Loading…
Loading…
Tender Value
₹44.7 L
EMD Value
₹45,000
Closing Date
9 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Surat Canal Division, Surat
Improvement of Existing Lining works on 4R sub Minor Betn 400mt to 1765mt & 4R-A Sub Minor betn 1162mt to 1372 mt Ex 4R Sub Minor Ex Chalthan Br.
289771
NIT-24 of 2025-26
Open
Civil - All
Surat
15 documents required · 9 mandatory · 6 optional
₹1,500
Yes
Executive Engineer, Surat Canal Division, Surat
₹45,000
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where
applicable, and otherwise at such rates and prices as the Engineer may fix within the terms
of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or
price shall be deemed to be covered by other rates and prices entered in the Bill of
Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related items
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : Improvement of Existing Lining works on 4R sub Minor Betn
400mt to 1765mt & 4R-A Sub Minor betn 1162mt to 1372 mt Ex 4R
Sub Minor Ex Chalthan Br.
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Description of Item (with brief
specification and reference to book of Quantity Unit Amount
specifications)
Clearing the borrow area including thin
1 jungle cutting and removing trees up to 0.5 1.93 Ha 2887.99
m girth, bushes, shrubs etc. complete
Dismantling the existing Brick Masonry
including sorting out and stacking the useful
2 materials and removing the debries and 29.00 Cum 757.40
making good the damage etc. complete as
directed.(b) in cement mortar.
Dismentaling the existing R.C.C.pipes of the
following diameter including sorting out and
stacking of the useful materials including
refilling the trenches etc. complete as
directed.(NP.2 pipes)( c)650 mm to 900 mm
Removing of exiting disturbed C.C. Block
lining including opening of oints, stacking
the same and disposing of stuff as directed
etc. complete with all leads and lifts.
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft
and hard murrum etc. dry condition
5 including depositing the excavated stuff in 238.00 Cum 81.50
uniform layers in banks or as directed etc.
complete for lead up to 1.0 km and lift.( By
machinery)( a ) Above water table
Earthwork in embankment using selected
soil,soft & hard murrum excavated from
approved borrow area / village tanks etc
6 including breaking clods , dressing to the 4235.00 Cum 82.20
design section with lead up to
Kilometer and all lifts. (By poclane
Compaction of selected soil/ hardmurrum/
soft murrum in even thickness of 15 to
cms including watering rolling of suitable
capacity etc. complete as directed.
Providing and laying Plain/Reinforced
cement concrete of cement,sand and metal
(20mm to 25mm size) in following
proportion laid in situ including centering,
shuttering, temping, smooth finishing, curing
etc. complete as directed for all leads and
lifts (Manually With Conventional Mixer)(iv)
9 Providing & placing in position
reinforcement bars including cutting,
bending , welding joints where necessary 29.00 Qtl 7194.00
hooking etc. complete as per drawing for
all leads & lifts b) TMT
10 Providing and laying plain / Reinforced
cement concrete lining of M-15 grade in
bed, side slope and curveture including
batching mixing transporting, placing, 7461.00 sqm
smooth finishing, curing including
dewatering where required (machinery
based without paver)
11 Providing and Filling Asphalt of the
approved make and sand in the expansion
and contraction joints in the c.c.lining 2491.00 Rmt. 68.03
including clearing the joints with air water
12 Providing and fixing in position (different
diameter) NP2 R.C.C pipe with collar
including filling and caulking the joints with
cement mortar 1:1 proportion, finishing,
curing etc. complete for all lead and lifts. g)
NP2 class 900mm dia pipe.
13 Providing and fixing position M.S. Plainbars
of 16 mm dia. Round bar as a leader in Kundi 36.00 Nos 130.10
including Painting etc. complete.(For Step)
14 Providing and fixing Steel Grill over canal
syphon well as directed etc. complete. As per 130.00 Kg 63.76
15 Manufacture, supply and erection of vertical
gate consisting gate leaf, stiffeners, rubber
seal, embended parts as shown irr. Drawings
including cost of material, fabrication,
painting, erection in position wwith all
accessories second stage concreting etc.
complete as per drawing and specifications.
Rupees Fourty Four Lakh Seventy Four Thousand Two Hundred Ninety Seven Paise Sixty Eight Only
I/We am/are willing to carry out the work at .......................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Surat Canal Sub Division No.2 Surat Canal Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ final- 4R Chikhali PSM.pdf
SBD-final- 4R Chikhali PSM.pdf
Download all tender documents and submit your bid