Loading…
Loading…
Tender Value
₹76.5 L
EMD Value
₹1.5 L
Closing Date
3 Jul 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
PR UMB
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited; the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender As detailed in Para 10.1 of Tender Form (Second sheet) of Part 1 of attached GCC April 2022 with all correction slips up to date.
Definition of similar nature of work: Any work which includes work: "Design, Supply, Erection, Testing and Commissioning of Railway SCADA as per RDSO Spec no. TI/SPC/RCC/SCADA/0130(Rev-2) with A&C Slip no- 01 and latest amendments or, any SCADA system consisting of a Master Station (comprising of one or more Pentium based computers) and involving minimum 10 nos. of RTU's with each RTU being PC / Microprocessor based, remotely located and in unmanned condition.
25 conditions · 9 needing a document upload
The tenderer shall submit all relevant documents as detailed in para 14 & 18.10 of Tender Form (Second Sheet) of Part I of Attached GCC April-2022 with all correction slips up to date.
A copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. The standard format of the certificate to be submitted by the bidder is enclosed as Annexure-V. In addition to Annexure-V, in case of than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LPP) etc. as the case may be. Non-submission of above certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self-attested/ digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document.
The bid security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee Bond from a scheduled commercial bank of India. Necessary guidelines on submission of Bid Security may be followed from Standard General Condition of Contract clause no 5 attached as tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderers are required to observe the website to find out if any correction slips issued subsequent to uploading of the Tender. Railway reserves the right to make any additions/alterations to the tender uploaded and issue corrigendum to the same effect. Incase the tenderer fails to take note of the above corrigendum, the additions and alterations entered/effected in the corrigendum shall be binding upon the tenderer and no claim what so ever will be entertained by Railway.
No manual tenders sent by post/Fax/courier or in person shall be accepted
No post tender correspondence shall be entertained after closing of tender even suo moto post tender letters of the tenderers shall be treated as null/void.
Indian Railways Standard General Conditions of contract 2022 corrected up to date of closing of tender and the attached documents are part of the tender document
Tender shall be dealt with latest GCC April, 2022 of Indian Railway with its amendment & tender document. In case of any difference between provisions of GCC -April,2022 with its amendment and any condition contained in this tender document, the provisions of GCC -April'2022 with its amendment will prevail, unless stated otherwise.
For more details the instruction to tenderers and all other details available in the documents attached with tender may be referred to.
Work of data telemetry integration of 09 Nos newly constructed TSS in EPC-08 contract in FZR and UMB division of Northern Railway.
NR-Proj-UMB-SCADA-T1
NR-Proj-UMB-SCADA-T1
Open
Works - General
6 Months
Ambala, Haryana
₹0
₹1.5 L
3 Jul 2026
15 Jun 2026
19 Jun 2026
4 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Integration of the energy data of a TSS from RCC to SEMC | — | 9.00 | — | — | |
| Integration of the energy data of a TSS from SEMC to SLDC. | — | 9.00 | — | — | |
| Communication set up from ABT meter installed in the yard to RTU End consisting of the supply, installation & commissioning of Fibre Optical Cable, Power Cable, converter, Patch Cords, LIU etc. | — | 9.00 | — | — | |
| Supply, erection and commissioning of DLMS to MODBUS converter. | — | 9.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentsforSCADAIntegration.pdf Tender Document
ATTACHMENT
GCC April 2022
ATTACHMENT
ACS-1GCC-2022Policy14_07_2022.pdf
ATTACHMENT
April2022ACSNo_2.pdf
ATTACHMENT
ACS3 of GCC 2022
ATTACHMENT
ACS4 of GCC 2022
ATTACHMENT
ACS5 of GCC 2022
ATTACHMENT
ACS6 of GCC 2022
ATTACHMENT
Amendment-7GCCofApr-2022.pdf
ATTACHMENT
Amendment8.pdf
ATTACHMENT
Amendment-9GCCofApr-2022.pdf
ATTACHMENT
ACS10GCCApril2022.pdf
ATTACHMENT
Clarification for Annexure V
ATTACHMENT
Annexure-VVA.pdf
ATTACHMENT
TenderDocumentsforSCADAIntegration.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
April-2022AdvanceCorrectionSlipNo_3ACS-3.pdf
ATTACHMENT
April-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
April-2022AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
April-2022AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
2022-CE-I-CT-GCCCorrespondencedated.14.05.20241.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .