Loading…
Loading…
Tender ID
Tender Value
₹7.1 L
EMD Value
₹8,000
Closing Date
18 Feb 2026, 6:00 pmClosed
Office of Deputy Executive Engineer, Irrigation Sub Division, Mahuva
Rojki Irrigation Scheme : Rejuvenation of Diverted Rojki near Thorala Village of Taluka Mahuva, Dist. Bhavnagar
271726
SBD 4 of 2025-26
Open
Civil Works - Water Works
Works
Bhavnagar
10 documents required · 9 mandatory · 1 optional
₹900
Yes
Deputy Executive Engineer, Irrigation Sub Division, Mahuva
₹8,000
Yes
31 Jan 2026
31 Jan 2026
31 Jan 2026
18 Feb 2026
31 Jan 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description Of Item Quantity Unit Rate in Amount
1 Jungle clearance (Ganda Baval etc)
of Light/heavy dence (work done by
manually or by machinery) including
grabbing of & removing the roots &
girth completely from the ground &
back fill with earth & making surface
good as directed including
depositing & removing the material
away from the site of work at own
risk and cost as and where directed
etc completed for following.
B) Heavy Density
2 Clearing the silt from canal/drain
bed by didding the same to the
required bed level and gradient
including depositing the excavated
earth regularly on spoil bank for
utilizing the 1 same fro preparing the 1905.00 Cum 166.00
bund after bracking the clods as and
where directed for lead upto 30 mt
and lift as under. (Excluding weed
(A) Depth 0 to 3.0 mt
3 Providing of high-quality photography
and Drone videography services for
documentation of work progress at
specified intervals during the
execution period and submission of
copiled documentation.
I/We am/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
i.e. RS. 5449.00/MT mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Sub Division Bhavnagar Irrigation Project Division
Mahuva Bhavnagar
Signature of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Rejuvenation of Diverted Rojki near Thorala Village.pdf
BOQ Rejuvenation of Diverted Rojki.pdf
Tender Notice 4 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .