Loading…
Loading…
Tender Value
₹18.2 L
EMD Value
₹36,442
Closing Date
12 Jun 2026, 11:00 am6d left
THE REGIONAL MANAGER WBSEDCL
ROOM NO 501 5TH FLOOR DOOARSKANYA ALIPURDUAR-736122
Renovation of Staff Quarter at the premises of Birpara CCC under Alipurduar Division
2026_WBSED_1024968_1
RM/ARO/Civil/eTender/26-27/18
Open Tender
Miscellaneous Services
90 days
BIRPARA CCC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹36,442
28 May 2026
28 May 2026
15 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Civil Works: | ||||||
| 1.01 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 100 | SQM | 10.1 | ₹1,010 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof. | 190 | SQM | 50.5 | ₹9,595 | BI01010001010000000000000515BI0100001114 |
| 1.03 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is
not permitted with ordinary cement).
Using grey cement (i) 20 mm. thick | 225 | SQM | 239.37 | ₹53,858.25 | BI01010001010000000000000515BI0100001115 |
| 1.04 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. | 30 | CUM | 5,302.5 | ₹1,59,075 | BI01010001010000000000000515BI0100001116 |
| 1.05 | Providing waterproofing treatment over concrete roof surface (old or new) by the application of two coats of slurry prepared with latex of approved brand, with brushs and the two layers of Water Proofinng of approved Brand which is SIKA 109 (Approx Consumption : SikaTop®Seal 109 hi: 1st coat = 1.00 kg/m2, 2nd coat = 1.50 kg/m2.)
Note: The consumption will vary depending on application area, substrate type, substrate roughness, surface profile, absorption of the surface and thickness required. Ambient air temperature +10 C min. / +40 C max. Mixing ratio Part A : Part B = 1 : 1.5 (by weight) Substrate temperature +10 C min. / +40 C max. Pot life ~40 minutes (100 g mass, +27 C) | 550 | KG | 177.32 | ₹97,526 | BI01010001010000000000000515BI0100001117 |
| 1.06 | Providing one coat of anti-corrosive and water proofing paint supersilver shield (STP Ltd.) @0.125 ltr/ sqm composed of oxidised bitumen and aluminium powder in volatile solvent over APP membrane afer making and removing dust to the satisfaction of the E.I.C. | 320 | SQM | 41.66 | ₹13,331.2 | BI01010001010000000000000515BI0100001118 |
| 1.07 | Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage,complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse) | 320 | SQM | 411.07 | ₹1,31,542.4 | BI01010001010000000000000515BI0100001119 |
| 1.08 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 50 | SQM | 90.9 | ₹4,545 | BI01010001010000000000000515BI0100001120 |
| 1.09 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | 50 | SQM | 789.82 | ₹39,491 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2518722.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid