| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.1 LAdmitted-Finance | -37.86% | ₹46.1 L | L1 | Admitted-Finance |
| 2 | L2₹54.4 L+₹8.3 L (18.1%)Admitted-Finance 106 NEHRU NAGAR ROORKEE DISTRICT HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -26.62% | ₹54.4 L+₹8.3 L (18.1%) | L2 | Admitted-Finance |
| 3 | L3₹67.3 L+₹21.2 L (46.0%)Admitted-Finance H NO 716 A 3 STREET BEHARI GANJ AJMER RAJASTHAN 305 001 | -9.30% | ₹67.3 L+₹21.2 L (46.0%) | L3 | Admitted-Finance |
Tender Value
₹74.2 L
EMD Value
₹1.8 L
Closing Date
7 Jul 2026, 5:00 pmClosed
General Manager(Jal)
Water Works Compound, Sector-5, Noida
Internal Development of Various Water Compound (Beautification and maintenance of UGR/OHT Compound Sec-100) Noida
2026_NOIDA_1163204_1
23/SM(JAL)-II/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
Noida
Please refer to Tender Form/Document
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.8 L
24 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40mm dia. M.S. tube 1.5m centre to centre horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 2,669 | sqm | 151.57 | ₹4,04,540.33 |
| 2 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work. | 4,176.7 | sqm | 123.39 | ₹5,15,363.01 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and samplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 6,344.58 | sqm | 3.1 | ₹19,668.2 |
| 4 | Earth work in Embankment in Ordinary soil Embankment to be in 20cm layers including ramming Dressing the Surface to requiredlevels with Half tonne steel or Wooden rammer and Rolling Every third and top most layers in Roller 8 to 10 tonne Capacity and Including 1.50 mtr Lift and all lead ( earth shall be Brought From a place which including Cartage to Earth by Mecanical transport and T & P labour Etc, Required for Proper Complition Earth shall br Arranged by the Contractor at his Own Cost. | 338.31 | Cum | 363.05 | ₹1,22,823.45 |
| 5 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 96.66 | Cum | 4,093.5 | ₹3,95,677.71 |
| 6 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent designn mix) | 89.18 | Cum | 923.42 | ₹82,350.6 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size). | 217.52 | Cum | 5,746.88 | ₹12,50,061.34 |
| 8 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ ecoverable separately). | 211.4 | Cum | 8,141.83 | ₹17,21,182.86 |
| 9 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 386.9 | sqm | 20.47 | ₹7,919.84 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 10.0 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 117.71 | Cum | 5,214.8 | ₹6,13,834.11 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Cap23.xls
Additional Documents • 0.05 MB
TD23.pdf
Tender Documents • 2.12 MB
BOQ_2180562.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .