Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
27 Jul 2026, 5:00 pm
SE TNC SAWAI MADHOPUR
SE TNC SAWAI MADHOPUR
Construction work of LILO of EXISTING 132 KV SC KEKRI-SAWAR LINE AT 132 KV GSS NASIRDA
2026_RRVPN_571961_1
3110002606
Open Tender
Supply, Erection and Commissioning
SE TNC SAWAI MADHOPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
AO TNC SAWAI MADHOPUR
₹5.2 L
Yes
SE TNC SAWAI MADHOPUR
1 Jul 2026
1 Jul 2026
28 Jul 2026
1 Jul 2026
27 Jul 2026
1 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Details Survey as per tenrative route Which includes the following majar activities-
Pegging of line route, providing of servey pillar at an interval of 3-4 Km in the line route with required jungle clearance for survey, Profile preparation of approved route on graph sheet and marking of offset on eighter side of line, marking of side clearance for hills, sand dunes etc. as per specification and tower scheduling. | - | Km | 11,983 | - |
| 1.02 | Check survey as per approved route of line which includes -
Rechecking of the line route as per approved profil. Chainage tower centre marking, pit marking bisection of angle tower as requrred at site. | - | Km | 4,454 | - |
| 1.03 | Identification of Land and Preparation of Land compensation Case -
The Land Identification and compensation case shall be prepared completely by the contractor during item No.2 (Check Survey of BOQ (Service) of NIB) as per GoR notification No. F.12 (31) Energy/2024-02647 dated 05.11.2024 & Gazette Notification dated 08.11.2024 and its further amendments dated 23.07.2025 titled as "Policy for payment for in regard to Right of Way for transmission line Rajasthan" land identification for compensation of RoW"
i. Identify Landowners and issue notice to proceed
ii. Collect documents (e.g. proof of identity and ownership)
iii Verify land records with revenue maps / officials (by revenue officials)
iv Measure tower footing/corridor area in the presence of landowners and revenue officials(by TSP) | 0.58 | Sq M | 2.22 | ₹1.29 |
| 1.04 | Documentation of Preparation of case for land compensation as per issued vide Gazette notification No. F.12(31) Energy/2024-02647 dated 05.11.2024 & Gazette Notification dated 08.11.2024 and its further amendments dated 23.07.2025 after collecting applicable DLC rate for disbursement of land compensation to land owners.
i In case of grievances relating to land rates, DM to issue orders on land rates:
ii. Land Use compensation Amount ROW: Calculation sheet based on the DLC and/ or Rate Determination by DM and land measurement of
various land owners based on measurement sheet
iii Disburse the Payment and receipt from Land Owner
iv Any other misc. work related to Land acquisition or preparing documents related thereof. | 0.58 | Sq M | 0.25 | ₹0.15 |
| 1.05 | Excavation
Excavation excluding back filling, including shoring, shuttering, dewatering etc. uptothe required depath as per foundation specification / drawing.
(i) Any Soil, soft rock other than hard rock | - | Cum | 536 | - |
| 1.06 | Excavation
Excavation excluding back filling, including shoring, shuttering, dewatering etc. uptothe required depath as per foundation specification / drawing.
(ii)Hard rock (with blasting subject to permission or without blasting) | - | Cum | 1,737 | - |
| 1.07 | Setting of Template & Stub / Anchor Bolt
Setting of template & stub / Anchor bolt & removal after concreting excluding cost of excavation and concretingbut including back filling with excavated / borrowed earth (with lead & lift) in layers withramming and watering as per specification
(i) Towers including extension upto 9Meters | - | MT | 23,712 | - |
| 1.08 | CONCRETING:
Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand stone aggregate 20 mm nominal size, water etc. preparing surface, shuttering mixing, placing, ramming, curing, finishing as per specification and drawing.
(ii) 1:3:6 Mix | - | Cum | 11,666 | - |
| 1.09 | Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand stone aggregate 20 mm nominal size, water etc. preparing surface, shuttering mixing, placing, ramming, curing, finishing as per specification and drawing.
(iv) 1:1.5:3 Mix | - | Cum | 14,663 | - |
| 1.1 | Steel Rainforcement
Cutting, Bending, Welding of joints if required fixing and Placing of steel rainforcement as per specification and drawing including material. | - | MT | 84,157 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TN05LINE.pdf
Tender Documents • 32.50 MB
BOQ_1017741.xls
BOQ • 0.23 MB
NIB05corrigendum.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid