Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NIL | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical CUTTACK CUTTACK ODISHA | PURI | ODISHA | 752120 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical CUTTACK CUTTACK ODISHA | PURI | ODISHA | 752120 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AT BADAMANGA PO KALASPUR DIST KENDRAPARA PIN 754239 | KENDRAPARA | ODISHA | 754239 | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
16 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CCE Kendujhar (R and B) Circle
O/o the CCE Kendujhar (R and B) Circle, Kendujhar-758001
Improvement to place of Safety Near Special Jail (Building) (Repair and Renovation of 300 Capacity Additional Ward) for the year 2026-27.
2026_EICCL_144642_1
CCEKC - 10/ 2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
Raurkela
4 documents required · 4 mandatory
₹10,000
₹2.5 L
Yes
17 Nov 2026
29 Oct 2026
17 Nov 2026
29 Oct 2026
16 Nov 2026
29 Oct 2026
29 Oct 2026 - 13 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS (PART-I)
Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead with all labour T&P etc complete including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 629.39 | sqm | 58.95 | ₹37,102.54 |
| 2 | b) 1st Floor Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead with all labour T&P etc complete including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 152.46 | sqm | 61.9 | ₹9,437.27 |
| 3 | c) 2nd Floor Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead with all labour T&P etc complete including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 108.11 | sqm | 64.99 | ₹7,026.07 |
| 4 | Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand )(using branded cement) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves or beads where ever necessary, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tools and plants etc. complete as per the direction of the Engineer-in-charge.
a) Ground Floor | 1,114.66 | sqm | 190.02 | ₹2,11,807.69 |
| 5 | b) 1st Floor Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand )(using branded cement) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves or beads where ever necessary, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tool | 156.06 | sqm | 194.79 | ₹30,398.93 |
| 6 | c) 2nd Floor Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand )(using branded cement) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves or beads where ever necessary, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tool | 104.21 | sqm | 199.7 | ₹20,810.74 |
| 7 | d) 3rd Floor Providing 12 mm thick cement mortar 1:6 (1 cement : 6 sand )(using branded cement) to outside surface / plumbed surface of masonry, raking out joints, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumb and levels and providing grooves or beads where ever necessary, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering. curing, sundries, tool | 307.2 | sqm | 204.75 | ₹62,899.2 |
| 8 | Providing fitting and fixing up partition walling aluminum anodized section No.9210 and 9207 as single groove and double groove respectively, as horizontal and vertical member and section 4660 as Tapered clip and jointing angle No.1855 including all cost of labour,T&P, hire charges of drilling machine,labour charges ,making good to all damages in walls and floors etc. including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, sundries, tools and plants etc. Excluding cost of laminated board complete as per the direction of the Engineer-in-charge.
a) Ground Floor | 534.4 | sqm | 4,180.06 | ₹22,33,824.06 |
| 9 | Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 9,534.23 | sqm | 5.12 | ₹48,815.26 |
| 10 | b) 1st Floor Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 2,946.63 | sqm | 5.12 | ₹15,086.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.50 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_616562.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .