| 1 | L1₹2.0 CrAccepted-AOC NALAKATH HUB AREECODE MALAPPURAM 673639 | MALAPPURAM | KERALA | 673639 | ₹2.0 Cr | L1 | Accepted-AOC work awarded |
| Sl No | Description | Qty | Unit | NALAKATH INFRASTRUCTURE LLP L1 |
|---|---|---|---|---|
| 1.00Civil Building Works | ||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 378 | sqm | 31 ₹11,718 Lowest |
| 1.00 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 31.85 | cum | 1,382 ₹44,013.94 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.54 | cum | 323 ₹1,143.42 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 23.39 | cum | 7,406 ₹1,73,263.37 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 18.88 | sqm | 364 ₹6,873.78 Lowest |
| 1.01 | OD381891/2025-2026:60.7.8
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 18.57 | cum | 3,794 ₹70,469.76 Lowest |
| 1.01 | OD381914/2025-2026:60.7.9
RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 3.67 | cum | 7,830 ₹28,736.1 Lowest |
| 1.01 | OD381962/2025-2026:Modified 60.7.9
RR with Departmental. Stone - Random rubble masonry using departmental rubble above plinth level and upto floor five level including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 64.44 | cum | 9,660 ₹6,22,471.08 Lowest |
| 1.01 | OD259100/2025-2026:Providing and anchoring 12 mm dia rebar in rock (150mm depth in rock and 200mm depth in concrete ) using chemical anchoring compound (RE100) of approved quality and make, including the cost of all materials, labour, and related charges complete. | 124 | each | 504 ₹62,496 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Feb 2026, 6:00 pmClosed
Managing Director
IMPACT Kerala Ltd, TVPM
Construction of Modern Gas Crematorium in Koorachund GP
2025_IKL_823781_2
IKL/CTM/2025/14
Open Tender
Civil Works - Buildings
Item Rate
365 days
Koorachund GP
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,510
₹50,000
14 Aug 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Building Works | |||||
| 1.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 1.002 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 1 | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.006 | OD381891/2025-2026:60.7.8
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.007 | OD381914/2025-2026:60.7.9
RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 1 | cum | - | - |
| 1.008 | OD381962/2025-2026:Modified 60.7.9
RR with Departmental. Stone - Random rubble masonry using departmental rubble above plinth level and upto floor five level including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 0.2 | cum | - | - |
| 1.009 | OD259100/2025-2026:Providing and anchoring 12 mm dia rebar in rock (150mm depth in rock and 200mm depth in concrete ) using chemical anchoring compound (RE100) of approved quality and make, including the cost of all materials, labour, and related charges complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1399048.xls
BOQ • 0.64 MB
PaymentDeclaration.pdf
Other Document • 0.24 MB
Koorachund_dwg.pdf
Additional Documents • 8.39 MB
RetenderKoorachundGPGCSBD.pdf
Tender Documents • 1.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .