| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹8.2 LAccepted-AOC | 1st | Accepted-AOC Lowest | |
| 2 | 2nd₹8.3 L+₹9,104.22 (1.11%)Accepted-AOC | 2nd | Accepted-AOC 2nd lowest | |
| 3 | 3rd₹8.3 L+₹9,986.42 (1.21%)Accepted-AOC | 3rd | Accepted-AOC Highest |
Tender Value
Refer Docs
EMD Value
₹22,500
Closing Date
30 Jan 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Head Works Sub Division, Peechi
PSM-Improvement works to canal bund e LBMC between ch.14-000 to 14-120 KM
2021_Irrig_408130_1
79/AEE/2020-21
Open Tender
Civil Works - Canal
Item Rate
120 days
Mannamangalam
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,800
₹22,500
7 Jun 2021
22 Jan 2021
4 Feb 2021
22 Jan 2021
30 Jan 2021
22 Jan 2021
Amount
Scheme 1 from ch:14/000 to 14/120Km
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site
PAUL P.P
Bidder Name
PAUL P.P
JERRY PAUL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_580077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .