Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
12 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Dismantling and Removal of Shell, Bottom Plate, Assosiated Structures and platforms, Pipelines and Brick Lining of Decommissioned Intermediate Absorption Tower and Pump Tank in SA Plant,FACT-CD
2025_FACT_866384_1
04097/2025-2026/E31713
Limited
Miscellaneous Works
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
14 Jul 2025
27 Jun 2025
14 Jul 2025
27 Jun 2025
12 Jul 2025
27 Jun 2025
Dismantling and Removal of Shell, Bottom Plate, Assosiated Structures & platforms, Pipelines and Brick Lining of Decommissioned Intermediate Absorption Tower and Pump Tank in SA Plant, FACT-CD.
Dismantling of IAT & Pumptank in SAP Work Involves: Make required arrangements for the work. Arrange scaffolding inside the tower for removal of bricks. Chip and remove the entire inside brick lining of shell & bottom plate of IAT, pillars and entire brick lining of pump tank. Tie Beams and Grillage beams inside IAT shall also be removed with at most care so that the same can be re used. The Tie Beam & Grillage bricks shall be transported and kept at a secure place as per the instruction form Engineer -in Charge . The chipped and removed bricks shall be collected and transported to scrap yard . Removal of brick lining shall be as per site instructions only. Cut and dismantle part by part entire shell, structural platforms, stairways, bottom plates, Pump tank and platforms, any CI/SS/MS pipelines and ducts in association with decommissioned IAT and pump tank. Removal of Rhepanol lining from the plates is also in the contractor's scope. Cutting and dismantling shall be executed as per the instructions from site in charge. Bottom plate shall be cleared completely from the foundation. Any pipelines (CI/SS/MS) in connection with the IAT shall be dismantled as per instructions. Any temporary support required for dismantling shall be done by the contractor. The dismantled plates/structures/pipes etc. shall be transported to the scrapyard after weighing. Site shall be cleared after work and any left-over scrap shall be shifted to scrap yard. All the work shall be done as per the instructions from Engineer- in-charge.
AMMA CONSTRUCTION CORPORATION (BID ID -3247273)
M A Shamsudeen (BID ID -3245791)
HASSAN MM (BID ID -3246631)
stage.html
html • 0.02 MB
finance_910816.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .