Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC work done successfully | |
| 2 | Rejected-Technical | - | Rejected-Technical higher quoted bid | |
| 3 | Rejected-Technical | - | Rejected-Technical High quoted bid |
Tender Value
₹6.3 L
EMD Value
₹9,500
Closing Date
8 Jun 2026, 9:00 amClosed
ACE Govindpur area
Gm office, Bilbera sonardih
Renovating stone masonary wall near Hanuman Nagar NHS qtr back side office under Govindpur Area
2026_BCCL_360469_1
BCCL/AR III/GM/ACE/E-NIT/26-27/25/ 1004-1029
Open Tender
Civil Works - Others
Percentage
28 days
Govindpur area
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,500
13 Oct 2026
30 May 2026
10 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
30 May 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil work | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means infoundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), includingdressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out theexcavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soi | 56.7 | m3 | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of
centering and shuttering - All work up to plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stoneaggregate 40 mm nominal size derived from natural sources). | 6.3 | m3 | 1 | ₹6.29 |
| 4 | Random rubble masonary with auarry stone in foundation and plinth level with cement mortar 1:6 (1 cement : 6 coarse sand)in cluding carriage and through and bond stone size in standard size | 132.3 | m3 | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost ofcentering and shuttering - All work up to plinth level1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stoneaggregate 20 mm nominal size derived from natural sources | 3.15 | m3 | 1 | ₹3.15 |
| 6 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand):flush/ruled pointing | 220.5 | m2 | - | - |
| 16 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_373337.xls
BOQ • 0.29 MB
RectificationTendervalues.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .