Executive Engineer(Agril.),SC and WD,Southern Zone
O/o Project Director, Watersheds, Ganjam, Berhampur, Courtpeta, 760004
Construction and furnishing of newly constructed ASCO office building at Sinapalli with Boundary wall, water supply, Electrification and other peripheral development
2026_SOIL_127225_5
EE(A), SC and WD, SZ-02 of 2025-26
Open Tender
Civil Works - Others
Percentage
150 days
Sinapalli
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Project Director, Watersheds-cum-DDSC, Nuapada
₹25,892
Yes
16 Mar 2026
16 Mar 2026
26 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
Survey, Demarcation, Cleaning of bushes, Uprooting of ipomia and cutting of trees from the campus for alignment etc. complete.
Earth work excavation of foundation in Hard Soil within initial lead and lift etc. complete.
Filling Foundation and plinth with well graded sand including watering and ramming
C.C. (1:4:8) with 40mm size crusher broken granite metal in F&P etc. all complete.
Rigid & smooth centering and shuttering in foundation etc. all complete.(a) Column upto Plinth
(b) Column in Super Structure
M -20 grade R.C.C. using 20mm&down graded chips crusher broken Column base, Column & Plinth Band
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification
Fly Ash Brick work having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in F & P.
Fly Ash Brick work having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in superstructure in ground floor
15 Cm deep brick coping 23cm to 25cm thick walls including plastering (1:4) complete.
Providing 12 mm thick C.P. (1:6) on brick wall
Providing Cement washing 2 coats etc. Complete.
Finishing walls with water proofing cement paint of approved shade on new work 2 coats to give an even shade including cost of brushes and putty including cost of paint.
Iron work wrought and put up in grated doors, windows and cage latrines of Hollow GI Pipes
Priming one coat with any approved red oxide over steel work Data for 9.30sq.m
Painting 2coats with any approved iron paint on new iron work
Labourfordrillingaperfectlyverticalboreholeofspecifieddiaforaspecifieddepthbelowgroundlevelthroughconsolidatedandunconsolidatedrockwithdowntheholehammerdrillingrigsor combinationdrilling rigs (650cfm/ 200psi) as required tosuit thesiteconditionasper thedirectionofEngineer-in-charge includinguseofownrigswithitsaccessories,toolsandplantandconsumablesetcforloweringof125mmdiaPVC/GIpipesforhousingfittedwithsocketandwith orwithoutwell screenasper thenecessityforsoft,medium,hardandboulder formation(GI/PVCcasingpipes if required toprevent collapseof over burden is tobeprovidedby thecontractor including lowering and withdrawing after completion of the tube well) from 00m to 60m
Cost of 125mm dia PVC plastic Pipes Schedule -80 as per ASTM -D-1785/2004. of reputed malke specification. Manufacturer name should prominently be marked with CIPET cerficate in body of pipe in indeliable ink stenciled to the satisfaction of Engineer-in-charge.
Cost of lowering of casing pipe (200mm dia PVC pipe)
Cleaning and developing the bore well using their own compressor continuousely worked till clear and adequate discharge ois obtained from the well including supply and use of all necessary equipments and labour as per the direction of enginbeer-in-charge.
cost of 1.5 hp submersible pump 18 stage of any approved make ISI marked
Cost of HDPE column pipe( 32mm, Schedule-80)
Cost of submersible cable (2.5 sq.mm.) of ISI marked
Accessories of pump fitting (reducer, nipple, short piece, bore cover etc) upto overhead tank.
Staineless steel wire rope for suspending the pump
Cost of control panel of approved make for 1.5HP Submesrsible Pump
Installation charges for pumpset, control panel and accessories.
Transportation of all PVC pipes, Pump, accessories and fittings.
Earth Work/ Excavation in Hard Soil for Foundation Work within initial lead and lift
Filling Foundation and Plinth with sand including watering and ramming
Cement Concrete(1:4:8) using 4cm. Size H.G.Metals in foundation and Plinth
Cement concrete(1:2:4) with 12mm hard granite chips(crusher broken)
Filling Foundation and Plinth with Excavated Materials
Filling bitumen and cement and jute fibre in expansion joints inclusive of cost of materials, bitumen and cement proportion (3:1) including cleaning before pouring 12mm to 25mm and 15cm depth.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_585036.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .