Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38 L
Closing Date
16 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Division RnB Division Ganderbal
Executive Engineer Division RnB Division Ganderbal
Construction of Shed including PCC Flooring (Solid Waste Management Plant at Hakim Gund).
2021_PWDJK_143278_2
NIT NO.175/2021-22
Open Tender
Civil Works
Item Rate
30 days
Ganderbal
As per NIT
2 documents required · 2 mandatory
₹1,100
Yes
Executive Engineer Division RnB Division Ganderbal
Exempted
16 Oct 2021
11 Oct 2021
16 Oct 2021
11 Oct 2021
16 Oct 2021
11 Oct 2021
120 days
Amount
Earth work in excavation in all kinds of soil by mechanical /manual means in trenches for foundation, etc., up to required width and depth including necessary ramming of bottom and dressing of sides, Close timbering, clearing of vegetation and mulba and disposal of excavated material as directed incl. all leads, lifts, carriages,incl. Dewatering, diversion of nallah water and Providing of necessary coffar dam complete as per the directions of Engineer Incharge.
P/L, of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete incl. dewatering.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to floor V-level in 1:4:8 (1 cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all complete incl. dewatering.
P/L, in position reinforced cement concrete M20 of specified grade excluding the cost of centering & shuttering. finishing and reinforcement 1:1.5:3 in Raft Foundation, Abutments, pedestal ,beam etc (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size Crushed all complete. incl. Dewatering, diversion of nallah water and Providing of necessary coffar dam complete as per the directions of Engineer Incharge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m incl. dewatering complete.
Reinforcement for RCC work including straightening ,cutting ,bending, placing in position and binding all complete (Thermo Mechanically treated bars) with all leads, lifts, cost and carriage complete. (Incl cost of tar steel complete. Tar steel shall be provided from Divisional Store on existing stock rates. Incl. Dewatering, diversion of nallah water and Providing of necessary coffar dam complete as per the directions of Engineer Incharge.
Structural Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works as per the directions of Engineer Incharge..
Structural Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers incld Painting Complete.
50mm thick cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size nallah) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc complete Incl. Dewatering, diversion of nallah water and Providing of necessary coffar dam complete as per the directions of Engineer Incharge.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. size)1:2:4 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) Incl. Dewatering, diversion of nallah water and Providing of necessary coffar dam complete as per the directions of Engineer Incharge.
Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) Incl. Dewatering, complete.
12mm thick cement plaster in 1:6 mix (1 cement 6 sand) incl. Dewatering complete.
Providing corrugated G.S sheet roofing vertical/curved surface fixed with, bolts and nuts 8mm dia. With bitumen and G.I limpet washers or with G.I limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete( upto a pitch of 60 degree ) excluding the cost of Purlins, rafters and trusses.0.50mm thick with zinc coating.
Providing ridges or hips of width 60cm over all width colour coated G.S sheets fixed with polymer coated J or L hooks, bolts and nuts 8mm dia G.I limpet and bitumen washers complete 0.63mm thick sheet with zinc coating not less than 275g/sqm..
Supply, and laying of GSB/ nallah Muck including sorting, spreading to template, watering and call inclusive leads, lifts, loading, unloading carriage of materials from nearest source to site of work complete. Finished work to be measured.
Supply and Filling of dry stone soling duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete incl. dewatering.
Centering and shuttering incld. strutting ,propping etc. and removal of form work in foundation ,footings, Entry Ramp etc, incl. carriage complete.
Carriage of materials by mechaanical transport from source to site of work incl. loading and unloading complete.
Sand for an average lead of 20 Kms
Bricks for an average lead of 60 Kms
SHEIKH BUILDERS
M/S SOFI BUILDERS
ADNAN CONSTRUCTIONS
FAHEEM TARIQ
M/S QAZI CONSTRUCTIONS AND CO
SHEIKH CONSTRUCTIONS
M/S AJAZ AHAMD SHAH
PARRAY CONSTRUCTIONS
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .