| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance M C ROAD ANGAMALY ERNAKULAM | ANGAMALY | ERNAKULAM | KERALA | ₹17.0 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | Andhyodaya L1 |
|---|---|---|---|---|
| 1.00APPENDIX-A | ||||
| 1.01Grey water management (DEWATS) | ||||
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.All kinds of soil | 22.48 | m3 | 300 ₹6,743.4 Lowest |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost
of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse
sand : 6 graded stone aggregate 20 mm nominal size) | 1.64 | m3 | 7,500 ₹12,285 Lowest |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size) | 11.27 | m3 | 9,800 ₹1,10,406.8 Lowest |
| 1.05 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 1,126.6 | kg | 115 ₹1,29,559 Lowest |
| 1.06 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc | 42.87 | m2 | 500 ₹21,435 Lowest |
| 1.07 | Excavating trenches of required width for pipes, cables, etc., including excavation for
sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not
exceeding 3m, including getting out the excavated soil, and then returning the soil as
required, in layers not exceeding 20cm in depth, including consolidating each
deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as
directed, within a lead of 50m, in all kinds of soil. | 15 | m3 | 700 ₹10,500 Lowest |
| 1.08 | Supply of PVC Pipe, 8kg/cm2, 32mm Dia. | 30 | m | 45 ₹1,350 Lowest |
| 1.09 | Supply of PVC Pipe, 10kg/cm2, 40mm Dia | 30 | m | 60 ₹1,800 Lowest |
Tender Value
₹17.8 L
EMD Value
₹44,417
Closing Date
17 Aug 2026, 6:00 pmClosed
Regional Project Director
2nd Floor, Bldg.No.3/253, Near AKG Hospital, Talap, Kannur
Grey Water Management Project for pre metric hostel panamaram for boys and girls in Panamaram GP- NOVA with DEWATS in Wayanad District
2026_KRWSA_864728_1
KRWSA/286/2025-2026/RE1
Open Tender
Civil Works - Water Works
Item Rate
180 days
Panamaram Grama Panchayath
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,500
₹44,417
14 Sept 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
7 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX-A | |||||
| 1.01 | Grey water management (DEWATS) | - | - | - | - |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.All kinds of soil | 22.48 | m3 | 215.37 | ₹4,841.09 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost
of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse
sand : 6 graded stone aggregate 20 mm nominal size) | 1.64 | m3 | 7,413.74 | ₹12,143.71 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size) | 11.27 | m3 | 11,022.69 | ₹1,24,181.63 |
| 1.05 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 1,126.6 | kg | 98.92 | ₹1,11,443.27 |
| 1.06 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc | 42.87 | m2 | 721.7 | ₹30,939.28 |
| 1.07 | Excavating trenches of required width for pipes, cables, etc., including excavation for
sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not
exceeding 3m, including getting out the excavated soil, and then returning the soil as
required, in layers not exceeding 20cm in depth, including consolidating each
deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as
directed, within a lead of 50m, in all kinds of soil. | 15 | m3 | 666.07 | ₹9,991.05 |
| 1.08 | Supply of PVC Pipe, 8kg/cm2, 32mm Dia. | 30 | m | 33.2 | ₹996 |
| 1.09 | Supply of PVC Pipe, 10kg/cm2, 40mm Dia | 30 | m | 61.15 | ₹1,834.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1463101.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.05 MB
BOQ_1463101.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .