| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bid accepted | |
| 2 | L2₹11.5 L+₹30,735.48 (2.75%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest rejected |
Tender Value
₹12.6 L
EMD Value
₹37,700
Closing Date
9 Feb 2022, 6:00 pmClosed
Assistant Engineer, L I D E Wing, Engandiyur
O/o the Assistant Engineer, L I D and E Wing, Engandiyur G P -680615
Road Re-tarring
2022_LSGD_470428_1
03/ET-04/AE/LIDEW/EGYR/2021-22
Open Tender
Civil Works - Roads
Item Rate
240 days
Engandiyur Grama Panchayath - Ward 9
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹37,700
Yes
31 Mar 2022
27 Jan 2022
11 Feb 2022
28 Jan 2022
9 Feb 2022
28 Jan 2022
Amount
RETARRING MORD
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
75.8.1.1.A : Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.,including supplying and stacking of materials.
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa : Plastic roads- Packed Bitumen Rate <br> 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder -<br> Bitumen S-65 - Packed Bitumen and Shredded Plastic<br> <br> Providing, laying and rolling of opengraded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, using HM Plant attached with open pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, then transferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2 mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hot bitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rolling with a. three wheel 80-100 kN static roller capacity, finished to required level and grades to be- followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 <br> Case - I By Manual Means <br> <br> (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65),including supplying and stacking of materials.
od1403480/2021_2022 : Providing and fixing metal name board of size 75cm X 60cm
K R ARUNLAL
Bidder Name
C.V.RAJESH
K R ARUNLAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_674304.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .