Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.1 Craccepted-aoc | ₹1.1 Cr | accepted-aoc |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
2 Jun 2026, 3:30 pmClosed
CMD,ADCL
Rayapudi , Amaravati
Shifting and erection of 33KV Overhead lines in E13 extension road and National Highway-16 junction including dismantling of existing lines and poles obstructing road development works in Amaravati Capital City
935814
06/CE/ADCL/Engg/2026-27/01 Dt.16.05.2026
OPEN - NCB
Electrical Works
GUNTUR
17 documents required · 13 mandatory · 4 optional
₹4,465
₹1.3 L
17 Jun 2026
19 May 2026
19 May 2026
Supply, transportation and erection of 12.5 m Spun Pole with working load of 350 kg conforming to IS 1678-1998 and REC specification with latest amendments thereof, in position, aligning and setting to work as per specification, back filling the earth, ramming for consolidation, including cost, conveyance, T&P and labour charges for loading, unloading etc., complete, but excluding pit excavation. [Makes: As per approved makes of APCPDCL]
Excavation of pits in all soils, i.e, mixture of gravel and soft disintegrated rock like shales ordinary gravel, stony earth and earth mixed with fair sized boulders for 12.5 m Spun Poles (2'6"x2'6"x7' or 0.75 m x 0.75 m x 2.1 m) including T&P and labour charges etc., complete.
Supply, and erection of 9.1 m PSCC pole (280 kg) conforming to IS 1678-1998 and REC specification with latest amendments thereof, in position, aligning and setting to work as per specification, back filling the earth, ramming for consolidation, including cost, conveyance, T&P and labour charges for loading, unloading etc., complete. [Makes: As per approved makes of APCPDCL]
Excavation of pits for 9.1 m PSCC Poles 2'x2'x5' or (0.6 m X 0.6 m X 1.5 m) in all soils, i.e, mixture of gravel and soft disintegrated rock like shales ordinary gravel, stony earth and earth mixed with fair sized boulders.
Supply, and erection of M+12 type GI heavy structure tower as per ASCI specifications with minimum weight of WT 4 MT and founadtion Pit dimensions of 1.2X1.2X3.3 Mts. i.e. 4.752CUM as per drawing including earthwork excavaion and foundation of Tower as directed by Engineer-In-Charge.
Supply, paving, stringing & jumpering, testing and commissioning of 55 Sq.mm AAA Conductor conforming to REC specification and IS-398 Part-IV 1994 with latest amendments thereof, including fixing of suitable rollers, bamboos, paving out conductor on suitable supports, providing temporary stays, tensioning, sagging correctly, fixing at strain point, transporting to pin points, binding, rectification of poles, guys and jumpering of various Conductors including cost of conductor, transporting of materials and T&P from road side to location including loading and unloading and providing watch and ward till the lines are handed over to APCPDCL etc., complete for finished item of work. (Make: As per APCPDCL approved make).
Supply, paving, stringing & jumpering, testing and commissioning of 100 Sq.mm AAA Conductor conforming to REC specification and IS-398 Part-IV 1994 with latest amendments thereof, including fixing of suitable rollers, bamboos, paving out conductor on suitable supports, providing temporary stays, tensioning, sagging correctly, fixing at strain point, transporting to pin points, binding, rectification of poles, guys and jumpering of various Conductors including cost of conductor, transporting of materials and T&P from road side to location including loading and unloading and providing watch and ward till the lines are handed over to APCPDCL etc., complete for finished item of work. (Make: As per APCPDCL approved make).
Supply and erection 33KV PIN INSULATORS (Polymer) with GI pin including all accessories as directed by Engineer-In-Charge
Supply and erection 33KV 70KN COMPOSITE POLYMER INSULATOR including all accessories as directed by Engineer-In-Charge
Supply and fixing of 11 kV Polymer Pin Insulator with GI Pin including labour charges etc., complete as per APCPDCL standards.
Supply and fixing of 11 kV Polymer Disc insulator (C&T) and Fittings (C&T Type metal parts) including labour charges etc., complete as per APCPDCL standards.
Supply and fixing of 11 kV Tapping Channel Cross arm with 100x50MM MS Channel for 9.1 including labour charges etc., complete as per APCPDCL standards.
Supply and laying of 25mm x 6mm GI Flat (1.18Kgs/1Mtr) size Earth wire/Strip in horizontal /Vertical run in Ground/surface/Recess including, riveting, soldering, saddles, making connection etc as required
Supply and laying of CI EARTH PIPE 80 MM DIA 2.5MTS LENGTH including all accessories as directed by Engineer-In-Charge
Supply and fixing of MS BOLTS & NUTS 5/8 X 9" including labour charges etc., complete as per APCPDCL standards.
Supply and fixing of MS BOLTS & NUTS 5/8 X 6" including labour charges etc., complete as per APCPDCL standards.
Supply and fixing of MS BOLTS & NUTS 5/8 X 8" including labour charges etc., complete as per APCPDCL standards.
Supply and laying of MS FLAT 75X8 including all accessories as directed by Engineer-In-Charge
Supply and laying of MS Channel 100X50 including all accessories as directed by Engineer-In-Charge
Supply and laying of MS ANGLE 65X65X6 including all accessories as directed by Engineer-In-Charge
Providing concrete for pole pit for 12.50 M/350 Kg Spun Pole (Pole pit size 0.6 X 0.6 X 2.0M) with C.C.(1:3:6) using 20 mm and 12mm HBG metal as directed by the Engineer-In-Charge.
Providing concrete for pole pit for 9.1 M/280 Kg PSCC Pole (Pole pit size 0.6 X 0.6 X 1.5 M) with C.C.(1:3:6) using 20 mm and 12mm HBG metal as directed by the Engineer-In-Charge.
Supply of 33KV XLPE CABLE 3 CORE 400 SQ. MM, complete as per APCPDCL standards.
Supply and making straight thoughof 33KV XLPE CABLE JOINTING KIT 3X400SQMM with heat shrinkable cable jointing kits. cost includes all costs of labour, testing, transportation of all materials work spot, loading and unloading complete as per APCPDCL standards.
Paving out and laying of 33KV KV UG cable duly forming the cable trench including excavation of trench 2’X2’ filling the trench with excavated earth including transporting of cable etc. complete without construction of trench. / Laying of copper control cables buried in trench or ground and termination including all accessories as directed by Engineer-In-Charge
Providing 300mm dia digging boaring technique method for laying of 33kV 3 core 400 Sqmm cable including all accessories as directed by Engineer-In-Charge
Supply of HDPE pipe suitable for laying of 3 core 33kV 400 Sqmm cable using 300mm dia digging boaring techniq method including all accessories as directed by Engineer-In-Charge
Dismantelling of all the accessories of Overhad line along the E13 Road extension and handing of dismantelled material to the section office of APCPDCL or as directed by the Engineer-In-Charge.
Supply and erection of 33KV 800A CONV. AB SWITCH WITH S.C.I including all accessories as directed by Engineer-In-Charge
Supply, fabrication and fixing MS Pipe for Post, Rafter & Purlinng including all accessories as directed by Engineer-In-Charge
Supply and making 33kV 400 Sqmm XLPE cable termination kit including all accessories as directed by Engineer-In-Charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
E13 Road Extension Tender BOQ.xlsx
TENDER_DOCUMENT • 0.09 MB
NIT-549.doc
TENDER_DOCUMENT • 0.09 MB
PART-II.doc
TENDER_DOCUMENT • 0.03 MB
Tender Schedule-549.doc
TENDER_DOCUMENT • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .