Engineer-in-charge. If contractors shall fail to comply with the requirements as aforesaid or
before date fixed for the completion of work,the Engineer-in-charge may at the expenses of contractor remove such
scaffolding, surplus materials and rubbish and dispose of the same he thinks fit.
3. The following documents will form the completion documents :
(a) Technical documents according to which work was carried out.
(b) Construction drawings showing therein the modifications and corrections made during the course of execution
signed by Engineer-in-charge.
(c) Completion certificate for "Embedded" or "Covered" up work.
(d) Certificate of final levels as set out for various works.
(e) Material appropriation statement for the materials issued by owner for work and list of surplus materials
returned to S.M.C.'s store duly supported by necessary documents.
4. Upon expiry of the period of defects liability and subject to Engineer-in-charge being satisfied that work has
been duly maintained by contractor during the defects liability period as fixed originally, or as external
subsequently and the contractor has in all respects made up by subsidence and performed all his obligations under
contract, the Engineer- in-charge shall (without prejudice to the rights of owner in any way) give final certificate
to that effect. The Contractor shall not be considered to have fulfilled the whole of his obligation until final
certificate shall have been given by the Engineer-in-charge notwithstanding previous entry upon and taking
possession, working or using of the same or any part thereof by owner.
5. Final Certificate only Evidence of Completion :
Except the final certificate no other certificate or payments against a certificate or an general account shall be taken
to be an admission by owner of the due performance of contract or any part thereof or of occupancy validity of any
claim by the contractor.
GC-84 TAXES, DUTIES, OCTROI, ETC. :
GST (Goods & Service Tax) has come in existence from 1st July, 2017 Contractor/Successful Bidder is bound to pay
any amount of GST prescribed by the Govt of India as per the Term of Contract agreed upon during the course of
execution of this Contract.
From last date of submission of tender and During the course of execution of contract if there is any change in Rate of
GST (Goods & Service tax) by the Government the same i.e. only the difference shall be reimbursed / recovered
separately by SMC subject to the submission of original Receipt /Proof for the amount actually remitted by the
Successful Tenderer / Contractor / successful bidder certifying that the amount of GST paid to the Government and the
same shall be intimated / submitted / claimed within 30 (Thirty) days from the date of payment Remittance of GST
within stipulated period shall be the sole responsibility of the successful Bidder / contractor, failing which, SMC may
recover the amount due from any other payable dues with SMC and decision of Municipal commissioner shall be final
and binding on the contractor / successful Bidder in this regard further, the non-payment of GST to the Government
may lead to the termination of contract and forfeiture of Security deposit/ Performance Guarantee Amount.
Except GST, If imposition of any other new Taxes / Duties / Levies / Cess or any other incidentals etc. or any increase
in he existing Taxes /Duties / Levies / Cess or any other Incidentals etc.(Excluding GST) are imposed during the course
of the contract, the same shall be borne by the contractor / successful bidder only, in no case SMC shall be liable for the
same and obliged to reimbursed and no dispute regarding same shall be entertained by SMC. Bidder / firm should have
to produce attested copy of sale tax certificate with proof of residence.
Note:- The Rates mentioned in BOQ (Schedule-B) are excluding GST. GST will be reimbursed
separately (if applicable as per the opinion of Account department of SMC / GST Consultant of
SMC) as per the prevailing GST Rates decided by the Government. The contractor is invariably
bound to any changes in GST Rates made during the course of the work. The payment (if
applicable) for GST will be released only after the applicable Amount reflects on Government
portal. Decision of Account Department of SMC regarding applicable GST Rates will be final.
The Construction labour welfare cess shall be deducted from R.A. bill of the contractor at the prevailing rate. The
current rate of labor cess is 1% of the capital amount.
GC-85 INSURANCE :
Contractor shall at his own expenses carry and maintain with reputable Insurance Companies to the satisfaction
of owner as follows :
1. Employees State Insurance Act :
Contractor agrees to and does hereby accept full and exclusive liability for compliance with all obliga-tions imposed
by the Employees' State Insurance Act 1948, and Contractor further agree to defend, indemnify and hold owner
harmless from any liability or penalty which may be imposed by the Central or State Government of Local authority
by reasons of any asserted violation by contractor or Sub-Contractor of the Employees' State Insurance Act,
and also from all claims, suits or proceedings that may be brought against owner arising tender, growing out of or by
reasons of the work provided for by this contract whether brought by employees of Contractor, by third parties or
by Central or State Government authority or any administrative Sub-division thereof. Contractor agrees to fill in
with the Employees State Insurance Corporation, the declaration from and all forms which may be required in
respect Contractor's or Sub-contractor's employees these aggregate remuneration is Rs. 400/-p.m.or less and who
are employed in work provided for or those covered by E.S.I from time to time under the agreement. The
Contractor shall deduct and secure the agreement of the Sub-contractor to deduct the employees' contribution
as per the first Schedule of the Employees' State Insurance Act from wages. Contractor shall remit and secure the
agreement of Sub-contractor to remit to the State Bank of India Employees' State Insurance Corporation Accounts,
the employees contribution as required by the Act Contractor agrees to maintain all cares and record as required
under the Act in respect of employees and payments and contractor shall secure the agreements of the sub-
contractors to maintain such records, any expenses incurred for the contributions or maintaining records shall be
to contractor's or sub- contractor' account. Owner shall retain such sum as may be necessary from the contract
value until contractor shall furnish satisfactory proof that all contribution as required by the Employees' State
Insurance Act 1948 have been paid.
2. Workman's Compensation And Employees Liability Insurance :
Insurance shall be effected for all contractors employees engaged in the performance of this contact. If any part
of work is sublet, contractor shall require the sub-contractor to provide workmans' compensation and employer's
liability insurance which may be required by owner.
3. Other Insurance required under law or regulation by owner :
Contractor shall also carry and maintain any and all other insurance which may be required under any law or
regulation from time to time. He shall also carry and maintain any other insurance which may be required by
GC-86 DAMAGE TO PROPERTY :
1. Contractor shall be responsible for making good to the satisfaction of owner any loss of and any damage to
all structures and properties belonging to owner or being executed or Procured by owner or of other Agencies within
the premises of all work of owner, if such loss or damage is due to fault and / or the negligence or will full act or
ommission of contractor, his employees, agent representatives or Sub- contractors.
2. Contractors shall indemnify and keep owner harmless of all claims for damage to properties other than
S.M.C's property arising under or by reasons of this agreement if such claims result from the fault and / or
negliance or wilful act of ommission of contractor,his employees, agents, representatives or sub-contractors.
GC-87 OUR LAWS AND REGULATIONS :
1. The contractor shall be reponsible for the strict compliance of and shall ensure strict compliance by his
sub contractor employees and agents of all labours and others laws, rules or regulations having the force of law
affecting the relationship of employer and employee between the contractor/ sub-contractor and their respective
2. No labour below the age of eighteen (18) year be employed on work.
3. Contractor shall pay to the labours engaged on work according the law.
4. The Contractor and sub-contractors o f the contractor shall obtain proper authority disignated in this
behalf under any application law, rules or regulations (including but not restricted to the factories Act and
Contract Labour Abolition and Regulation Act 1970, ) in so far as applicable) any and all such licences, consents,
Registration and / or other authorisation as shall from time to time be or become necessary for relatint to the
execution of work or any part of portion thereof or the storage or supply of any materials or otherwise in
connection with the performance of the contract and shall at all times observance by the sub- contractors,
employees and agents of all terms and conditions of the said licences,consents, regulation and other authorisa- tion
and laws, rules and regulations applicable thereto.
GC-88 CONTRACTOR TO INDEMNIFY OWNER :
1. The Contractor shall indemnify and keep indemnified the owner and every member, officer and employee
of owner from and against all action, claims, demands and liabilities whatsoever and in respect of the breach of
any of the above clauses and/or against any claim, action or demand by any workman/ employee of the contractor
or any sub-contractor and or from any liability and way to any workman / employee of the contractor or any
sub-contractor under any law, rule or regulations having the force of law, including but not limited to claims
against the owner under the workman compensation Act 1923. The employees' Provident Funds Act 1952 and/or
the Contract Labour (Abolition and Regulations) Act,
2. Payment of claims and damages :
If owner has to pay any money in respect of such claims or demands as aforesaid, the amount so paid and
the cost incurred by the owner shall be charged to and paid by contractor without any dispute notwithstanding
the same may have been paid without the consent or authority of the Contractor.
3. In every case in which by virtue of any provision applicable in the workman's Compensation Act 1923 or
any other Act, be obliged to pay compensation to workman employed by Contractor the amount of compensation
so paid, and without prejudice to the rights of S.M.C. under sec.(12) Sub-section (2) of the said Act, S.M.C. shall be
at liberty to recover such amount from any surplus due to the contractor or the security deposit. S.M.C. will not
be bound to contest any claim made under section (12) Sub-section (2) of the said Act except or written request
of Contractor and upon the contesting of such claim.
4. The Contractor shall protect adjourning sites against structural decorative and other damages that could
be caused to adjourning premises by the execution of these works and made good at his cost, any such damage, so
GC-89 IMPLEMENTATION OF APPRENTICE ACT 1964 :
Contractor shall comply with the provisions of the Apprentice Act 1964 and the orders issued thereunder from
time to time. If the fails to do so, it will be a breach of contract. Contractor shall also be liable for any particular
liability arising on account of any violation of the provisions of the Act by him.
GC-90 HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS :
Contractor shall comply with all the rules and regulations of the local sanitary authorities or as framed by owner
from time to time for the protection of health and sanitary arrangements of all labour directly or indirectly
employed on the work of this contract.
GC-91 SAFETY CODE :
Contractor shall adhere to safe construction practice and gurard against hazardous and unsafe working conditions
and shall comply with owner's safety rules and set fourth herein.
1. First Aid and Industrial Injuries :
1.1 Contractor shall maintain first aid facilities for its employees and chose of his sub-contractor.
1.2 Contractor shall make outside arrangements for ambulance service and for the treatment of industrial
injuries. Name of those providing these services shall be furnished to Engineer-in-charge prior to start of
construction, and their telephone numbers shall be prominently posted in contractor's field office.
1.3 All injuries shall be reported promptly to Engineer- in-charge, and a copy of Contractor's report
covering each personal injury requiring the attention of a physician shall be furnished to owner.
2. General Rules :
2.1 Carrying, striking, matches, lighters inside the project area & smoking within the job site is strictly
probibited Violators of smoking rules shall be discharged immediately. Within the operation area, not hot work
shall be permitted without valid gas safety, fire permits. The Contractor shall also be held liable and responsible for
all lapses of his sub-contractors/ employees in this regards.
3. Scaffolding :
3.1 Suitable scaffolding shall be provided for workmen for all works that can not safely be done from the
ground or from solid construction except such short period work as can be done safely from ladders. When a ladder
is used, an extra mazdoor shall be engaged for holding the ladder and if the latter is used for carrying materials as
well, suitable foothold sand handholds shall be provided on the ladder and the same shall be given inclination
not steeper than 1 to 4 (1 horizontal and 4 vertical).
3.2 Scaffolding or stagging more than 3.6 M (12') above the ground or floor, swing or suspended from an
overhead support or erected with stationary support shall have a guard rail properly attached, bolted, braced and
otherwise fixed at least 1.0 M (3') high above the floor or platform of scaffolding or staging and extending along the
entire length of the outside ends thereof with only such openings as may be necessary for the delivery of materials.
Such scaffolfing or staging shall be so fastened as to prevent it from swaying from the building or structure.
4. Maintenance of Safety Devices :
4.1 All scaffolds,ladders and other safety devices mentioned or described herein shall be maintained in some
conditions and no scaffold, ladder or equipment shall be altered or removed while it is in use. Adequate washing
facilities should be provided at or near place or work.
5. Display or Safety Instructions :
5.1 These safety provisions should be brought to the notice of all concerned by display on a notice board at a
prominent place at the work-spot. The person responsible for compliance of the safety code shall be named therein
by the Contractor.
6. Enforcement of Safety Regulations :
6.1 To ensure effective enforcement of the rules and regula-tions relating safety precautions, the arrangements
made by the contractor shall be open to inspection by the welfare Officer, Engineer-in-charge of safety Engineer of
the owner or their representatives.
7. No Exemption :
7.1 Notwithstanding the above clause 1.0 to 13.0 there is nothing to exempt the contractor from the
operations of any other Act or rules in force in the Republic of India.
7.2 In addition to the above, the Contractor shall abide by the safety code provision as per C.P.W.D. Safety
Code framed from time to time.
GC-92 ACCIDENTS :
It shall be the contractor's responsibility to protect against accidents on the work. He shall indemnify the Municipal
Corporation against any claim for damage or for injury to persons or property resulting from, and in the course of
work and also under the provision of the Workman's Compensation Act. On the occurance of an accident arising
out of the works which results in death or which is so serious as to be likely to result in death, the contractor shall
within twenty four hours of such accident, report in writing to the Engineer-in-charge, the facts stating clearly and
is sufficient details the circumstances of such accident and the subsequent action. All other accidents on the works
involving injuries to persons or damage to property other than that of the contractors shall be promptly reported
to the Engineer-in-charge stating clarly and in sufficient details and facts and circumstances of the accidents
and the action taken. In all cases the contractor shall indemnify the Municipal Corporation against all loss of
damage resulting directly or indirectly from the Contractor's failure to report in the manner aforesaid. This
includes panalties or fine consequency of failure to give notice under the workman's compensation Act or
failure to confirm to the provisions of the said.Act in regard to such accidents.
In the event of an accident in respect of which compensation may become payable under the workmens
compensation Act VIII of 1923 including all modification thereof whether such compensation may become payable
by the contractor or by the Municipal Corporation as principal employer, the Engineer-in-charge may retain out
of money due and payable to the contractor such sum or sums of money as may, in the opinion of the Engineer-in-
charge be sufficient to meet such liability. On receipt of award from the labour commission in regard to quantum
of compensation, the difference in amount will be adjusted.
GC-93 It is clarified that if the contractor makes his own arrangements for water required for construction and
labour camp etc. by drilling bore. No water charges will be recovered from the contractor. On the otherhand,
even if the contractor is not taking connection and makes other arrangement to use Municipal water by tanker or
tapping water from near private connection even so water charges shall be recovered as per relevant condition
The Contractor/Agency shall prepare and submit accurate GIS-ready spatial and non-spatial (attribute) data of the
infrastructure work as per the SMC GIS Project Data Model for integration into the City GIS Project. The Contractor
may use DGPS/GNSS survey, Total Station/ETS survey, mobile GPS survey, preparation of AutoCAD/As-Built Drawings,
Google Earth KML/KMZ method - for GIS data preparation. (select appropriate method) GIS data shall be integrated
into the City GIS Poject in two stages : (1) after issuance of the Work Order and before release of the First RA Bill, by
submitting the Proposed Drawing of the work; and (2) after completion of the work and before release of the Final
Bill, by submitting the As-Built Drawing pepared as per the actual executed site conditions. All costs towards accurate
survey and data preparation shall be borne by the Contractor, and payments shall be released only after verification
and successful integration of the submitted data into the City GIS Project.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation.
SIGNATURE OF THE CONTRACTOR.
7.0 SCHEDULE – A
ADDITIONAL INSTRUCTION FOR CEMENT AND STEEL :
Surat Municipal Corporation shall not issued cement and reinforcement steel to be used for this work.
The cement and reinforcement steel required for the above said work shall be procured by contractor at its own
The brands for cement shall be Ultratech, Sanghi, Hathi, Sidhdhi, JK Laxmi company confirming to IS-12269:1987
with latest amendment ISO-9000 of 53 grade only.
Approved make of TMT reinforcement steel :- TATA, SAIL, Rastriya Ispat, Electrotherm(ET), National, Shree
Parmeshwar as per confirming to IS 1786/85 latest amendment TMT Fe-415/Fe-500. TMT Steel shall be
purchased by only manufacturing company/Authorised dealer/ Distributor/ Stockist only shall be allowed to use
mm plain steel shall be as per IS 2062/99 with latest emendment of any brand/make.
Any of the above mentioned brands of Cement and Reinforcement steel shall only be used by the contractor at the
time of execution.
The brands for structural steel to be used shall be of make TATA, Jindal, SAIL or Asian.
All structural steel shall conform to I.S. 226-1975. The steel shall be free from the defects mentioned in I.S. 226-
1975 and shall have a smooth finish. The material shall be free from loose mill scale, rust pits or other defects
affecting the strength and durability. Rivet bars shall conform to I.S. 1148-1992.
When the structural steel is supplied by the contractor test certificates of the manufacturers shall be
obtained according to I.S. 226-1975 and other relevant Indiand Standards.
Coloured galvanized Roofing sheet shall be of TATA or Jindal make trafford sheet
WASTAGE OF CEMENT AND REINFORCEMENT STEEL :As the contractor is to bring the cement and steel, the question
of considering the wastage on the basic of issue rate does not arise i.e. no saparate payment shall be made for any
kind of wastage in the materials. The payment for reinforcement bar will be made on theoritical weight basis.
The weight shall be computed on the basis of the length of the steel used in the work multiplied by the standard
unit weight of MS/HYSD/TMT bar as mentioned in IS code No.1786.
The steel consumption eighter less than 7.5% of the standard consumption shall be penalised either at the double
existing corporation issue rate or the prevailing market rate, whichever is more.
Similarly, for cement also, the less consumption beyond 5% shall be penalised at the double existing corporation
issue rate or the prevailing market rate, whichever is more.
TESTING OF CEMENT AND STEEL :
It should be specifically noted that the cement and steel brought by the contractor at site of work shall be used only
after the same is tested at the approved laboratory as per the direction of the Engineer- in-charge. Such approved
laboratory may be located at Surat, Baroda, Ahmedabad or Mumbai.
All the charge for the transport and testing of the samples shall have to be borne by the contractor. The frequency of
testing such material shall be in accordance to the relevant Indian Standards as directed by Engineer-in-charge.
1) For steel used only approved above said brand and testing of steel as per IS-CODE -1786 -2008 with latest
amendments and edition only.
2) Contracter also submit test certificate for steel for particular dispatch lot from manufacturer/company/supplier
conforming as per IS -1786-2008.
All the charge for the transport and testing of the samples shall have to be borne by the contractor. The frequency of
testing such material shall be in accordance to the relevant Indian Standards as directed by Engineer-in-charge.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation
Signature of the Contractor:
1. General Description of work : Colour Work for Road Divider, Footpath, Kerb
Stone, Gaurd Stone, Chainlink, Grill/B.R.T.S. Railing
on various Roads in South East Zone (Limbayat).
2. Estimated Cost : Rs.63,71,140.00 Ps. (Excluding GST)
3. Earnest Money Deposity : Rs.
4. Additional Security Deposit : Rs. 2% of Tender Amount.
(i) Cash (not less than the amount of earnest
(ii) To be deducted for RA bills : Rs. 5.00% of Total Work Done
Total Deposit : Rs. 7% of Tender Amount.
5. Time allowed for the completion of work from : 12(Twelve) Months (Excluding Monsoon)
date fixed in written order to commence
6. Compensation for delayed work under Clause 2 : Zero Point two percent (0.2%) of the contract price
per day maximum up to ten percent (10%) of the
contract price.
7. The progress of work should confirm to the
following schedule
10% of the work in : 25% of the time.
40% of the work in 50% of the time.
70% of the work in 75% of the time.
100 % of the work in 100% of the time.
8. Defect Liability Period : 12 (Twelve) Months From the Complition of work.
9. Water Charges : CONDITION FOR THE WATER SUPPLY & ELECTRIC
SUPPLY on next page.
10. Construction Cess will be deducted from : 1% of Work Done Amount in R.A. Bils.
respective R.A. Bill and Final bill in accordance
with the prevailing norms of Govt. of Gujarat.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation
Signature of the Contractor:
SURAT MUNICIPAL CORPORATION
SOUTH EAST ZONE(LIMBAYAT)
9.0 CONDITION FOR THE WATER SUPPLY & ELECTRIC SUPPLY
FOR WATER CHARGE (As per City Engineer Note No.386, dtd.30/7/2012)
In case of Municipal Network or distribution center availe or not at near by area
Contractor has to make his own arrangement for construction work whether from private boring or
tankers. Contractor has to submit test report of water weather it is of good quality for construction work or not
and contractor has to inform about it within 30 days of starting the work.
If contractor wants to use Municipal Water he has to follow procedure within below:
1. Contractor has to apply for water connection by Municipal Licenced plumber in prescribed form.
2. Contractor has follow all procedure with his own expenses.
3. According to rule Municipal Corporation issue bill to contractor for consumption of water and contractor
has to paid it within stipulated time and contractor has submit one copy of bill and payment receipt to concern
department. If contractor fail to pay the bill the amount of bill/paid receipt can be recover from contractor's bill.
4. If Municipal Corporation network is not available then Contractor can make arrangement of water tanker
from nearby distribution center after depositing required amount.
5. After completion of work contractor has to cancelled the water connection and inform the concern
6. If network and distribution center/network are both not available in that case contractor has to make his
own arrangement for good quality construction water and has to follow the option-1.
(2) The contractor shall make his own arrangement at his cost for electric supply required for operating
various plants and machineries required for the works and for general lighting purpose for site, office labour colony
The energy bills shall also be paid by the contractor.
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation,
SIGNATURE OF THE CONTRACTOR.
10.0 IMPORTANT INSTRUCTION-A TO THE CONTRACTOR
(1) This tender document containing all pages duly signed by the tenderer, should be furnished to Corporation
treasury along with the amount of earnest money deposit as mentioned in tender notice. If any of the
drawings or papers removed from the tender, the tender shall be rejected and E.M.D. shall be forefeited.
(2) The tenderer who wants to propose something in written, he should write it on his letter pad or another
paper. Anything written on tender papers shall not be considered by Corporation and Contractor shall
not be intend to do so.
(3) Following Certificate shall be enclosed with tender.
(a) Solvency Certificate amounting of 20% of tender amount.
(b) Registration Certificate of required class given by Governement or Semi-Government firm.
(c) Income-Tax clearance certificate.
(d) List of work done by Contractor with its volume.
4. All metal grouting work more than Rs.5/- lacs tender amount are carried out under the Supervision of TPI
(Third Party Inspection).
Executive Engineer,
South East Zone(Limbayat)
Surat Municipal Corporation,
SIGNATURE OF THE CONTRACTOR.
IMPORTANT INSTRUCTION TO TENDERER
Affix Latest Passpost Size Photo of
Specimen Signature of the Bidder.
[2] AFFIX LATEST PASSPORT SIZE PHOTOGRAPH OF ALL PARTNERS IN CASE OF PARTNERSHIP AGENCY.
Specimen Signature of all partners incase of partnership agency.
1. -------------------------- Submission of Registered Agreement
2. -------------------------- is compulsory in case of partnership
[3] Submission of sale tax certificate, with proof of residence is compulsory for tenderer.
[4] In case of Government royalty applicable to tenderer, it is compulsory to submit a receipt of royalty payment
[5] The Photograph and specimen signature of bidder will be cross checked, whenever he receives payment in
account section of SMC.
[6] The specimen signature of contractor will be cross checked by Account Department of SMC, in case of
representative of Contractor alongwith letter of authority of a person who signed an agreement, receives
EXECUTIVE ENGINEER,
SOUTH EAST ZONE (LIMBAYAT)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
11.0 SPECIFICATIONS OF MATERIALS
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from objectionable
quantities of silt and traces of oil and injurious alkalies, salts, organic matter and other deleterious
material which will either weaken the mortar or concrete or cause effloresence or attack the steel in
R.C.C. Container for transport, storage and handling of water shall be clean. Water shall conform to the
standards specified in I.S. 456-2000.
1.2 If required by the Engineer-in-charge it shall be tested by comparision with distilled water. Comparision
shall be made by means of standard cement tests for soundness, time of setting and mortar strength as
specified in I.S. 269-1989. Any indication of unsoundness, change in time of setting by 30 minutes or more
or decrease of more than 10 percent in strength of mortar prepared with water sample when compared
with the results obtained with mortar prepared with distilled water shall be sufficeint cause for
rejecttion of water under test.
1.3 Water for curing mortar, concrete or masonary should not be too acidic or too alkaline. It shall be free of
elements which significantly affect the hydration reaction or otherwise interfere with the hardening of
mortar or concrete during curing or those which produce objectionable stains or other unsightly deposits
on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Portable water shall generally be found suitable for curing mortar or concrete.
2.1 Lime shall be hydraulic lime as per I.S. 712-1984. Necessary tests shall be carried out as per I.S.
2.2 The following field tests for limes are to carried out ---
a] A very rough idea can be formed about the type of lime by its visual examination i.e. fat lime bears pure
white colour, lime in form of porous lumps of dirty white colour, indicates quick lime, and solid lumps the
unbrunt lime stone.
b] Acid tests for determining the carbonate content in lime. Excessive amount of impurities and rough
determination of class of lime.
2.3 Storage shall comply with I.S. 712-1984. The slaked lime, if stored, shall be kept in a weather proof and
damp proof shed with impervious floor and sides to protect it against rain, moisture, weather and
extraneous materials mixing with it. All lime that has been damaged in any way shall be rejected and all
rejected materials shall be removed from site of work.
2.4 Field testing shall be done according to I.S. 162-1989 to show the acceptaibility of materials.
3.1 Cement shall be ordinary portland slag cement as per I.S. 269-1989 or Portland slag cement as per I.S. 455-
1976 and revised latest I.S.
M-4 WHITE CEMENT :
4.1 The white cement shall conform to I.S. 8042-1989.
M-5 COLOURED CEMENT :
5.1 Coloured cement shall be with white or grey portland cement as specified in the item of the work.
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of cement
used in the mix. The mixture of pigment and cement shall be properly ground to have a uniform colour and
shade. The pigments shall have such properties as to provide for durability under exposure to sun-light and
5.3 The pigment shall have the properly such that it is neigher affected by the cement not detrimental to it.
6.1 Sand shall be natural sand, clean, well graded, strong, durable and gritty particles free from injurious
amounts of dust, clay, kankar nodules, soft or flaky particles, shale, alkaly, salts, organic mater, loam,
mica or other deleterious substances and shall be got approved from the Engineer-in-charge. The sand
shall not contain more than 8% of silt as determined by field tests. If necessary the sand shall be washed to
6.2 Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed 3.0.
The sieve analysis of coarse shall be as under ---
I.S. Sieve Designation % by weight passing sieve I.S. Sieve Designation % by weight passing sieve
6.3 Fine Sand : The finess modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as under ---
I.S. Sieve Designation % by weight passing sieve I.S. Sieve Designation % by weight passing sieve
M-7 STONE DUST :
7.1 This shall be obtained from crushing hard black tray or equivalent, it shall not contain more than 8% of
silt as determined by field test with measuring cylinder. The method of determining silt contents by field
test is given as under.
7.2 A sample of stone dust to be tested shall be placed without drying in 200 mm measuring cylinder. The
quantity of the sample shall be such that it files the cylinder upto 100 mm mark. The clean water shall be
added upto 150 mm mark. The mixture shall be stirred vigorously and the content allowen to settle for
7.4 The height of silt visible as settled layer above the stone dust shall be expressed as percentage of the
height of the stone dust below. The stone dust containing more than 8% silt shall be washed so as to bring
the silt content within the allowable limit.
7.5 The fineness modulus of stone dust shall not be less than 1.80.
M-8 STONE GRIT :
8.1 Grit shall consist of crushed or broken stone and be hard, strong, dense, durable, clean, of proper gradation
and free from skin or coating likely to prevent proper adhesion of mortar. Grit shall generally be cubical in
shape and as far as possible flaky elongated pieces shall be avoided. It shall generally comply with the
provisions of I.S. 383-1990. Unless a special stone of a particularly quarry is metnioned, grit shall be
obtained from the best black trap or equivalent hard stone as approved by the Engineer-in-charge. The
grit shall have no deleterious reaction with cement.
8.2 The grit shall conform to the following gradation as per sieve analysis :
I.S. Sieve Designation % by weight passing sieve I.S. Sieve Designation % by weight passing sieve
8.3 The crushing strength of grit will be such as to allow the concrete in which it is used to build-up the
specified strenght of concerte.
8.4 The necessary tests for grit shall be carried out as per the requirements of I.S. 2338 (Parts I to VIII) 1988, as
per instruction of the Engineer-in-charge. The necessity of test will be decided by the Engineering-in-
9.1 Cinder is well brunt furnace residue which has been fused or ssintered into lumps of varying sizes.
9.2 Cinder aggregates shall be well burnt furnace residue obtained from furnace using coal fuel only. It
shall be sound clead and free from clay, dirt, ash or other deleterious matter.
9.3 The average grading for cindar aggregates shall be as mentioned below :
M-10 LIME MORTAR :
10.1 LIME : Shall conform to specification M-2. WATER : Water shall conform to specification M-1. SAND :
Sand shall conform to specification M-6.
10.2 PROPORTION OF MIX Mortar shall consist of such proportions of slaked lime and sand as may be
specified in the item. The slaked lime and shall shall be measured by volume.
10.3 PREPARATION OF MORTAR Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power
driven mill shall be used for preparation of lime mortar. The slaked lime shall be placed in the mill in an
even layer and ground for 180 revolutions with sufficient water. Water shall be added as required during
grinding (care being taken not to add more water) that will bring the mixed material to a consistency of
stiff paste. Thoroughly wetted sand shall then be added evenly and the mixture ground for another
10.4 STORAGE : Mortar shall always be kept damp, protected from sun and rain till used up, covering it by
trapaulin or open sheds.
10.5 USE:All mortar shall be used as soon as possible after grinding. It should be used on the day on which it is
prepared. But in no case mortar made earlier than 36 hours shall be permitted for use.
M-11 CEMENT MORTAR :
11.1 Water shall conform to specification M-1. Cement shall conform to specification M-3. Sand shall conform
11.2 PROPORTION OF MIX : 11.2.1 Cement and sand shall be mixed to specified proportions, sand being
measured by measuring boxes. The proportion of cement shall be by volume on the basis of 50 Kg./Bag of
cement being equal to 0.0342 cu.m. The mortar may be hand mixed or machine mixed as directed.
11.3 PREPARATION OF MORTAR : 11.3.1 In hand mixed mortar, cement and sand in the specified proportions
shall be thoroughly mixed dry on a clean impervious platform by turning over atleast 3 times or more till
a homogeneous mixture of uniform colour is obtained. Mixing platform shall be so arranged that no
deleterious extraneous material shall get mixed with mortar or mortar shall flow out. While mixing, the
water shall be gradually added and thoroughly mixed to form a stiff plastic mass of uniform colour so that
each particle of sand shall be completely covered with a film of wet cement. The water cement ratio shall
be adopted as directed.
11.4 The mortar so prepared shall be used within 30 minutes of adding water. Only such quantity of mortar
shall be prepared as can be used within 30 minutes.
M-12 STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
12.1 Coarse agrregate shall be of machine crushed stone of black trap or equivalent and be hard, strong, dense,
durable, clean and free from skin and coating likely to prevent proper adhesion of mortar.
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular quarries are
mentioned aggregates shall be machine crushed from the best black trap or equivalent hard stone as
approved. Aggregrate shall have no deleterious reaction with cement. The size of the coarse aggregate for
plain cement concrete and ordinary reinforced cement concrete shall generally be as per the table given
below. However, in case of reinforced cement concrete the maximum limit may be restricted to 6 mm.
less than the minimum lateral clear distance between bars or 6mm. less than the cover whichever is
I.S. Sieve Percentage Passing for single sized I.S. Sieve Designation Percentage Passing for single sized
Designation aggregates of nominal size aggregates of nominal size
NOTE:- This percentage may be varied somewhat by the Engineer-in-charge when considered necessary
for obtaining better density and strength of concrete.
12.3 The grading test shall be taken in the beginning and at the change of source of materials. The necessary
tests indicated in I.S. 383-1990 and I.S. 456-2000 shall have to be carried out to ensure the acceptability.
The aggregates shall be stored separately and handled in such a manner as to prevent the intermixng of
different aggregates. If the aggregates are covered with dust, they shall be washed with water to make,
M-13 BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
13.1 Aggregate for Design Mix Concrete : Coarse aggregate shall be of machine crushed stone of black trap or
equivalent hard stone and be hard, strong, dense, durable, clean and free from skin and coating likely to
prevent proper adhesion of mortar.
13.2 The aggregates shall generally be cubical in shape, unless special stones of particular quarries are
mentioned, aggregates shall be machine crushed from the best, black trap or equivalent hard stones as
approved. Aggregate shall have no deleterious reaction with cement.
13.3 The necessary tests indicated in I.S. 383-1990 and I.S. 456-2000 shall have to be carried out to ensure
the acceptability of the material.
13.4 If aggregate is covered with dust it shall be washed with water to make it clean.
M-14 BRICK BATS AGGREGATE :
14.1 Brick bat aggregate shall be broken from well burnt or slightly over burnt and dense bricks. It shall
be homogeneous in texture, roughly cubical in shape, clean and free from dirt of any other foreign
material. The brick bats shall be of 40 mm to 50 mm size unless otherwise specified in the item. The
underburnt or overburnt brick bats shall not be allowed.
14.2 The brick bats shall be measured by volume by suitable boxes as directed.
15.1 The bricks shall be hand or machine moulded and made from suitable soils and kiln burnt. They shall be
firee from cracks and flaws not nodules of free lime. They shall have smooth rectangular faces with
sharp corners and shall be of uniform colour. The bricks shall be moulded with a frog of 100mm x 40 mm
and 10mm to 20mm deep on one of its flat sides. The bricks shall not break when dropped on the ground
from a height of 600 mm.
15.2 The size of modular bricks shall be 190mm x 90mm x 90mm.
15.3 The size of conventional bricks shall be as under ---
15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall be permitted
in the conventional size adopted in a particular work.
Length : 3.00 mm
Width : 1.50 mm
Height : 1.50 mm
15.5 The crushing strength of the bricks shall not be less then 35 Kg./Sq.Cm. The average water absorption shall
not be more than 20% by weight. Necessary tests for crushing strength and water absorption etc. shall
be carried out as per I.S. 3495 (Part I to IV)-1992.
M-15A FLYASH BUILDING BRICKS :
The Flyash building bricks shall conform to Grade-5 of IS-13757. The frog of the 80 to 100 mm x 40 mm x
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 230 mm x 110 mm x 70 mm.
Only bricks of one standard size shall used on one work. The following tolerances shall permitted in the
conventional size adopted in a particular work:
Length : ñ 4 mm
Height : ñ 2 mm
The physical characteristic of bricks shall be as follows.
The minimum compressive strength of Flyash building bricks shall not be less than 70 Kg/Sq.Cm. and the test
shall be conform to IS-3495 (Part-I).
The averages water absorption not more than 20 percentage by weight and the test shall conform to IS-
3495(Part-3). Sampling of Flyash building bricks and criteria for conformity shall be as per I.S.:5454.
16.1 The stone shall be of the specified variety such as Granite/Trap stone/Quarzite or any other type of good
hard stones. The stones shall be obtained only from the approved quarry and shall be hard, sound, durable
and free from defects like cavities, cracks, sand holes, flaws, injurious viens, patches of loose or soft
materials etc. and weathered portions and other structural defects or imperfections tending to
affect their soundness and strength. The stone with round surface shall not be more than 5% of dry
weight. When tested in accordance with I.S. 1134-1985. The minimum crushing of the strength of the
stone shall be 200 Kg./Sq.Cm. unless otherwise specified.
16.2 The samples of the stone to be used shall be got approved before the work is started.
16.3 The khanki facing stone shall be dressed by chisel as specified in the item for khanki facing in required
shape and size. The face of the stone shall be so dressed that the bushing on the exposed face shall not
project by more than 40 mm. from the general wall surface and on face to be plastered it shall not project
by more than 19 mm nor shall it have depressions more than 10 mm from the average wall surface.
M-17 LATERITE STONE :
17.1 Laterite stone shall be obtained from the approved quarry. It shall compacted in texture, sound, durable
and free from soft patches. It shall have a minimum crushing strength of 100 Kg/Sq.Cm. in its dry
condition. It shall not absorb water more 20% of its own weight, when immersed for 25 hours in water. After
quarrying, the stone shall be allowed to weather for some time before using in work.
17.2 The stone shall be dressed into rectangular blocks so that all faces are from waviness and unevenness and
the edges true and square.
17.3 Those type of stone in which white clay occurs should not be used.
17.4 Special corner stones shall be provided where so directed.
M-18 MILD STEEL BARS/TMT/CRS BARS :
18.1 Mild steel bars reinforcement TMT/CRS Bars for R.C.C. work shall conform to I.S. 432 (Part-II)-1982 and shall
be of tested quality. It shall also comply with the relevant part of I.S. 456-1978 and revised latest I.S. Code.
18.2 All the reinforcement shall be clean and free form dirt, paint, grease, mill scale or loose or thick rust at the
time of placing.
18.3 For the purpose of payment the bar shall be measured correct upto 10 mm length and weight payable
worked out as per the rate specified below :
(i) 6 mm 0.22 Kg/Rmt.
(ii) 8 mm 0.39 Kg/Rmt.
(iii) 10 mm 0.62 Kg/Rmt.
(iv) 12 mm 0.89 Kg/Rmt.
(v) 14 mm 1.21 Kg/Rmt.
(vi) 16 mm 1.58 Kg/Rmt.
(vii) 18 mm 2.00 Kg/Rmt.
(viii) 20 mm 2.47 Kg/Rmt.
(ix) 22 mm 2.98 Kg/Rmt.
(x) 25 mm 3.85 Kg/Rmt.
(xi) 28 mm 4.38 Kg/Rmt.
(xii) 32 mm 6.32 Kg/Rmt.
(xiii) 36 mm 8.00 Kg/Rmt.
(xiv) 40 mm 9.86 Kg/Rmt
M-19 HIGH YIELD STRENGTH STEEL DEFORMED BARS :
19.1 High yield strength steel deformed bars shall be either cold twisted or hot rolled and shall conform to I.S.
1739-1978 and I.S. 1139-1966 respectively.
19.2 Other provision and requirements shall conform to specification No. M-18 for Mild Steel Bars.
M-20 HIGH TENSILE STEEL WIRES :
20.1 The high tensile wires for use in prestressed concrete shall conform to I.S. 2090-1983.
20.2 The tensile strength of the high tensile steel bars shall be as specified in the item. In absence of the given
strength and minimum strength shall be taken as per para 6-1 of the I.S. 1785-1962. Testing shall be
done as per I.S. requirements.
20.3 The high tensile steel shall be free from loose mill scale, rust, oil, grease or any other harmful matter.
Cleaning of steel bars may be carried out by immersion in solvent solution, wire brushing or passing
through a pressure box containing carborundum.
20.4 The high tensile wire shall be obtained from manufactures in coils having diameter not less than 350 times
the diameter of wire itself so that wire springs back straight on being uncoiled.
M-21 MILD STEEL BINDING WIRE :
21.1 The mild steel wire shall be of 1.63mm or 1.22mm (16 or 18 guage) diameter and shall conform to I.S. 280-
21.2 The use of black wire will be permitted for binding reinforcement bars. It shall be free from rust, oil,
paint, grease, loose mill scale or any other undesirable coating which may prevent adhesion of cement
M-22 STRUCTURAL STEEL :
22.1 All structural steel shall conform to I.S. 226-1975. The steel shall be free from the defects mentioned in I.S.
226- 1975 and shall hae a smooth finish. The material shall be free from loose mill scale, rust pits or
other defects affecting the strength and durability. Rivet bars shall conform to I.S. 1148-1992.
22.2 When the steel is supplied by the contractor test certificates of the manufacturers shall be
obtained according to I.S. 226-1975 and other relevant Indiand Standards.
M-23 GALVANISED IRON SHEETS :
23.1 The galvanised iron sheets shall be plain or corrugated sheets of gauge as specified in item. The G.I.
Sheets shall conform to I.S. 277-1992. The sheets shall be undamaged in carriage and handling either by
rubbing off of zinc coating or otherwise. They shall have clean and bright surface and shall be free from
dents, bends, holes, rust or white powdery deposit.
23.2 The length and width of G.I. sheets shall be as directed as per site condition.
M-23-A G.I.VALLEYS GUTTER, RIDGES :
23-A.1 The G.I. ridges and hips shall be of plain galvanised sheets class-3 of the thickness as specified in item. These
shall be 600 mm width and properly bent up to shape without damage to the sheets in process of bending.
23-A.2 Valleys gutters and flashings shall be also of galvanised sheet of thickness as specified in item. Valleys shall
be 900 mm. wide over all and flashing shall be 380 mm wide over all. They shall be bent to the required
shape without damage to the sheet in the process of bending.
M-24 ASBESTOS CEMENT SHEETS :
24.1 Asbests cement sheets plain, corrugated or semi-corrugated shall conform to I.S. 459-1970. The thickness
of the sheets shall be as specified in the item. The sheet shall be free from all defects such as cracks, holes,
deformities, chipped edges or otherwise damaged.
24.2 Ridges and Hips :
24.2.1 Ridges and hips shall be of same thickness as that of A. C. sheets. The types of ridges shall be suitable for the
type of sheets and locations.
24.2.2 Other accessories to be used in roof such as flashing pieces, eaves filler pieces, valley gutters, north light
and ventilator curves, barge boards etc. shall be of standard manufacture and shall be suitable for the type
of sheets and location.
M-25 MANGALORE PATTERN ROOF TILES :
25.1 The Mangalore pattern tiles shall conform to I.S. 654-1992 for Class `AA' or `A' type as specified in item.
Samples of the tiles to be provided shall got approved from the Engineer-in0charge. Necessary tests
shall be carried out as directed.
M-26 SHUTTERING :
26.1 The shuttering shall be either of wooden planking of 30mm minimum thickness with or without steel lining
or of steel plates stiffened by steel angles. The shuttering shall be supported on battens and beams and
props of vertical ballies properly cross bracked together so as to make the centering rigid. In places of ballie
props, bricks pillar of adequate section built in mud mortar may be used.
26.2 The form work shall be sufficiently strong and shall have camber, so that it assumes correct shape after
deposition of the concrete and shall be able to resist forces caused by vibration of concrete, live load of
men working with it and other incidental loads associated with it. The shuttering shall have smooth and
even surface and its joints shall not permit leakage of cement grout.
26.3 If at any stage of work during or after placing concrete in the structure, the form work sags or bulges out
beyond the required shape of the structure, the concrete shall be removed and work redone with fresh
concrete and adequately rigid form work. The complete form work shall be got inspected by and
approved from the Engineer-in-charge, before the reinforcement bars are placed in position.
26.4 The props shall consists of bullies having 100mm minimum diameter measured at mid length and 80mm
at thin end and shall be placed as per design requirement. These shall rest squarely on wooden sole
plates 40 mm. thick and minimum bearing area of 0-10 sq.m. laid on sufficiently hard base.
26.5 Double wedges shall further be provided between the sole plate and wooden props so as to facilitate
tightening and easing of shuttering without jerking the concrete.
26.6 The timber used in shuttering shall not be so dry so as to absorb water from concrete and swell or bulge
nor so green or wet so as to shrink after erection. The timber shall be properly sawn and planed on the
sides and the surface coming in contact with concrete. Wooden form work with metal sheet lining or steel
plates stiffened by steel angles shall be permitted.
26.7 As far as practicable, clamps shall be used to hold the forms together and use of nails and spikes avoided.
26.8 The surface of timber shuttering that would come in contact with concrete shall be well wetted and coated
with soap solution before the concreting is done. Alternatively coat of raw linseed oil or oil of approved
manufacture may be applied in place of soap solution. In case of steel shuttering either soap solution
or raw linseed oil shall be applied after thoroughly cleaning the surface. Under no circumstances black or
burnt oil shall be permitted.
26.9 The shuttering for beams and slabs shall have camber of 4mm per metre (1 in 250) or as directed by the
Engineer-in-charge so as to offset the subsequent deflection. For cantilevers, the camber at free end
shall be 1/50 of the projected length or as directed by the Engineer-in-charge.
M-27 EXPANSION JOINTS - PREMOULDED FILLER :
27.1 The item provides for expansion joints in R.C.C. frame structures for internal joints, as well as exposed
joints, with the use of premoulded bituminous joint filler.
27.2 Premoulded bituminous joint filler, i.e. performed stirp of expansion joint filler shall not get deformed or
broken by twisting, bending or other handing when exposed to atmospheric condition. Pieces of
joint filler that have been damaged shall be rejected.
27.3 Thickness of the pre moulded joint filler shall be 25 mm unless otherwise specified.
27.4 Premoulded bituminous joint filler shall conform to 1.5 1838-1961.
M-28 EXPANSION JOINTS - COPPER STRIPS AND HOLD FASTS :
28.1 The item provides for expansion joints in R.C.C. frame structure for internal joints as well as for exposed
joints with the use of necessary copper strip and holdfasts.
28.2 Copper sheet shall be 1.25 mm thick and of 1.25 mm with `U' shape in the middle, copper strip shall have
holdfast of 3 mm diameter copper rod fixed to the plate soldered on strip at intervals o f about 30 cm. or as
shown in the drawing or as directed. The width of each flange (horizontal side) of the copper plate to be
embedded in the concrete work shall be 25 mm Depth of `U' to be provided in the expansion joint, in the
copper plate shall be of 25 mm.
M-29 TEAK WOOD :
29.1 The teak wood shall be of good quality as required for the item to be executed. When the kind of
wood is not specifically mentioned, good Indian teak wood as approved shall be used.
29.2 Teak wood shall generally be free from large, loose, dead or cluster knots, flaws, warps, twists, shakes,
bends or any other defects. It shall generally be uniform in substance and of straight fibres as far as
possible. It shall be free from rot, decay, harmful fungi and other defects of harmful nature, which will
affect the strength, durability or its usefulness for the purpose for which it is required. The colour shall be
uniform as far as possible. Any effort like painting, using any adhesive or resinous materials made to hide
the defects shall render the pieces liable to rejection by the Engineer-in-charge.
29.3 All scantlings, planks etc. shall be sawn in straight lines and planes in the direction of grains and of
uniform thickness.
29.4 The tolerances in the dimensions shall be allowed at the rate of 1.5 mm per face to be planed.
29.5 First Class Teak Wood :
First clas teak wood shall have no individual hard and sound knots, more than 6 sq.cm. in size and the
aggregate area of such knots shall not be more than 1% of area of piece. The timber shall be closed
29.6 Second Class Teak Wood :
No individual hard and sound knots shall be more than 15 sq.cm. in size and aggregate area of such knots
shall not exceed 2% of the area of piece.
M-29-A NON-TEAK WOOD :
The non teak wood shall be chemically treated, seasoned as per I.S. Specifications and of good quality. The
type of wood shall be got approved before collecting the same on site. Fabrication of wooden members
shall be started only after approval. For this purpose wood of Bio, Kalai, Sires, Saded, Behda, Jamun, Sisoo
will be used for door frames whereas only Kalai, Siras, ,Halda, Kalam etc. will be permitted for shutters
after proper seasoning and chemical treatment.
The non teak wood shall be free from large, loose dead of cluster knots, flows, shakes, warps, bends, or
any other defect. It shall be uniform in substance and of straight fibres as far as possible. It shall be free
from rots, decay, harmful fungi and other defects of similar nature which will affect the strength,
durability or its usefullness for the purpose for which it is required. The colour of the wood shall be
uniform as far as possible. The scantalings, planks etc. shall be sawn in straight lines and planes in the
direction of grain and of uniform thickness.
The department will use the Agency to produce a certificate from the Forest Department in the event of a
dispute and the ddecision of the Department shall be final and binding to the contractor.
The tolerance in the dimension shall be allowed at 1.5 mm. per face to be planed.
M-30 WOODEN FLUSH DOOR SHUTTERS (SOLID CORE) :
30.1 The solid core type flush door shutters shall be of decorative or non-decorative type as specified in
the drawing. The size and thickness of the shutter shall be as specified in drawings or as directed. The
timber species for core shall be used as per I.S. 2202-(Part-I)-1991. The timber shall be free from decay and
insect attack. Knots and knot holes less than half the width of cross-section of the members, pitch streaks
and harmless pin holes shall be permissible except in the exposed edges of the core members. The
commercial plywood, cross bands shall conform to I.S. 303-1298.
30.2 The face panel of the shutters shall be formed by gluing by the hot press process on both faces of the core
with either plywood or corss bands, and face veneers. The lipping, rebating, opening of glazing,
venetion etc. shall be provided if specified in the drawing.
30.3 All edges of the door shutters shall be square. The shutters shall be free form twist or warp in its
plane. Both faces of the shutters shall be sand papered to smoot even texture.
30.4 The shutters shall be tested for ---
i] End Immersion Test : The test shall be carried out as per I.S. 2202 (Part-I) 1991. There shall be no
delamination at the end of the test.
ii] Knife Test : The face panel when tested in accordance with I.S. 1659-1990 shall pass the test.
iii] Glue Adhesion Test : The flush door shall be tested for glue adhesive test in accordance with I.S. 2202(Part-
I)- 1991. The shutters shall be considered to have passed the test if no delamination occurs in the glue
lines in the plywood and if no single delamination more than 80 mm. in length and more than 3 mm. in depth
has occured in the assembly glue lines between the plywood face and the style and rail. Delamination at
the corner shall be measured continously around the corner. Delamination at the knots knot, hole and
other permissible wood defects shall not be considered in assessing the sample.
30.5 The tolerance in size of solid core type flush door as under:-
In nominal thickness # 1.2 mm. In nominal height # 3 mm. The thickness of the shutters shall be uniform
throughout with a permissible variation of not more than 0.8 mm. when measured at any two points.
M-31 ALUMINIUM DOORS, WINDOWS, VENTILATORS :
31.1 Aluminium alloy used in the manufacture of extruded window sections shall conform to I.S. desgnation
HEA-WP of I.S.:733- 1991 and also to I.S. Designation WVG - WP OF I.S.:1285-1991. The sections shall be
as specified the drawing and design. The fabrication shall be done as directed.
31.2 The hinges shall be cast or excluded aluminium hinges of same type as in window but or large size.
31.3 The hinges shall normally be of 50 mm projecting type non projecting type of hinges may also be used if
directed. The handles of door shall be of specified design. A suitable lock for the door operable either
from outside shall be provided. In double shutter door, the first closing shall have a concealed aluminium
alloy bolt at top and bottom.
M-32 ROLLING SHUTTERS :
32.1 The rolling shutters shall conform to I.S. 6248-1991. Rolling shutters shall be supplied of specified type with
accessories. The size of the rolling shutters shall be specified in the drawings. The shutters shall be
constructed with interlocking lath sections formed from cold rolled steel strips not less than 0.9 mm. thick
and 80 mm. wide for shutters upto 3.5 m. Width not less than 1.25 mm. thick and 80 mm. wide for shutters
3.5 m. in width and above unless otherwise specified.
32.2 Guide channels shall be of mild steel deep channel section and of rolled pressed or built up (fabricated)
jointless construction. The thickness of sheet used shall not be less than 3.15 mm.
32.3 Hood covers shall be made of M.S. sheets not less than 0.92 mm. thick. For shutters having width 3.5 mts.
and above, the thickness of M.S. sheet for the hood covers shall be not less than 1.25 mm.
32.4 The spring shall be of best quality and shall be manufactured from tested high tensile spring steel
wire or strip of adequate strength to balance the shutters in position. The spring pipe shaft etc. shall be
supported on strong M.S. or malleable C.I. brackets. The brackets shall be fixed on the or under the lintel
as specified with rawl plugs and screws bolts etc.
32.5 The rolling shutters shall be of self rolling type upto 8 sq.m. clear area without ball bearing and upto
sq.m. clear area with ball bearing. If the rolling shutters are of larger then gear operated type shutters shall
32.6 The locking arrangement shall be provided at the bottom of shutter at both ends. The shutters shall be
opened from outside.
32.7 The shutters shall be completed with door suspension, shafts, locking arrangements, pulling hooks,
handles and other accessories.
M-33 COLLAPSIBLE STEEL GATE :
33.1 The collapsible steel gate shall be in one or two leaves and size as per approved drawings or as specified.
The gate shall be fabricated from best quality mild steel channels, flates etc. Either steel pulleys or ball
bearings shall be provided in every double channel. Unless otherwise specified the particulars of
collapsible gate shall be as under ---
i] Pickets : These shall be of 20 mm. M.S. channels of heavy sections unless otherwise shown on drawings.
The distance centre to centre of pickets shall be 12 cms. with an opening of 10 cms.
ii] Pivoted M.S. flats shall be 20 mm. x 6 mm.
iii] Top and bottom guides shall be from tee or flat iron of approved size.
iv] The fittings like stoppers, fixing hold fasts, locking cleats, brass handles and cast iron rollers shall be of
approved design and size.
M-34 WELDED STEEL WIRE FABRIC:
34.1 Welded steel wire fabric for general purpose shall be manufactured from cold drawn steel `as drawn' or
galvanised steel conforming to I.S. 226-1975 With longitudinal and transverse wire seurely connected at
every intersection by a process of electrical resistance welding and conforming to I.S. 4948-1974. It shall be
fabricated and finished in a workman like manner and shall be free from injurious defects and shall be ruest
proof. The type of mesh shall be oblong or square as directed. The mesh sizes and sizes of wire for square
as well as oblong welded steel wire fabric shall be as directed. The steel wire fabric in panels shall be in
one whole piece in each panel as far as stock sizes permit.
M-35 EXPANDED METAL SHEETS :
35.1 The expanded metal sheets shall be free from flaws, joints, welds, broken, stands, laminations and other
harmful surface defects Expanded metal steel sheet shall conform to I.S. 412 - 1992 except that blank
sheets need not be with guaranteed mecanical properties. The size of the diamond mesh of expanded
metal and dimensions of strands (width and thickness) shall be as specified. The tolerance on nominal
weight of expanded metal sheets shall be of + 10 per cent.
35.2 Expanded metal in panels shall be in one whole piece in each panel as far as stock sizes permit. The
expanded metal sheets shall be coated with suitable protective coating to prevent corrosion.
M-36 MILD STEEL WIRE (Wire Gauze Jali) :
36.1 Mild steel wire may be galvanised, as indicated. All finished steel wire shall be well cleanly drawn to
the dimensions and size of wire as specified in item. The wire shall be sound, free from slits, surface flaws,
rough jagged and imperfect edges and other harmful surface defects and shall conform to I.S. 280-1992.
37.1 The Plywood for general purpose shall conform I.S. 303-1998. Plywood is made by cementing together thin
boards or sheets of wood into panels. There are always an old number of layers 3, 5, 7, 9 ply etc. The
plies are placed so that the grain of each layer is at right angles to the grain in the adjacent layers.
37.2 The chief advantage of plywood over a single board of the same thickness is the more uniform strength of
the plywood along the length and width of the plywood and greater resistance to cracking and slitting
with change in moisture content.
37.3 Usually synthetic resins are used for gluieg. Phenolic resins are usually cured in a hot press which
compresses and simultaneously heats the plies between hot plates which maintain a temperature of
degree C. to 140 degree C. and a pressure of 11 to 14 Kg./Sq.cm. on the wood. The time of heating may be
any thing from 2 to 60 minutes depending upon thickness.
37.4 When water glue are used the wood absorbs so much Water that the finished plywood must be dried
carefully, When synthetic resins are used as adhesive the finished plywood must be exposed to
atmosphere of controlled humidity until the proper amount of moisture has been absorbed.
37.5 According to I.S. : 303-1998 the plywood for general purpose shall be of three grades namely BWR.WWR
and CWR depending upon the adhesives used for bonding the veneers and it will be further classified into
six types namely AA, AB, AC, BB, BC and CC based on the quality of the two faces, each face being of three
kinds namely A, B and C. After pressing, the finished plywood should be reconditioned to a moisture
content not less than 8 percent and not more than 16 percent.
37.6 THICKNESS OF PLYWOOD BOARDS
38.1 All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air holes blisters and
other defects. The kind of glass to be used shall be as mentioned in the item or specification or in the special
provisions or as shown in detailed drawings. Thickness of glass panes shall be uniform. The specifications
for different kinds of glass shall be as under ----
38.2 Sheet Glass :
38.2.1 In the absence of any specified thickness or weight in the item or detailed specifications of the item of work,
sheet glass shall be weighing 7.5 Kg./Sq.m. for panes upto 600 mm. x 600 mm.
38.2.2 For panes larger than 600 mm. x 600 mm. and upto 800 mm. x 800 mm. glass weighing not less than
Kg./Sq.m. shall be used. For bigger panes upto 900 mm. x 900 mm. glass weighing not less than
Kg./Sq.m. shall be used.
38.2.3 Sheet glass shall be patent flattened glass of best quality and for glasing and framing purposes shall conform
to I.S. 761-1963. Sheet glass of the specified colours shall be used, if so shown on detailed drawings or so
specified. For important buildings and for panes with any dimensions over 900 mm. plate glass of specified
thickness shall be used.
38.3.0 Plate Glass :
38.3.1 When plate glass is specified it shall be "Polished Patent Plate Glass" of best quality. It shall have both the
surface ground flate and parallel and polished to obtain clear undistured vision and reflection. The plate
glass shall be of the thickness mentioned in the item or as shown in the detailed drawing or as specified. In
the absence of any specified thickness, the thickness of plate glass to be supplied shall be 6 mm. and a
tolerance of 0.20 mm. shall be admissible.
38.4.0 Obscured Glass :
38.4.1 This type of glass transmits light so that vision is partially or almost completely obscured. Glass shall be
plain rolled, figured, ribbed or fluted, or frosted glass as may be specified as required. The thickness and
type of glass shall be as per details on drawings or as specified or as directed.
38.5.0 Wired Glass :
Glass shall be with wire netting embedded in a sheet of plane glass. Electrically welded 13 mm.
Georgain square mesh shall be used. Thickness of glass shall not be less than 6 mm. wired glass shall be
of type and thickness as specified.
M-39 ACRYLIC SHEETS :
39.1 Acrylic sheets shall be of thickness as specified in the item and of a specified shape and size as the case
may be. Penels may be flat or curved. It should be light in weight. It shall be colourless or coloured or
opaaue as specified in the item. Colourless sheet shall be as transparent as the finest optical glass. Its light
transmission rate shall be about 95%. Transparancy shall not be affected for the sheets of larger thickness.
It shall be extremely resistant to sunlight, weather and low temperatures. It shall not show any significant
yellowing or change in physical properties or loss of light transmission over a longer period of use.
The sheet shall be impact resistant also. Sheets should be available in complete range of standard
transparent, translucemtn and opaque colours. Sheets should be available in complete range of standard
transparent, translucent and opaque colours. Sheets shall be of such quality that they can be cut, bent and
jointed as desired. Solution for the joints shall be used as per the requirement of manufacture.
M-40 PARTICLE BOARD :
40.1 The particle boards used for face panels shall of best quality free from any defects. The particle boards
shall be made with phenolmaldehyde adhesive. The particle boards shall conform to I.S. 3087-1990.
"Specification for wood particle board for general purpose." The size and the thickness of the particle
board shall be as specified.
M-41 EXPANDED POLYSTYRENE OR FRAMES STYROPER SLEBS :
41.1 The expanded polystyrene ceiling boards and tiles shall be of approved make and shall be of size thickness,
finish and colour and indicated. It shall be of high density and suitable for use as insulting material.
The insulting material shall be like slab of thermocole etc.
M-42 RESIN BONDED FIBRE GLASS :
42.1 The resin bonded fibre glass tiles or rools shall be of approved make and shall be sizes, thickness and
finish as indicated.
42.2 For test of Mineral wood thermal insulation Blanket I.S. 3144-1965 followed.
42.3 Insulation wool blanket shall be with the following coverings on one or both sides as indicated.
(1) Bituminised bessian kraft paper suitable for use in position where moisture has to be excluded.
(2) Hessain cloth or Kraft paper for keeping out dust.
(3) G. I. wire netting, suitable or surfaces to be plastered over.
M-43 FIXTURES & FASTENINGS :
i] The fixtures and fastenings, that is, butt, hingers, tee and strap hinges, sliding door bolts, tower bolts, door
latch, bath-room latch, handles, door stoppers, casement window fasteners, casement stays and
ventilator catch shall be made of the metal as specified in the item or its specifications.
ii] They shall be of iron, brass, aluminium, chromium plated iron, chromium plated brass, copper oxidised
iron, copper oxidised brass or anodised aluminium as specified.
iii] The fixtures shall be heavy, medium or light type. The fixtures and fastenings shall be smooth finished and
shall be such as will ensure ease of operation.
iv] The samples of fixtures and fastenings shall be got approved as regards quality and shape before
providing them in position.
v] Brass and anodised aluminium fixtures and fastenings shall be bright finished.
i] Holdfasts shall be made from mild steel flat 30 cm. length and one of the holdfasts shall be bent at right
angle and two nos. of 6 mm. dia. hooles shall be made in it for fixing it to the frame with screws. At the
other end, the holdfast shall be forked and bent at right angles in opposite directions.
i] Railway standard heavy type butt hinges shall be used when so specified.
ii] Tee and strap hinges shall be manufactured from M.S. sheet.
Sliding Door Bolts (Aldrops) :
i] The aldrops as specified in the item shall be used and shall be got approved.
Tower Bolts (Barrel Type) :
i] Tower bolts as specified in the item shall be used and shall be got approved.
i] The size of door latch shall be taken as the length of latch.
Bathroom Latch :
i] Bathroom latch shall be similar to tower bolt.
i] The size of the handles shall be determined by the inside grip length of the handles. Handles shall have a
base plate of length 50 mm. more than the size of the handle.
Door Stoppers :
i] Door stoppers shall be either floor door stopper type or door catch type. Floor stopper shall be of overall
size as specified and shall have a rubber cushion.
i] Door catch shall be fixed at a height of about 900 mm. from the floor level such that one part of the catch is
fitted on the inside of the shutter and other part is fixed in the wall with necessary wooden plug
arrangements for appropriate fixity. The catch shall be fixed 20 mm. inside the face of the door for easy
operation of catch.
Wooden Door Stop With Hinge :
i] Wooden door stop of size 100 mm. x 60 mm. x 40 mm. shall be fixed on the door frame with a hinge of
mm. size and at a height of 900 mm. from the floor level. The wooden door stop shall be provided with
coats of approved oil paint.
Casement Window Fastner :
i] Casement window fastener for single lead window shutter shall be left or right handed as directed.
Casement Stays (Straigot Peg.Stay) :
i] The stays shall be made from a channel section having three holes at appropriate position so that the
window can be opened either fully or partially as directed.
Size of the stay shall be 250 mm. to 300 mm. as directed.
Ventilator Catch :
i] The pattern and shape of the catch shall be as approved.
i] The base and socket plate shall be made from minimum 3 mm. thick plate, and projected pivot shall not be
less than 12 mm. dia. and 12 mm. length and shall be firmly riveted to the base plate case of iron pivot and
in single piece base in the case of brass pivot.
44.1 Oil Paints :
Oil paints shall be of the specified colour and shade, and as approved. The ready mixed paints shall only
be used. However, if ready mixed paint or specified shade or tint is not available white ready mixed paint
with approved stainer will be allowed. In such a case, the contractor shall ensure that the shade of the
paint so allowed shall be uniform.
All the paints shall meed with the following general requirements -
i] Paint shall not show excessive setting in a freshly opened full can and shall easily be redispressed with
paddle to a smooth homogeneous state. The paint shall show no curdling, livering, caking or colour
separation and shall be free from lumps and skins.
ii] The paint as received shall brush easily, possess good levelling properties and show no running or sagging
iii] The paint shall not skin within 48 hours in a three quarters filled closed container.
iv] The paint shall dry to a smooth uniform finish free from roughness, grit uneveness and other
Ready mixed paid shall be used exactly as received from the manufacturers and generally according to their
instructions and without any admixtures whatsoever.
44.2 Enamel Paints :
The enamel paint shall satisfy in general requirements as mentioned in specification of oil paints. Enamel
paints shall conform to I.S. 2933-1991.
M-45 FRENCH POLISH :
The french polish of required tint and shade shall be prepared with the below mentioned ingredients
and other necessary materials :
i] Denatured spirit of approved quality.
The french polish so prepared shall conform to I.S. 348-1991.
M-46 MARBLE CHIPS FOR MARBLE MOSAIC TERRAZZO :
46.1 The marble chips shall be of approved quality and shades. It shall be hard, sound, dense and homogeneous
in texture with crystalline and coarse grains. It shall be uniform in colour and free from stains, cracks,
decay and weathering.
46.2 The size of various colours of marble chips ranging from the smallest upto 20 mm. shall be used where the
thickness of top wearing layers is 6 mm. in size. The marble chips of approved quality and colours only as
per grading as decided by the Engineer-in-charge shall be used for marble mosaic tiles or works.
46.3 The marble chips shall be machine crushed. They shall be free from foreign matter, dust etc. Except as
above the chips shall conform to I.S. 2114-1990.
M-47 FLOORING TILES :
A] Plain Cement Tiles -
47.1.1 The plain cement tiles shall be of general purpose type. These are the tiles in the manufacture of which no
pigments are used. Cement used in the manufacture of tiles shall be as per Indian Standards.
47.1.2 The tiles shall be manufactured from a mixture of cement and natural aggregates by pressure process.
During manufacture, the tiles shall be subjected to a pressure of not less than 140 Kg./Sq.cm. The
proportion of cement to aggregate in the backing of the tiles shall be not leaner than 1:3 by weight. The
wearing face, though the tiles are of plain cement,shall be rpovided with stone chips of 1 to 2 mm size. The
proportion of cement to the marble chips aggregate in the wearing layer of the tiles shall be three parts
of cement to one part of chips by weight. The minimum thickness of wearing layer shall be 3 mm. The
colour and texture of wearing layer shall be uniform throughout its face and thickness. On removal from
mould, the tiles shall be kept in moist condition continuously atleast for seven days and subsequently, if
necessary, for such long period as would ensure their conformity to requirements of I.S. 1237-
requiring resistance to wear and water absorption.
47.1.3 The wearing face of the tiles shall be plain, free from projections, depressions and cracks and shall be
reasonably parallel to the back face of the tile. All angles shall be right angle and all edges shall be sharp and
47.1.4 The tile sizes shall generally be square shape 24.85cm. x 24.85cm. or 25cm. x 25cm. The thickness of the tiles
shall be 20 mm.
47.1.5 The tolerance of length and breadth shall be plus or minus 1 mm. The tolerance on thickness shall be plus
47.1.6 The tiles shall satisfy the tests as regards transverse strength, resistance to wear and water absorption as
47.2 B] Plain Coloured Tiles :
47.2.1 These tiles shall have the same specifications as for plain cement tiles as per (A) above except that they
shall have a plain wearing surface wherein pigments are used. They shall conform to I.S. 1237-1990.
47.2.2 The pigment used for colouring cement shall not exceed 10% by weight of cement used in the mix. The
pigments, synthetic or otherwise, used for colouring tiles shall have permanent colour and shall not
contain materials deterimental to concrete.
47.2.3 The colour of the tiles shall be specified in the item or as directed.
47.3 C] Marble Mosaic Tiles :
47.3.1 These tiles have the same specifications as per plain cement tiles except the requirements as stated below ---
47.3.2 The marble mosaic tiles shall conform to I.S. 1237-1990. The wearing face of the tiles shall be mechanically
ground and filled. The wearing face of tiles shall be free of projections, depresssions and cracks and shall
be reasonably parallel to the back face of the tiles. All angles shall be right angles and all edges shall be sharp
47.3.3 Chips used in the tiles be from smallest upto 20 mm. size. The minimum thickness of wearing layer of tiles
shall be 6 mm. For pattern of chips to be bad on the wearing face, a few samples with or without their full
size photographs as directed shall be presented to the Engineer-in-charge for approval.
47.3.4 Any particular samples, if found suitable shall be approved by the Engineer-in-charge, of he may ask for
particular sized chips to be more or less in the sample presented. The samples shall have to be made
by the contractor till a suitable sample finally approved for use in the work. The contractor shall ensure
that the tiles supplied for the work shall be in conformity with the approved sample only, in terms of its
dimensions, thickness of backing layer and wearing surface, materials, ingredients, colour shade,
chips, distribution etc. required.
47.3.5 The tiles shall be prepared from cement conforming to Indian Standards or coloured portland cement
generally depending upon the colour of tiles to be used or as directed.
47.4 D] Chequered Tiles :
47.4.1 Chequered tiles shall be plain cement tiles or marble mosaic tiles. The former shall have the same
specification as per (A) above and the latter as per marble mosaic tiles as per (C) except as mentioned
47.4.2 The tiles shall be of nominal size of 250mm. x 250mm. or as specified. The centre to centre distance of the
chequer shall not less than 25mm. and not more than 50mm. The overall thickness of the tile shall be
47.4.3 The grooves in the chequers shall be uniform and straight. The depth of the grooves shall not be less than
3mm. The chequered tiles shall be plain, coloured or mosaic as specified. The thickness of the upper layer
measured from the top of the chequers shall not be less than 6mm. The tiles shall be given the first
grinding with machine before delivery to site.
47.4.4 Tiles shall conform to relevant I.S. 1237-1990.
47.5 E] Chequered Tiles for Staircases :
47.5.1 The requirements of these tiles shall be the same as chequered tiles as per (D) above except in following
i] The length of a tile including nose shall be 330 mm.
ii] The minimum thickness shall be 28 mm.
iii] The nosing shall have also the same wearing layer at the top.
iv] The nosing edge shall be rounded.
v] The front portion of the tile for a minimum length of 75mm. from and including the nosing shall have
grooves running parallel to nosing and at centres not exceeding 25mm. Beyond that the tiles shall have
normal chequer pattern.
M-48 ROUGH KOTAH STONE :
48.1 The kotah stones shall be hard, even, sound and regular in shape and generally uniform in colour. The
colour of the stone shall generally be green. Brown coloured stones shall not be allowed for use. They
shall be without any soft veins, cracks or flaws.
48.2 The size of the stones to be used for flooring shall be size 600mm. x 60mm. and/or size 600mm. x 450mm.
as directed. However, smaller sizes will be allowed to be used to the extent of maintaining the required
pattern. Thickness shall be as specified.
48.3 Tolerance of minus 30 mm. on account of chisel dressing of edges sahll be permitted for length as well as
breadth. Tolerance in thickness shall be plus 3mm.
48.4 The edges of stones shall be truly chiselled and table rubbed with coarse sand before paving. All
angles and edges of the stone shall be true, square and free from chipping and the surface shall be true
48.5 When machine cut edges are specified, the exposed edges and the edges at joints shall be machine cut. The
thickness of the exposed machine cut edges shall be uniform.
M-49 POLISHED KOTAH STONES :
49.1 Polish kotah stone shall have the same specifications as per rough kotah stone except as mentioned below.
49.2 The stone shall have machine polished smooth surface. When brought on site, the stones shall be single
polished or double polished depending upon its use. The stones for paving shall generally be single
polished. the stones to be used for dedo, skirting, platforms sink, veneering, sills, steps etc. where
machine polishing after the stones are fixed in situ is not possible shall be double polished.
M-50 DHOLPUR STONE SLAB :
50.1 Dholpur stone slab shall be of best quality as approved by the Engineer-in-charge. The stone slab shall be
without any veins, cracks,and flaws. The stone slab shall be even, sound and durable, regular in shape and
uniform colour.
50.2 The size of the stone shall be as specified in the item or detailed drawing or as approved by the Engineer-
in-charge. The thickness of the stone shall be as specified in the item of work with the permissible
tolerance of plus of minus 2 mm. The provisions in respect of polishing as for polished kotah stone shall
apply to plished Dholpur stone also. All angles and edges of the face of stone slab shall be fine chiselled
or polished as specified in the item of work and all the four edges shall be machine cut. All engles and
edges of the stone slab shall be true and plane.
50.3 The sample of stone shall be got approved from the Engineer- in-charge for shade and tint for a particular
work. It shall be ensured the stones to be used in a particular work shall not differ much in shade or tint
from the approved sample.
M-51 MARBLE SLAB :
Marble slabs shall be white or of other colour and of best quality as approved by the Engineer-in-charge.
Slab shall be bard, close, uniform and in texture. They shall also be free defects and cracks. The surface
shall be machine polished to an even and perfectly plane surface and the edges, machine cut true and
square. The rear face shall be rough enough to provide key for the mortar.
Marble slabs with natural veins, if selected shall have to be laid as per the pattern given by the Engineer-in-
charge. Size of the slabs shall be minimum 450mm. x 450mm. and preferably 600mm. x 600mm.
However, smaller sizes will be allowed to be used to the extent of maintaining required pattern.
The slab shall not be thinner than the specified thickness at its thinest part. A few specimen of finished slab
to be used shall be deposited by the contractor in the office for reference.
Except as above, the marble slabs shall conform to I.S. 1130-1993 or as revised from time to time.
M-52 GRANITE STONE SLAB :
52.1 Granite shall be of approved colour and quality, The stone shall be hard even, sound and regular in shape
and generally uniform in colour. It shall be without and soft veins, cracks or flaws.
52.2 The thickness of the stone shall be specified in the item.
52.3 All exposed faces shall be double polished to tender truly smooth and even relecting surface. The
exposed edges and corners shall be rounded off as directed. The exposed edges shall be machine cut and
shall have uniform thickness.
M-53 P.V.C. FLOORING :
53.1 P.V.C. sheets for P.V.C. floor covering shall be homogenous flexible type, conformint to I.S. 3462-1991.
The P.V.C. covering shall neither develop any toxic effect while put to use not shall give off any disagreeable
53.2 Thickness of flexible type covering or tiles shall be as specified in the description of the item.
53.3 The flexible type shall be backed with hessain or other woven fabric. The following tolerance shall be
applicable on the nominal dimensions of the sheet rolls or tiles :
(a) Thickness +/- 0.15 mm
(b) Length or width
1. 300 mm Square tiles +/- 0.20 mm
2. 600 mm Square tiles. +/- 0.40 mm
3. 900 mm Square tiles. +/- 0.60 mm
4. Sheets and rolls. +/- 0.10 percent.
53.4 Adhesive :
53.4.1 The adhesive for PVC flooring shall be of the type and make recomended by the manufacturers of PVC sheets
M-54 FACING TILES :
54.1 The facing tiles (burnt clay facing bricks) shall be free from cracks, flaws, and nodules of free lime. They
shall be thoroughly burnt and shall have plane rectangular faces with parallel sides and sharp stright right
angled faces. The texture of the finished surface that will be exposed when in place, shall conform to an
approved sample consisting not less than four stretcher bricks each representing resistance to penetration
by rain and greater durability than common bricks. The tiles shall conform to I.S. 2691-1995.
54.2 The standard size of facing brick tiles shall be 19 x 9 x 4 cms. The facing brick tiles shall be provided with
frog which shall conform to I.S. 1077-1992.
54.3 The permissible tolerance in dimensions specified above shall be as follows.
Size Torrence for
1st Class Brick 2nd Class Brice
The tolerance for distortion or warpage of face or edges of individual brick from a plane surface and from a
straight line respectively shall be as follows :
Facing dimensions. Permissible tolerance.
Max. below 19 cms. Max. 2.5 mm.
Max. above 19 cms. Max. 3.0 mm
54.5 The average compressive strength obtained as a sample of five tiles when tested in accordances with the
produre aid as per I.S. 1077-1992 shall be not less than 175 Kg/Sq.cm. The average compressive strength
of any individual brick shall not less than 160 Kg/Sq.cm.
54.6 The average water absorption for five brick tiles shall not be exceed 12 percent of average weight of
brick before testing. The absorption for each individual brick shall not exceed 25 percent.
54.7 The brick tiles when tested in accordance with I.S. 1077-1992 the rate of efflorescence shall not be more
than "Slightly effloresced".
M-55 WHITE GLAZED TILES :
55.1 The tiles shall be of best quality as approved by the Engineer-in-charge. They shall be flat and true to
shape. They shall be free from cracks, crazing, spots, chipped edges and corners. The glasing shall be of
55.2 The tiles shall be of nominal size of 150mm. x 150mm. unless otherwise specified. The maximum variation
from the stated sizes, other than the thickness of tile, shall be plus or minus 1.5mm. The thickness of the
tile shall be 6mm. except as above the tiles shall conform to I.S. 777-1988.
M-56 GALVANISED IRON PIPES AHND FITTINGS :
Galvanised iron pipe shall be of the medium type and of required diameter and shall comply with I.S.
1239-1990. The specified diameter of the pipes shall refer to the inside diameter of the bore. Clamps,
screw and all glavanised iron fittings shall be of the standard `R' or equivalent make.
M-57 BIB COCK AND STOP COCK :
57.1 A bib cock is a draw off tap with a horizontal inlet and a free outlet. A stop cock is a valve with a suitable
means of connection for insertion in a pipe line for controlling or stopping the flow.
57.2 They shall be of screw down type and or brass chromium plated and of diameter as specified in the
description of the item. They shall conform to I.S. 781-1990 and they shall be of best Indian make.
They shall be polished bright.
57.3 The minimum finished weight of bib cock and stop shall be as given below--
Dia. Bib Cock Stop Cock Dia. Bib Cock Stop Cock
M-58 GUN METAL WHEEL VALVE :
58-1 The gun metal wheel valve shall be of approved quality. These shall be of gun metal fitted with wheel and
shall be of gate valve opening full way and of the size as specified. These shall conform to I.S. 778-1990.
M-59 WHITE GLAZED PORCELAIN WASH BASIN :
59.1 Wash basin shall be of white porcelain first quality best Indian make and it shall conform to I.S. 2556-(Part-
IV)-1994 and I.S. 771-1990. The size of the wash basin shall be as specified in the item. The wash basin
shall be of one piece construction with continued over-flow arrangements. All internal angles shall be
designed so as to facilitate cleaning. Wash basin shall have single tap hole or two holes as specified.
Each basin shall have a circular waste hole which is either rebated or bevelled internally with 65 mm. dia. at
top and 10 mm. depth to suit the waste fitting. The necessary stud slot to receive the bracket on the under
side of the basin shall be provided. Basin shall have an internal soap holder recess which shall fully drain
59.2 White glazed pedestal of the quality and colour as that of the basin shall be provided where specified in the
item. It shall be completely recessed at the back for reception of supply and water pipe. It shall be capable
of supporting the basin rigidly and adequately and shall be so designed as to make the height form the floor
to top of the rim of basin 750 mm. to 800 mm. as directed.
M-60 EUROPEAN TYPE WATER COLSET/WITH LOW LEVEL FLUSHING :
60.1 The European type water closet shall be white glazed conforming to I.S. 2556-1994 and I.S. 771-1692.
60.2 `S' trap shall be provided as required with water seal not leal not less than 50 mm.
The solid plastic seat and cover shall be of the best Indian make conforming to I.S. 2548-1996. They shall
be made of moulded synthetic materials which shall be tough and hard with high resistance to solvents
and shall be free from blisters and other surface defects and shall have chromium plated brass hinges and
rubber butter of suitable size.
M-61 ORISSA TYPE WATER CLOSED :
61.1 The specification of Orissa type white glazed water closet of first quality shall conform to I.S. 2556 (Part-III)
1994 and relevant specification of Indian type water closet except that pan will be with the integral
squarring pan of size 580 mm x 440 mm. with raised footrest.
M-62 INDIAN TYPE WATER CLOSET :
The Indian type white glazed water closet of first class quality, size as specified in the item and
conforming to I.S. 771-1979 and I.S. 2556-(Part-II)-1994. Each pan shall have integral flushing ring of
suitable type with adequate number of holes all around as directed to have satisfactory flushing. It shall
also have an inlet at back of front for connecting flush pipe as directed. The inside of the bottom of the pan
shall have sufficient slope from the front towards the outlet and the surface shall be uniform and
smooth. Pan shall be provided with 100 mm. diameter `P' or `S' trap with approximately 50 mm. water seal
and 50 mm. diameter vent horn.
A pair of white glazed earthen ware rectangular foot rests of minimum size 250 mm. x 130 mm. x 20 mm.
shall be provided with the water closet.
M-63 GLAZED EARTHEN WARE SINK :
The glazed earthenware sink shall be of specified size, colour and quality. The sink shall conform to I.S.
771- Part-II-1992. The brackets for sinks shall conform to I.S. 775-1990.
The pipes shall conform to I.S. 1239-Part-I-1990 and I.S. 404-1993 for steel and lead pipes respectively.
32 mm. brass waste coupling of standard pattern with brass chain and rubber plug shall be provided with
M-64 GLAZED EARTHEN WARE LIPPED TYPE FLAT BACK URINAL/CORNER TYPE URINAL:
The lipped type urinal shall be flat back or corner type as specified in the item and shall conform to I.S.
771-1992. It shall be of best Indian make and size as specified and approved by the Engineer-in-charge.
The flat back or corner type urinal must be of first class quality, free from any defects, cracks etc.
M-65 LOW LEVEL ENAMEL FLUSHING TANK:
65.1 The low level enamal flushing tank shall be of 15 litres capacity. It shall conform to I.S. 774-1990. The
flushing cistern shall be of best quality and free from any defects. The flushing tank shall have outlet
mm diameter. The outlet shall be connected with W.C. Pan by lead pipe of P.V.C. pipe as specified. The
flushing tank shall be provided with inlet and outlet for fixing G.I. inlet pipes and over flow pi+pes. The
flushing cistern shall be provided with chromium plated handle for flushing. The flushing tank shall be
provided with bracket of cast iron so that it can be fixed on wall at specified height. The brackets shall
conform to I.S. 775-1990.
M-66 CAST IRON FLUSHING CISTERN :
66.1 The cast iron flushing cistern shall be of 15 litres capacity. It shall conform to I.S. 774-1990. The
flushing cistern shall be of best quality free from any defects.
66.2 The flushing cistern shall have outlet of 32 mm diameter. The outlet shall be connected to lead pipe of
32 mm diameter. The lead pipe shall conform to I.S. 404 (Part-I) 1993. For fixing G.I. inlet pipes and
overflow pipe 20 mm dia. inlet and outlet shall be provided. The flushing cistern shall be provided with
galvanised iron chain and pull of sufficient length and shall be got approved from the Engineer-in-charge.
The cast iron flushing cistern shall be painted with one coat of anticorrosive paint and two coats of paints.
The flushing cistern shall be fixed on to C.I. brackets. The brackets shall conform to I.S. 775-1990.
M-67 FLUSH COCK :
Half turn flush cock (heavy weight) shall be of gun metal chromium plated of diameter as specified in the
description of the item. The flush cock shall conform to relevant Indian Standards.
M-68 CAST IRON PIPES AND FITTINGS :
68.1 All soil, waste, vent and antisyphonage pipes and fittings shall conform to I.S. 1729-1991. The pipes shall
have spigot and socket ends with head on spigot end. The pipes and fittings shall be true to shape,
smooth, cylindrical their inner and outer surfaces being as nearly as practicable concentric. They shall
be sound and nicely cast and shall be free from cracks, laps, pin holes or other imperfections and shall be
neatly dressed and carefully fettled.
68.2 The end of pipes and fittings shall be reasonably square to their axis.
68.3 The sand cast iron pipes shall be of the diameter as specified in the description and shall be in length of
1.5 M., 1.8 M. & 2.0 M. including socket ends of the pipe unless shorter length are either specified or
required at junction etc. The pipes and fittings shall be supplied without ears unless specified or directed
68.4 Tolerances : The standard weights and thickness of pipes shall be as shown in the table below. A
tolerance upto minus 10% may however be allowed against these standard weights.
Sr. No. Nominal dia of Overall Thick Wight of pipe excluding ears
bore 1.5 m long 1.m long 2 m long
A tolerance upto minus 15% in thickness and 20 mm. in length will be allowed. For fittings tolerance in
lengths shall be plus 25 mm. and minus 10 mm.
The thickness of fittings and their socket and spigot dimensions shall conform to the thickness and
dimensions specified for the corresponding sizes of straight pipes. The tolerance in weights and thickness
shall be the same as for straight pipes.
M-68-A P.V.C. Pipes & Fittings:-
1. All soil, waste and vent pipes & fittings shall conform to I.S. 4985-1988 & I.S. 13592:1992. The pipes are
provided with an integral rubber ring type socket at one end while the other end in kept plain, smooth & free
from burrs. The pipes and fittings shall be true to shape,smooth & cylidical. They shall be free from
crackes,laps,pinholes or other imporfection and shall be nearly dressed and carefully fettled.
2. The P.V.C. Pipes shall be of the diameter as specified in the description and shall be in length of 6.0,3.0 &
m including socket ends of the pipe unless shorter lenght are either specified or required at junction etc.
Tolerances on specified length shall be + 10 mm and- 0 mm.
3. Rubber real rings for joints and Access Doors shall be manufactured in accordance with IS: 5382-1998. There
are made out or natural rubber with a shore 'A' hardness of 40+5.
4.1 The mean outside diameter, outside diameter at any point and wall thickness manufactured plain or with
socket shall be as shown in the following table:-
* All dimensions in millimeters.
Sr. No. Nomian/Outside dia Mean outside Diamter Outside diameter at Wall whtick
Min. Max. Min. Max. Min. Max
4.2 Minimum Wall thickness of sockets on pipes & Dimensions of sliding socket of pipes shall be as shown in
following table.
* All dimensions in millimeters.
Sr. No. Nominal Minimum wall thick of sockets Socet Depth Mean inaide diamete of societ at mil point
outside on pipes. min.
diameter S2, Min S3, Min Min Max
* The outside diameter of pipe shall be obtained by the method given in IS: 12235(Part-1)-1998, wall thickness
shall be measured by the method given in IS:12235(Part-2)1998.
4.3 The permissible variation between the mean outside diameter & the nominal outside diameter of a pipe
shall be positive in the form + x, where is less than or equal to greater of the following two values.
a) 0.03 mm, and
b) 0.003 x nominal outside diameter- rounded off to the next higher 0.1 mm.
4.4 The permissible variation between the outside diameter at any point (d1) & the nominal outside diameter
(de)of a pipe shall not exceed the greater of the following two values.
b) 0.012 de rounde off to the next higher
4.5 The thickness of fittings and their socket & spigot dimensions shall conform to the thickness and dimensions
specified for the corresponding sizes of straight pipes.
M-69 NAHNI TRAP :
Nahni trap shall be of cast iron and shall be sound and free from porosity or other defects which affect
servicability. The thickness of the base metal shall not be less than 6.5 mm. The surface shall be smooth
and free form crack, chips and other flaws or any other kind of defects which affect serviceability. The
size of nahni trap shall be as specified and shall be of self cleansing design.
The nahni trap shall be of quality approved by the Engineer- in-charge and shall generally conform to the
relevant Indian Standards.
The nahni trap provided shall be with deep seal, minimum 50 mm. except at places where trap with deep
seal can not be accommdated. The cover shall be cast iron. Perforated cover shall be provided on the
trap of appropriate size.
M-70 GULLY TRAP :
Gully trap shall conform to I.S. 651-1992. It shall be sound, free from defects such as fire cracks or hair
cracks. The glaze of the traps shall be free from crazing. They shall give a sharp clear note when struck
with light hammer. There shall be no broken blisters.
The size of the gully trap shall be as specified in the item.
Each gully trap shall have one C.I. grating of square size corresponding to the dimensions, of inlet of gully
trap. It will also have a water tight C.I. cover with frame inside dimensions 300mm. x 300mm. the cover
weighing not less than 4,53 Kg. and the frame not less than 2.72 Kg. The grating cover and frame shall be
of sound and good casting and shall have truly square machined seating faces.
M-71 GLAZED STONE WARE PIPE AND FITTINGS :
The pipes and fittings shall be of best quality as approved by the Engineer-in-charge. The pipe shall be of
best quality manufactured from stone-ware of fire clay, salt glazed thoroughly burnt throught the whole
thickness, of a close even texture, free from air blows, fire blisters, cracks and other imperfections,
which affect the serviceability. The inner and outer surfaces shall be smooth and perfectly glazed. The
pipe shall be capable to withstand pressure of 1.5 m. lead without showing signs of leakage. The thickness
of the wall shall not be less than (1/12)th of the internal dia. The depth of socket shall not be less than
mm. The socket shall be sufficiently large to allow a joint of 6 mm. around the pipe. The pipes shall
generally conform to revelant I.S. 651-1992.
M-72 WALL PEG SAIL :
72.1 The aluminium wall peg rail shall have three aluminium pegs of approved quality and size. It shall be fixed
on teakwood plank of size 450 mm x 75 mm x 20 mm. The teak wood shall be french polished or oil painted
M-73 G.I. WATER SPOUT :
73.1 The G.I. pipes of 40 mm dia shall be of medium quality and specials shall be of `R' brand or equivalent
brand of best quality.
73.2 The pipe shall have length as required for the thickness of well in which it is fixed, and at the outside end
tee and bend cut at half the length shall be provided and at either end coupling shall be provided and the
have better fixing. The water spout shall be provided as per detailed drawings or as directed.
M-74 ASBESTOS CEMENT PIPE (A.C. PIPE) :
74.1 The asbestos cement pipe of diameter as specified in the description of the item shall conform to I.S.
1926-1980. Special like bends, shoes cowls, etc. shall conform to relevant Indian Standards. The interior
of pipe shall have a smooth finish, regular, surface and regular internal diameter. The tolerance in all
dimensions shall be as per I.S. 1926-Part-I-1980.
M-75 CRYDON BALL VALVE :
Ball valve of screwed type including polythene float and necessary lever etc. shall be of the size as
mentioned in the description of item and shall conform to I.S. 1703-1989.
M-76 BITUMEN FELT FOR WATER PROOFING AND DAMP PROOFING :
76.1 Bitumen felt shall be on the fibre bases and shall be of type 2, self finished felt grade-2 and shall confor to
M-77 SELECTED EARTH :
77.1 The selected earth shall be that obtained from excavated material or shall have to be brought from
outside as indicated in the item. If item does not indicate anything, the selected earth shall have to be
brought from outside.
77.2 The selected earth shall be good yellow soil and shall be got approved from the Engineer-in-charge. In no
case black cotton soil or similar expansive and shrinkable soil shall be used. It shall be clean and free from
all rubbish and perishable materials, stones or brick bats. The clods shall be broken to a size of 50 mm. or
less. Contractor shall make his own arrangements at his own costs for land for borrowing selected
earth. The stacking of materials shall be done as directed by the Engineer-in-charge in such a way as not to
interfere with any constructional activities and in proper stacks.
77.3 When excavated material is to be used, only selected stuff got approved from the Engineer-in-charge shall
be used. It shall be stacked separately and shall comply with all the requirements of selected earth
mentioned above.
EXECUTIVE ENGINEER,
SOUTH EAST ZONE (LIMBAYAT
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
12.0 GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS
1. In the specification "as directed"/"Approved" shall be taken to mean "as directed"/approved by the
Engineer-in-charge.
2. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
3. In "Mode of Measurement" in the specification wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular point or aspects in the
relevant Indian Standards shall be refered to.
4. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
( i) Length, width and depth (height ..... 0.01 Mt.
( ii) Areas ..... 0.01 Sq.Mt.
(iii) Cubic Contents ..... 0.01 Cu.Mt.
In recording dimensions of work.
The sequence of length, width and height (depth) or thickness shall be followed.
5. The distance which constitutes lead shall be determined along the shortest partical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
6. Where no lead is specified, it shall mean "all leads".
7. Lift shall be measured from plinth level.
8. Definite particulars covered in the items of work, though not mentioned or elucidated in its
specifications shall be deemed to be included therein.
9. Reference to specifications of materials as made in the detailed specification the items of works is
in the form of a designation containing the number of the specification of the material and perfix
10. Approval of the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
11. The contract rate of the item of work shall be for the work completed in all respects .
12. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
13. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall
be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter and
to ensure the preservation of their quality and fitness for the work.
14. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
15. No materials shall be stored prior to, during and after execution of a structure in such a way as to
cause or lead to damage on overloading of the various components of the structure.
16. All work shall be carried out in a workmanlike manner as per the best techniques for the particular
17. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
18. The mode procedure and manner of, execution shall be such that it does not cause damage or over-
londing of the various components of the structure during execution of after completion of the
19. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides swatisfactory evidence
that such special mode of construction is safe, sound and helps in speedy construction and
completion of work to the required strength and quality. Acceptance of the same by the Engineer-
in-charge shall not, however, absolve the contractor of the responsibility of any adverse effects
and consequences of adopting the same in the course of execution of completion of the work.
20. All installations pertaining to water supply and fixtures thereof as well as drainage lines and sanitary
fittings shall be deemed to be completed only after giving satisfactory tests by the Contractor.
21. The contractor shall be responsible for observing the rules and regulations imposed under the
"Minor Minerals Act", and such other laws and rules prescribed by Government from time to time.
22. All necessary safety measures and precautions (including those laid down in the various relevent
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the works
as also of the work itself.
23. The testing charges of all materials shall be borne by the Contractor.
24. Approval to any or the executed items for the work dose not in any way releive the contractor of
his responsibility for the correctness, soundness and strength of the structure as per the drawings
and specifications.
EXECUTIVE ENGINEER,
SOUTH EAST ZONE (LIMBAYAT)
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
13.0 ITEMWISE DETAILED TECHNICAL SPECIFICATIONS
White Washing with lime on wall surface to give an even shade & surface incl. throughly brooming
the surface to remove dirt, dust mortar drops & losse scales of lime wash & other foreign matter Two
1.1.0 MATERIALS
1.1.1 The clear colour shall be made from glue and boiling water. The mixture shall be suitably tinted
where required for use under coloured distemper if directed. Glue shall conform to I.S. 852-1969
(Specifications for animal glue).
1.1.2 Lime used shall be freshly brunt class `C' lime (fat lime) and white in colour conforming to I.S. 712-
1973. Water shall conform to M-1. Best quality of gum shall be used in the preparation of white wash.
Ultramarine blue or indigo shall conform to I.S. 55-1970 for points, and shall be used for preparation of
white wash. Pigments, mineral colours, not affected by lime shall be used in preparing colour wash.
1.2.0 WORKMANSHIP
1.2.1 Preparation of white wash solution - The fat lime shall be slaked at site and shall be mixed and stirred
with about five litres of water for 1 Kg. of unslaked lime to make a thin cream. This shall be allowed to
stand for a period of 24 hours and then shall be screened through a clean coarse cloth. 4 Kg. of gum
dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of ultramarine
blue (upto 3 gms. per Kg. of lime) shall also be used, the solution shall be stirred thoroughly before use.
1.2.2 Preparation of Surface - The surface shall be thoroughly cleaned of all dust, dirt, mortar droppings
and other foreign matter before white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrapers or shall be
rubbed with over burnt surkhi or brickbats. The surface shall be then broomed to remove all dust, durt and
shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed with wire
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular
patches and plastered again after raking the masonary joints properly. Such portion shall be wetted and
allowed to dry. They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes, cracks, patches etc. shall be made good with materials
similar in composition to the surface to be prepared.
1.2.3 Scaffolding - Where scaffolding is necessary it shall be erected in such a way that as far as possible no
part of scaffolding shall rest against the surface to be white or colour washed. A properly secured strong
and well tied suspended paltform ( zoola) may be used for white washing. Where ladders are used, pieces
of old gunny bags shall be tied at top and bottom to prevent scratches to the floors and walls. For white
washing of ceilings, proper stage scaffolding shall be erected where necessary.
1.2.4 Application of White/Colur Wash - On the surface so prepared the white wash shall be applied with `Moon'
brush. The first stroke of the brush shall be from top downwards,another from bottom upwards over the
first stroke and similarly one stroke from the right another from the left, over the first stroke brush before
it dries.This will form one coat. Each coat shall be allowed to dry before the next coat is applied. The
number of coats as specified in item shall be applied. It shall present a smooth and uniform finish free
from brush marks and it should not come off easily when rubbed with fingers.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the
surface cleaned.
Priming and alkali resistant treatments, scrapping of surface, washing etc. surface spoiled by smoke
& soot, removing of oil and grease spots treatment for infection with efforsence moulds, moss, fungi,
algae and litchen and patch repairs to plaster wherever done shall not be paid extra.
1.3.0 MODE OF MEASUREMENTS & PAYMENTS
1.3.1 All the works shall be measured in the decimal system as under ---
a] Dimensions shall be measured to the nearest 0.01 M.
b] Area in individual items shall be worked out to the nearest 0.01 Sq.M.
All the works shall be measured in Sq.Mts. Deductions for jambs, soffits, sills etc. for openings not
exceeding 0.5 Sq.Mts. each in area, for ends of joints, posts, beams, girders, steps etc. not exceeding
Sq.Mts. each in area and for openings exceeding 0.5 Sq.Mts. but not 3.0 Sq.Mts.each in area deductions
and additions shall be made as under.
1.3.2 No deductions shall be made for ends of joints, beams, posts etc. and openings not exceeding 0.5 Sq.Mts.
each. No additions shall be made for reveals, jambs, soffits, sills etc. of these openings not for finish
around ends of joints, beams, posts, etc.
1.3.3 Deductions of openings exceeding 0.5 Sq. Mts. but not exceeding 3 Sq.Mts. each shall be made as
follows and no additions shall be made for reveals, jambs, soffits etc. of these openings --
a] When both the faces of walls are provided with finish, deduction shall be made for one face only.
b] When each face of wall is provided with a different finish deduction shall be made for that side of frame
for door, windows etc. on which width of reveals is less than that of the other side, where width of reveals
on both faces of wall are equal, dedcution of 50% of area of opening on each face shall be made from
total area to finish.
c] When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is
equal or more than on the untreated side neither deductions nor additions to be made for reveals, jambs,
soffits, sills etc.
1.3.4 In case of area of openings exceeding 3 Sq.Mts. each, deduction shall be made for openings but
jambs, soffits, sills shall be measured.
1.3.5 No deductions shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
1.3.6 Cornices and all other features, when they are not picked out in a different finish colour shall be
girthed and included in the general area.
1.3.7 The rate shall include the cost of all materials, labour scaffolding, protective measures etc. involved in
all the operations described above.
1.3.8 The rate shall be for a unit of one Sq.Mts.
Painting two coats of enamel paint (Excluding priming coat) over previously painted wall after
removing entire surface with even shade & surface after removing dirt, dust foreign matter etc. comp.
The ready mixed primer, brushing red lead shall conform to IS 102:1972.
The thinner (linsed oil) shall conform to IS 75:1973 if for any reason, thinning is necessary in a case of ready mix
paint, the brand of thinner recommended by manufacturer shall be used.
The enamel paints shall conform to M-44 B.
Preparation of surfaces :
The surfaces before painting shall be cleaned of all rust,scale, dirt and other foreign matter sticking to it with wire
brushes, steel wool, scrapers, sand paper etc. This surface shall then be wiped finally with mineral turpentine which
shall also removed greas and perspiration of hand marks. The surface shall then be allowed to dry.
Application of primer :
After the prepartion of the surface, the priming coat shall be applied immediately. The brushing operations are to be
adjusted to the spreading capacity advised by the manufactuer of the particular primer. The paint shall be applied
evenly and smoothly by means of crossing and laying off. The crossing and laying off consists of covering the
area over with paint, brushing alternately in opposite directions, two or three times and then finally brushing lightly
in a direction at right angles to the same.In this process no brush marks shall be left after the laying off is finished.
The full process of crossing and laying will constitute one coat.
During painting, every time, after the priming coat has been worked out of the brush bristles or after the brust has
been unloaded the bristles of the brush shall be opened up striking the brush against portion of the unpainted surface
with the end of the bristles held at right angles to the surface, so that bristles thereafter will collect the correct
amount of paint when dipped again in to a paint container. The primery coat shall be allowed to dry completely before
painting is started.
No hair marks from the brush or clogging at paint puddles in the corner or panels angles of mouldings etc. shall be
left on the work.
Specials care shall be taken painting over bolts, nuts, rivets overlaps etc.
The container when not in use shall be kept close and free from air so that paint does not thickned and also shall be
kept guarded from dust.
The materials required for painting work shall obtained directly from approved manufacturers are approved dealer and
brough to the site in maker's drums, bogs etc. with seal unbroken.
All materials not in actual use shall be kept properly protected lid of containers shall be kept closed and surface of
paint in open or partially open containers covered with a thin layer of turpantine to prevent formation of skin. The
materials which have become state or flat to improper and long storage shall not be used.The paint shall be stirred
throughly in its container before puoring into and shall be continuously stirred in smaller container. No left over
paint shall be put back into stock tins. When not in use the containers shall be kept properly closed.
If for reasone, thinning is necessary, the brand of thinner recommended by the manufacturer shall be used.
The surface to be painted shall be throughly cleaned and dusted. All dust, dirt and greas shall be thoroughly
removed before painting is started. No painting on exterior or other exposed parts of the work shall be carried out
in wet, damp or otherwise unfavourable weather and all the surface shall be thoroughly dried before painting work is
Application of paint :
Brushing operations are to be adjusted to the spreading capacity advised by the manufacturer of particular paint. The
paint shall be applied evenly and smoothly be means of crossing and laying off. The crossing and laying of consists
of convering the area over with paint, brushing the surface hard for the first time over and than brushing alternately
in opposite directions to or three times and then finally brushing lightly in direction at right angles to the same. In
this process no brush marks shall be left after the laying off is finished. The full process of crossing and laying off
will constitute one coat.
Each coat shall be allowed to dry completely and lightly rubbed with every fine grade of sand paper and loose
particles brushed off before next coat is applied. Each coat shall vary slightly in the shade and shall be get approved
from Engineer-in-charge before next coat is started.
Each coat except the last cost shall be lightly rubbed down with sand paper or fine pumicestone and cleaned of dust
before the next coat is applied. No hairmarks from the brush or clogging of paint puddles in the corners of panels,
angles of moulding etc. shall be left on the work.
Specials care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved quality brushes shall be
Mode of measurement and payment :
The new steel and other metal surface shall be measured under this item.
All the work shall be measured net in the decimal system as executed subject to the following limits unless
otherwise statted hereinafter.
(a) Dismensions shall be measured to the nearest 0.01 mtr.
(b) Areas shall be worked cut to the nearest 0.01 sq.metre.
No. deductions shall be made for openings not exceeding 0.5 sq.metre each and no addition shall be made for
painting to beadings mouldings, edges, jambs, soffits, sills etc.of such openings.
In case of fabricated structural steel and iron work,priming coat of paint shall be included with fabrication. In cash of
trusses if measured in sq.m. compound griders,stanchions,lattices, girder and similar work, actual area shall be
measured in sq.m.and no extra shall be paid for painting on bolts, heads, nuts, washers, etc. No addition shall be
made to the weight calculated for the purpose of measurements of steel and iron works for paint applied on shop or at
The different surfaces shall be grouped into one general item. Areas of uneven surface being converted into
equivalent paint areas in accord ances with the table given as per Annexure-II for payment.
The rate is for complete item as specified i.e. one primer coat and two coats of oil paint.
The rate shall be for a unit of one sq.meter.
Equivalent plain Area of a uneven surface (Vide specifications for item relevent to paint and polishing)
Sr. Description of work How measured Multiplying factor
1. Pannled or framed and braced of ledged Measured flat (not girthed) 1.30 For each side)
and battened or ledged and braced including chowkhat or frame.
joinery cleats etc. shall be deemed to be Edges, chocks,
cluded in the item.
2. Flush jounery Measured flat (not girthed) 1.20 For each side)
including chowkhat or frame,
Edges, Chocks, cleats, etc. shall be
deemed to be included in the item.
4. Fully glazed hauzed joinery Measured flat (not girthed) 0.80 For each side)
including chowkhat or frame,
cleats, etc.shall be deemed to be
included in the item.
4. Partly panelled and partly glazed of or Measured flat (not girthed) 1.0 For each side)
glazed journey. including chowkhat or frame etc.
shall be deemed cleats, Edges,
chocks to be included in the item.
5. Full Ventilationed or or louzered jonery. Measured flat (not girthed) 1.0 For each side)
including chowkhat or cleats etc.
shall be deemed to be included in
6. Weather boarding Measurement flat (not girthed) 1.2 For each side)
supporting frame work shall not be
measured separately.
7. Wood Shingle roofing Measurement flat (not girthed) 1.0 For each side)
8. Boarding with cover fillets and match Measurement flat (not girthed) 1.05 For each side)
9. Tile & slate work one way or two way Measurement flat over all no 0.08 For each side)
deduction shall be made painting
for open spaces. supporting over)
members shall not be measured
10. Trellies ( or Jafri ) work one way or two Measured flat over all no 1.00 for painting cover
way for the open spaces deduction shall be madesupporting
members shall not be measured
11. Guard bars balustrades, rades, gates Measured flat over all No 1.00 for painting cover
gratings, grills, expanded metal and deduction shall be made for open
railings spaces, supporting members shall
not be measured separately.
12. Gates and open palisade fencing Measurement flar over all No 1.00 for painting cover
including standards. deductions shall made for open
spaces.supporting
members shall not be measured
13. Curved or enriched work Measured flat over all no no 2.0 (For each side)
deductions shall be made for open
supporting members shall not be
measured separately
14 Steel roller shutters. Measured flat (size of opening) 1.10(for each side)
over all, jamb guides, bottom rails
and locking arrangement etc. shall
be included in the item (top cover
shall be measured seperately).
15. Plaing sheet steel door and windows) Measured flat (not girthed) 1.10(for each side)
including frame
16. Fully glazed or gauzed steel door & Measured flat (not 0.60(for each side)
windows. girthed)including frame edges etc.
17. Partly panelled and partly glazed or Measured flat (not girthed) 0.80(for each side)
gauzed steel doors including frame edges etc.
18. Collapsible gate Measured flat (size of opening No 1.0 for painting all over
separate measurements shall be
taken for the top and bottom guide
rails, rolls, fittings etc.
Note : The height shall be taken from the bottom of the lowest rail if the palisades do not go below it (or from the
lowerened of palisades, if they protect below the lowest rail) upto the top of palisades but not upto the top of
standards if they are higher than the palisades.
ITEM NO.3 (A) :
Painting one coats (Excluding priming coat) on previously painted steel and other metal surface with
synthetic enamal paint, brushing to give an even shade including cleaning the surface of all dirt, dust
and other foreign matter.
For every subsequent coat Extra over item no.above
Details specification same as per Item No. 2 and paint specification and as directed by Engineer-in-charge.
Painting two coat (excluding priming coat) on new steel and other metal surface with synthetic enemal
paint, burshing to give an even shade including cleaning the surface of all dirt, dust and other foreign
Details specification same as per Item No. 2 and paint specification and as directed by Engineer-in-charge.
Painting two coats of enamel paint over priming coat (including priming coat) on wall after removing
entire surface dirt, dust foreign matter & also incl. preparing the surface even & sand papered
smooth etc.comp.
Details specification same as per Item No. 2 and paint specification and as directed by Engineer-in-charge.
Applying priming coat over new steel and other metal surface after over and including preparing the
surface by throughly cleaning oil, grease dirt and other foreign matter and scoured with brushed fine
steel wool, scrapers and sand paper with ready mixed priming paint brushing red lead.
Details specification same as per Item No. 2 and paint specification and as directed by Engineer-in-charge.
EXECUTIVE ENGINEER,
SOUTH EAST ZONE (LIMBAYAT)
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
• I, the undersigned, do hereby certify that all the statements made in the required attachments are ture and
correct. I also understand that in case of wrongful/false information, corporation is entitled to take any civil
& criminal punitive action against me / us.
• The undersigned also hereby certifies that neither our firm M/s____________________
nor any of its constituent partners have abandoned any work in India nor any contract awarded to us has
been rescinded during last five years, prior to the date of this bid.
• The undersigned hereby authorize(s) and request(s) any bank, person, authorities, government or public
limited institutions, firm or corporation to urnish pertinent information deemed necessary and requested by
the SMC to verify our statements of our competence and general requtation etc.
• The undersigned understands and agrees that further qualifying information may be requested, and
agrees to furnish any such information at the request of the SMC.
• The SMC and its authorized representatives are hereby authorized to conduct any inquiries or investigations
to verify the statements, documents, and information submitted in connection with this bid and to seek
clarification from our bankers and clients regarding any financial and technical aspects. This Affidavit will also
serve as authorization to any individual or authorized representative to any institution referred to in the
supporting informantion, to provide such information deemed necessary and requested by representative of
Surat Municipal Corporation to verify statements and information provided in the Tender or with regard to
the resources, experience and competence of the Applicant.
Signed by the Authorize signatory of the firm
Title of the office
Name of the firm
Note:- The affidavit format as indicated above to be furnished on non-judical stamp paper of Rs.300 and duly
UNDER TAKING BY THE TENDERER FOR NOT BLACK LISTED ON RS. 300/-GOVERNMENT STAMP
oath that ……….........................................................……………… (Name of Tenderer) has not been black
listed by any Government/Semi Government/Public Sector Undertaking/Public limited and not has been
banned/suspended business dealings with the said firm.
The information given above is true to the best of my knowledge.
I/We agree that if any notice in future, my/our bid/tender shall be rejected/terminated.
SIGNATURE AND SEAL OF THE CONTRACTOR:
NAME AND ADDRESS:
ADDITIONAL INSTRUCTION TO TEDERER
1- Below document must submit in hard copy and Soft copy.
All necessary documents mentioned in Technical bid (if any).
Tender Fees prescribed format.
Earnest Money Deposit as mentioned in the tender. (i.e. D.D.)
Affidavit on non-Judicial stamp paper of Rs.300/- as per Annexure-A.
Under taking by the tenderer for Annexure-E not black listed on Rs.300/- government
Addenda Corrigendum (if any) duly signed by Contractor.
2- All nessassary document submit in soft copy only.(Online)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Work No 11 Technical bid.pdf
colour work 2026 27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .