Chief General Manager (Thermal)
Industrial Painting Works for various Steel Structures and Equipment of Power Plant at Village: Nani Naroli.
348070
SLPP/Civil/Industrial Structure Painting/2026
Open
Civil - Painting, Sand blasting
Fixed-rate
Surat
₹2,950
Gujarat Industries Power Company Limited
₹2.6 L
26 Sept 2026
26 Sept 2026
26 Sept 2026
16 Oct 2026
26 Sept 2026
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in
the contract according to scope of works, magnitude of the works, height of
structures, requirement of equipment, tools & tackles, MS scaffolding, safety PPEs,
making site safety arrangements, manpower, supervisors, labour, etc. Contractor
has to complete the work in accordance with the contract documents irrespective of
any defects, omissions or errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and
satisfy himself regarding matters such as access to site, communication, transport,
working condition including approaches, height of structures, quantity assessment
of individual structures, confined area, running equipment, quantum of dusting &
temperature variations at specified work locations, importance of work, round the
clock working conditions, site safety requirements, standard MS scaffolding
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
requirements, work permit system, right of way, high flood level in River, flow of
water during monsoon/dry season in the River/Nallah, the type and number of
equipment & facilities required for the satisfactory & timely completion of work, the
quantity of various items of the work, the availability of local labour, local working
conditions, uncertainties of weather, obstructions & hindrances that may arise, etc
which may affect the work or cost thereof, before submission of his Bid. Ignorance
of site conditions shall not be accepted by the GIPCL as basis for any claim for
compensation. The submission of a Bid by the BIDDER will be construed as
evidence that such an examination was made. Any later claims / disputes in regard
to rates quoted shall not be entertained or considered by the GIPCL. The rate
quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of
It is also desirable to study tender documents thoroughly before site visit. Site visit
will be carried out with advance intimation through email.
5. ELIGIBILITY CRITERIA
The following criteria will be adopted for qualifying the Bidders for consideration of
the Bid for the further proceeding.
5.1 Bidder should possess minimum Three years of experience out of last five years
ending last day of the month previous to the one in which tender is invited (as per
following Cl. No.5.2) in similar nature of Industrial Painting jobs at height on erected
steel structures in Power Plants / Process Industries / Corporation / Corporate Sectors
/ Institutes and should enclose valid acceptable evidence/proof of the same. The
Bidder should have experience of similar scope of works like structure painting work
at height on erected structure. Bidder shall submit necessary evidence for the same
like self-attested copies of work orders/Work Execution/Work Completion
certificates from clients. The work completion certificate shall comprise of Order
value & Executed value. Bidders should have executed the work directly. The work
executed as a sub-contractor or subletting agency shall not be taken in to
consideration. However, experience as a sub-contractor, except the works sublet
by painting contractor, may be allowed on sole discretion of GIPCL subject to
submission of supporting evidence/documents like copies of work orders with
relevant Invoices of completed works & verification of work performance from client
of sub-contractor.
5.2 Bidder should produce evidence of having successfully completed similar works (as
per above clause no. 5.1) as defined hereunder during last five years ending last
day of the month previous to the one in which tender is invited, or satisfactory
progress of ongoing works, etc. secured from clients by way of certified copies of
documentary evidence preferably photo copies of work experience certificates. The
experience should be either of the following:
a. One similar completed/executed work each costing not less than
b. Two similar completed/executed work each costing not less than
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
c. Three similar completed/executed work each costing not less than
Bidder should specifically mention fulfilling of above criteria in his offer along with
details of work orders & work completion certificates issued by clients.
5.3 Tender fee: The tender fee shall be submitted through RTGS or through online
payment only as per details provided in clause no. 7 hereinunder. Demand Draft
will not be accepted for Tender Fee.
5.4 EMD: The EMD shall be submitted in the form of DD/RTGS/online or irrevocable
Bank Guarantee given by Bank as described in subsequent clause no.
5.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
5.6 Attested copies of relevant documents duly signed & seal on each & every page
shall be submitted. GIPCL may verify the documents, experience certificates issued
by concerned authority. After opening of technical Bid, if any required attested
documents found missing in the Technical Bid submitted by the Bidder, the tender
inviting authority may inform to that Bidder by E-mail to submit the missing required
documents within stipulated time limit. If Bidder/Bidders fail to submit within
stipulated time, their Bid will be declared technically disqualified and no further
correspondence will be entertained.
5.7 Bidder should have average annual turnover of Rs.1,23,50,228/- during last three
financial years (average of financial years 2023-24, 2024-25 & 2025-26). Bidder
shall furnish annual audited financial statement duly certified by Chartered
Accountant for the last three financial years to demonstrate the financial healthiness
of the company. The balance Sheet and Profit & Loss Account must be in the name
of the company. Any type of MOU for this purpose will not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does
not require audit, the bidder shall submit the turnover certificate from Chartered
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN) and
GST registration number. Copies of the same shall be submitted.
5.9 The net worth of the bidder should be positive as evidenced from audited accounts
of last financial year (2025-26), audited (or where, as per extant laws of the land,
audit is not applicable, certified) by a qualified Chartered Accountant who should be
a member of the Institute of Chartered Accountants of India.
5.10 In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered /
Stopped or banned from dealing in the past by any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations, bid of that party may be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regard as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure-H in Section-F / Form attached.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” on his company letter head as amended in Annexure-
G in Section-F / Form attached.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
If any Major Violation of any safety law(s) / Rule(s) is / are found during
the preceding Three (3) years, Bid of that party will be liable to be
rejected. Bidder agrees and undertakes to accept decision of GIPCL in
this regard as final and binding on the Bidder without any demur and that
no further correspondence shall be done in this regard at any stage.
If any of the details submitted in the prescribed Annexure-G & H in
Section-F / Form to the Bid is/are found to be false, incorrect at any time
in future, then the Contract awarded to that Bidder / Contractor shall be
liable to be terminated forthwith without any notice / correspondence and
Bidder agrees and undertakes to accept decision of GIPCL in this
regards as final and binding on the Bidder without any demur and that no
further correspondence shall be done in this regard at any stage. Further,
Performance / Security Deposit will also be liable to be forfeited. Any
dues to GIPCL from the Bidder / Contractor shall be recovered from the
pending bills or any other dues payable to the Bidder / Contractor, if any
or otherwise through any other recourse available under the Laws.
The Bidder shall submit all the evidences, documents, attested copies of work
orders & work completion certificates etc… as a proof with EMD & Tender Fee and
also provide the requisite details online for meeting the prequalification
requirements. GIPCL will verify the experience, performance, capability & strength
of Bidders, independently for executing the job. GIPCL may visit the site & consult
the owner of the industry/property where similar job is executed by the Bidder.
GIPCL reserves the right to accept/cancel/reject any/all Bids without assigning any
reason thereof. The tenders of qualified Bidder/Bidders shall only be considered for
further evaluation.
6. LANGUAGE OF BID
The Bid prepared by the Bidder and all correspondence & documents relating to the
Bid exchanged by the Bidder & the Company, shall be written in the English
language. Any printed literature furnished by the Bidder, written in another language
shall be accompanied by an English translation for the purpose of interpretation of
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs.2,62,000/- (Rupees Two Lakh Sixty Two Thousand only) and
nonrefundable Tender fee of Rs.2,950/- (Rupees Two Thousand Nine Hundred Fifty
only), inclusive of applicable GST shall accompany with Bid. Tender fee shall be
submitted through RTGS / online mode of payment only.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor
of “Gujarat Industries Power Company Limited” from all Nationalized Banks or Axis
Bank, ICICI Bank, HDFC Bank, Kotak Mahindra Bank, IndusInd Bank, Federal
Bank, Bandhan Bank, IDBI Bank and Karur Vysya Bank as per Performa of BG
enclosed with this tender document under Section-F (Annexure-C).
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Alternatively, EMD & Tender Fee may also be submitted through RTGS mode of
payment by the bidders as per the details given below:-
1. BANK NAME:- State Bank of India
2. BRANCH:- Nani Naroli
3. IFSC CODE:- SBIN0013423
4. BENEFICIARY NAME: Gujarat Industries Power Company Limited
Also, EMD & Tender fee may be submitted through online payment gateway
of company’s website: www.gipcl.com (online Payment Form) as per detail
provided in Section-F (Annexure-J) herein under.
7.3 In case EMD is paid in the form of irrevocable BG, the same shall be valid for a
period of 180 days after the due date for submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of Security Deposit
or submission of irrevocable PBG by successful bidder. Alternatively, EMD will be
converted into SD and successful bidder shall submit SD or performance bank
guarantee for the balance amount.
7.5 The earnest money deposit will be refunded to the unsuccessful/disqualified
BIDDER after the tender is finalized and after award of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees
and EMD should be submitted to GIPCL.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance
or (ii) withdraws his tender before the expiry of the validity date of the tender.
7.9 SCHEDULE OF EMD, TENDER FEE & OTHER SUPPORTING DOCUMENTS
Details/receipts of EMD & Tender fee Address for Submission: -
paid by RTGS/online or EMD in physical
form by way of DD/BG (as applicable) Chief General Manager (Thermal)
with other documents duly self-attested GUJARAT INDUSTRIES POWER CO. LTD.,
are to be submitted in physical form in (Surat Lignite Power Plant)
sealed cover as per details mentioned Village: Nani Naroli, Taluka: Motamiya-
in NIT. Bid No. shall be mentioned at Mangrol, District: Surat.
the top of cover/envelope. PIN: 394 112, Gujarat.
E-Mail: [email protected]
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online through website: https://tender.nprocure.com or
https://gipcltender.nprocure.com within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
(a) Pre-qualification and Techno-commercial Bid without price.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
(a) Prequalification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of Site-in-charge.
2. Schedule of deviation (Annexure-F in Section-F) Technical as well as
commercial, if any.
3. Qualification & experience of Supervisors/Engineers (if applicable).
4. List of available equipments, vehicles, tools & tackles which are required to
perform the scope of works as specified in this tender.
The following supporting documents shall also be submitted, in physical form
along with EMD & Tender Fee:
1. The tender documents duly signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria as mentioned in
tender document.
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any).
6. Turn over for the last three years, audited annual accounts/financial
statements i.e. profit & loss account and balance sheet and net worth
certificate for last financial year duly certified by a practicing CA will be
required as specified in clause nos. 5.7 & 5.9 above.
7. P.F. Number and Allotment Letter.
9. Goods & Service tax registration number/certificate copy
10. Declaration-cum-Undertaking for Compliance of Safety Laws & Regulations
and Contractual Disputes / Litigations as per Performa Annexure-G &
Annexure-H under Section-F.
11. Bidder should submit duly filled Annexure-L provided under Section-F of
Tender document.
12. User ID for e-reverse auction on website: https://e-auction.nprocure.com
13. Vendor Registration Form (in case of first time bid participant of GIPCL’s
Tender) duly filled, signed & stamped as per separate form attached under
head of Tender Document in online NIT on (n)Procure Tender portal.
14. Bank Mandate (if not submitted earlier) duly filled, signed & stamped by bidder
and respective Bank, along with original cancelled cheque as per separate
form attached under head of Tender Document in online NIT on (n)Procure
1. Percentage Rate Price Bid shall be submitted only in soft form through new e-
tender portal of (n)Procure.
Note: Offered percentage rate (service charge) on GIPCL’s total estimated SoR
value shall include cost of all GIPCL approved makes of painting / coating
materials, primers, thinner, other required materials and standard tools &
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
tackles, standard equipment as recommended by approved manufacturers,
consumables, safe storage of materials, wastage, application on various
structures through experienced applicators/skilled workers, helpers,
labour, supervision, administration cost & overheads, safety supervisor,
shifting, transportation, loading, unloading, equipment, machinery, all
tools & tackles, standard approved MS scaffolding, scaffolding
arrangement at work site as per approval of GIPCL’s Safety Officer,
approved suspended platform for work at height, safety equipments &
PPEs, site safety arrangements, following GIPCL’s safety guidelines &
submission of safety compliance reports periodically as directed by GIPCL
safety in-charge, legal & statutory compliances, Royalties, Rents, Stamp
Duties, Central or State Government or Local body or Municipal Taxes or
Duties (including GST).
The contractor shall comply with all statutory and legal requirements, including
labour laws (minimum wages, EPF, ESI, bonus, etc… as applicable), safety
regulations, and environmental norms. All applicable taxes and duties,
including GST, are deemed included. The total estimated SoR amount is
inclusive of GST, considered at the current rate of 18%. However, GST must
be shown separately in invoices, and any change in rate shall be adjusted at
actuals upon submission of valid proof.
2. The bidder’s percentage (%) offer shall be based on the Total Estimated
Amount, inclusive of GST. However, at the time of billing, GST shall be
shown separately in the invoice, with reverse calculation as per prevailing
GST laws. The applicable GST rate shall be charged at actuals, subject to
submission of valid documentary evidence, in line with the rates notified by
the Central Government.
All legal and statutory compliances including but not limited to royalties,
rents, stamp duties, taxes, levies (Central, State, Local or Municipal) and
GST as applicable, or any other duties/taxes imposed by public bodies shall
also be deemed included.
3. Moreover, the quoted price must factor in all overheads, profit, and any other
incidental costs that may not be explicitly mentioned but are necessary for the
satisfactory, safe, and timely completion of the scope of work as per the
specifications detailed in the tender.
4. The bidder shall quote the rates in the form of a percentage (%) as follows:
“At Estimated Value” or “_____ % below the Estimated Value” or “_____ %
above the Estimated Value”.
5. The quantities indicated in the Schedule of Rates (SoR) under Section-E are
tentative and based on preliminary estimation. These quantities are
subject to variation during actual execution, depending on site conditions and
final recognition of treated area as directed by GIPCL Engineer.
The Bidder shall fill the Bid documents with utmost care in consonance with
the instructions contained in the Bid documents.
6. The quoted rate/offer shall remain firm and fixed throughout the contract
period and any extension thereof, if required, for completion of the entire
scope of work. The rates shall not be subject to any escalation or adjustment
on any account, including but not limited to increases in the cost of materials,
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
fuels, statutory levies, Minimum Wage Rates (MWR), overheads, idle charges
for labour or machinery, or any other unforeseen expenses. No escalation or
compensation shall be payable to the contractor for any such revisions or
changes during the contract period / till completion of entire scope of work.
7. The accepted / work order rates shall be firm for entire contract period and
also during extension, if required, to complete entire scope of work and shall
not be subject to any escalation in price, idle charges for labour, machinery,
overhead expenses etc.
8. There will not be any escalation/compensation to the contractor against any
revision in either MWR (Minimum Wage Rates) or revision in material prices
9. Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding category.
10. Contractor shall at his expense comply with all labour and industrial laws and
such other acts and status as may be applicable to this contract in respect to
pay etc. On account of any default in respect of all liabilities and in case of
non-compliance of the above, the company can withhold their payments till all
legal liabilities are discharged.
11. Contractor shall deploy labour/workers & supervisors in sufficient numbers to
ensure proportionate progress and quality workmanship of the degree
specified in this contract and to the satisfaction of the Company.
12. The Bidder shall fill the Bid documents with utmost care in consonance with
the instructions contained in the Bid documents.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence & place of
business of the person/persons submitting the Bid and must be signed &
sealed by the Bidder with his/her usual signature. The name of all persons
signing the documents shall also be typed or printed below the signature on
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature
and designation of one of the authorized partners or other authorized
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation / Company must be signed with the legal name of the
Corporation / Company i.e by the President / Managing Director / Secretary or
other person or persons authorized to Bid on behalf of such Corporation /
Company. A certified copy of the board resolution/power of attorney authorizing
such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission
of Bids and the expiration of the period of bid validity.
10. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means,
the Company. The Engineer, if necessary, will obtain clarifications on the Bids
by requesting for such information from any or all the Bidders, in writing as may
be necessary. The Bidder will not be permitted to change the price or substance
of the Bid after the Bid has been opened.
11. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids (including
extended period of bid submission if any).
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid.
c. The Company shall always be at liberty to reject or accept any Bid or Bids at his
sole discretion and any action will not be called into question and the Bidder
shall have no claim in that regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure
has been specified. Otherwise the tender will be opened by the authorized
officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for
sureties furnished by bidder, for authentication of documents
submitted and completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price
that is obtained by multiplying the unit price and quantity, the unit
price shall prevail and the total price will be corrected & will be
binding to the bidders.
(b) If there is a discrepancy between the Total Bid Amount and the sum
of total prices, the sum of total prices shall prevail and the Total Bid
Amount will be corrected & will be binding to the bidders.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the
lowest evaluated Bid in conformity with the specifications of the tender
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or
before the given date requested by the Company. If the Technical
clarifications sought by the Company do not reach the Company on or before
due date, the Bid will be rejected.
13.4 The comparison of all the Bids shall be carried out with reference to the scope
of work as per the technical specification. Any deviation/omission shall be
evaluated at highest quoted price of the deviation/omission quoted by any of
the Bidder. In case a separate price (for omission) is not given by any other
Bidder, a reasonable price of the same shall be taken & the same shall be
binding to the Bidders.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par.
The loading shall be carried out at an interest rate of 2% above PLR of SBI.
13.6 A Bid to be substantially responsive shall be one which on evaluation
confirms to all the terms, conditions and specifications of the Bid documents
without any material deviation or reservation.
13.7 For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of
the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the
Bid documents, GIPCL’s right or the Bidder’s obligations, under the
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding
process and reject all Bids at any time prior to award of contract, without
thereby incurring any liability to the affected Bidder or Bidders or any obligation
to inform the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non-responsive
and shall be rejected at the outset & no further correspondence shall be
entertained regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids
if such Bidder has quoted an abnormally low rate in the Bid document/price
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest
quotation in conformity with the requirements of the specifications and
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
documents contained herein, provided further that the bidder is determined
and evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his/her selection through the Letter
of Intent or Letter of Award/ Work Order which shall be sent to him/her through
e-mail, courier, fax or registered mail.
15.3 GIPCL reserves the right to cancel/short close the contract during the contract
period without assigning any reason.
15.4 GIPCL reserves the right to split the contract quantity between vendors.
16. CONTRACT PERIOD
16.1 The contract / completion period for scope of works shall be 15 (Fifteen)
months from the date of issuance of the Letter of Intent (LoI) and/or Work
Order, whichever is earlier (except 03 months of peak Monsoon, i.e. July,
August & September) as stated in the Special Conditions of Contract
(‘Contract Period’).
16.2 GIPCL reserves the right to short close the contract any time by giving one
month notice period without assigning any reason.
16.3 If given scope of work not completed during contract period due to justifiable
reasons submitted by Contractor seeking time extension and same are
acceptable to GIPCL, in such case, GIPCL reserves the right to only extend
the Contract Period appropriately at the same rates, terms and conditions
without any price escalation and without entering into any new contract on
sole discretion of GIPCL.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for
timely & satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled
manpower separately to properly complete the job in given/scheduled time.
(iii) The Contractor shall depute its own workmen/labor with proper identification to
enter the plant premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labor laws/Acts norms including but not restricted to the age of the
workers, women workers and shall also ensure that a police verification,
security check, pre-employment medical fitness check-ups & induction safety
training for all the workmen/labor engaged at the GIPCL site is done and
necessary documents regarding the same shall be submitted to the GIPCL’s
authorized representative/officer-in-charge. Any default in complying with the
same or any misrepresentation regarding compliance of the same shall compel
GIPCL to initiate appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with proper healthy safety equipments like but not limited to
safety helmets, safety belt, fall arrestors, masks, gum boots, a uniform and
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
other necessary PPEs for properly undertaking the operations involved under
this contract. Damaged, unfit and/or deteriorated safety PPEs shall be replaced
immediately with new approved standard PPE. Following are also to be issued:
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour only)
c) Safety Goggles / face shield.
d) Ear plug / Ear muff.
e) Hand gloves like electrical hand gloves / cotton hand gloves /
Chemical hand gloves.
f) Full body double harness Safety belt.
g) Fall arrestors.
(vi) Contractor shall nominate /authorize senior experienced person in writing as
site-in-charge to co-ordinate with GIPCL engineer and who shall bear overall
responsibility for performance of the contract. Such person shall remain always
available at site or site office allotted to the contractor at SLPP site. Contractor
has to submit the authority letter and documentary proof for the same.
(vii) The Contractor shall appoint package wise / location wise independent
supervisors who shall co-ordinate with concerned GIPCL’s department
Engineer-in-charge for daily entrusted job. They have to maintain daily records
duly signed for the works carried out and duly certified by Engineer-in-Charge.
The Contractor, in co-ordination with the Engineer-in-Charge, shall ensure the
availability of adequate manpower to carry out the job satisfactorily on a daily
basis. As per the instruction of Engineer-in-Charge, they have to allot the work
and execute the same in specified time limit.
(viii) During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources
accordingly. The Contractor shall responsible to carry out work as per schedule
of work planning to complete scope of work in given contract period.
(ix) During emergency or similar situations, the Contractor shall be required to
mobilize resources as per need within the period of 04 hours as directed by
GIPCL. If the contractor fails to mobilize sufficient manpower to complete the
job in time, GIPCL will execute the job through other agency at the risk and cost
of the contractor with 10% supervision charges, including GST & the same will
be recovered from the Contractor’s bill.
Important Note: Whenever any of the Unit at SLPP remains under outage
due to any reason and require emergency painting work, the contractor
shall mobilize sufficient work force at site within a period of twelve hours
from the time of intimation to the site-in-charge or via mail to your office.
Generation loss occurred due to want of manpower as well as resources
will be viewed very seriously and will invite appropriate punitive
measures as decided by competent authority.
(x) During working in high risk area like hot lines of steam/water/oil, boiler
combustor, cyclones, penthouse, etc…, the workman must wear a suitable
safety apron, safety belt, safety hand gloves & goggles. It is the contractor’s/his
supervisor’s responsibilities to ensure it without fail.
(xi) During unit overhauling, the contractor has to enhance the site manpower as
per the requirement to ensure the timely completion of work (During overhauling
period quantum of work increases substantially). For this, enhanced work shall
be completed by deploying additional manpower with supervisor as per site
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
necessity. Payment will be made on item rate basis only under respective
section. The work during the overhauling period is to be carried out round the
clock as per instructions of Engineer-in-charge. Contractor should mobilize
sufficient number of manpower & other required equipment/resources and
execute the work in all shifts with independent manpower after receipt of such
instructions. Contractor should not continue the same manpower for more than
B: TOOLS & TACKLES:
(i) All tools & tackles (including those listed in Annexure-E of Section-F), MS
scaffolding pipes & clamps as required to execute the contract are in the scope
of the contractor. The contractor should ensure that tools and tackles are in
healthy & working condition. All consumable items would be in the scope of the
Note: If work is suffered due to want of sufficient manpower, tools &
tackles, MS scaffolding pipes & clamps, equipments and/or required
consumables/materials then 25% of the total job cost including GST will
be levied as a penalty for each and every instance.
(ii) For proper execution of the work as per the scope, the contractor is required to
maintain sufficient quantity of standard tools & tackles, equipments, standard
MS scaffolding, standard safety PPEs, etc… in good condition at site as per
day to day work load and emergency situations to complete the work in
stipulated time.
(iii) In case of breakdown of equipment, the contractor should work round the clock
for putting back the area in service immediately within minimum time. In case
of any emergency arising during night hours the contractor should be in a
position to mobilize the manpower immediately within minimum time.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He
has to arrange all lighting equipment such as power cable, hand lamps. The
contractor has to take prior approval for taking electrical power supply. The
contractor should keep hand lamps of 24Volt for confined space and sufficient
quantity of 240 Volt halogen lamp for other area ensuring safety at work place.
(v) Pin sockets of IS standards should be used for all connections. For any accident
take place & any damage to the equipment and/or injury to human due to
carelessness in loose connection, contractors will be held responsible & liable
for any recovery/actions.
19. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATIONS
The Bidder is required to carefully examine the specifications & documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies
or omissions in the specifications and documents or is in doubt for any meaning of
any part, he shall request in writing for an interpretation/ clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
21. UNDERSTANDING & CLARIFICATION ON DOCUMENTS & SPECIFICATIONS
The Bidder is required to carefully examine the specifications and documents, all
the conditions and matters work wise & cost wise. If any Bidder finds any
discrepancies or omissions in the specifications and documents or is in doubt for
any meaning of any part, he shall request in writing for an interpretation/ clarification
to the GIPCL. All such interpretations and clarifications shall form a part of the Bid
All the payments against the work order shall be in Indian currency and payable
through cheque or through RTGS (online payment) system only based on
submission of required documents like bank mandate form with original cancelled
23. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
a. The schedule of rates (Section-E) shall be read in conjunction with Instructions to
Bidders, General conditions of contract and Special conditions of contract.
b. The quantities given in the schedule of rates (Section-E) are estimated and payment
will be made as per actual certified works as per the rates of work order.
c. The method of measurement of completed work for payment shall be in accordance
with the method of measurement specified in the Tender in Section-D.
d. No separate amount shall be payable for use of auxiliary equipment incidental to or
in day to day operation in the course of fulfillment of contractual obligation of the
Note: It is desirable from interested bidders to submit the online tender offer
at least two days in advance from the due date set for online submission of
bid in order to avoid non-participation of e-tender due to probable technical
problem in e-tender system/server.
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as jointly measured at site & certified by
Engineer-in-charge of GIPCL. However, contractor shall be responsible to restrict
the scope of work and not exceed beyond the provided quantities under specified
items of given packages or beyond package cost without prior written consent of
GIPCL. In any case, GIPCL will not pay for any additional quantity due to any reason
except if advance written consent taken by the contractor from GIPCL to execute
additional quantities.
Quantities of individual items may be revised during the course of contract period
based on site requirement. Contractor shall not be entitled for any compensation on
ground of such alteration in individual quantities. GIPCL reserves the right to
operate or increase/decrease quantities in each item or omit any item included in
Schedule of Quantity at its discretion. Quantity of individual item of SoR package
may vary to any extent. However, contract value per package will be remained firm.
Contractor shall have no claim, whatsoever, on grounds of loss of anticipated profit
etc. on account of the same.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
After commencement of the work, GIPCL, for any reason may not require to be
carried out the whole/part of the work as specified in the tender, the Engineer-in-
charge shall inform the fact for thereof to the CONTRACTOR and contractor shall
have no claim for any payment or compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in full but
which he did not derive in consequence of the full amount of the work not having
been carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions which shall
involve any curtailment of the work as originally contemplated.
25. SPLITTING OF SCOPE OF WORKS
GIPCL, at its discretion, may split the total scope of works between final L1 & L2
bidder after receipt of final offer through complete tender process / subsequent e-
reverse auction / negotiation process. Following guidelines will be adopted for
splitting purpose.
(1) L1 bidder will be awarded about 60% of the total approved contract value of
structural steel painting.
(2) L2 bidder will be awarded remaining around 40% of total approved contract
value of structural steel painting at the same rates of L1 bidder based on written
consent from L2 bidder.
(3) In case of L2 bidder will not agree to work at L1 rates, the entire job of structural
steel painting will be awarded to L1 bidder.
(4) In case of splitting between L1 & L2 bidders, limited redistribution of scope
between the agencies may be considered during execution based on
performance and site requirements, subject to written consent of the concerned
contractor(s), provided that the overall cumulative order value shall remain
within the finally approved L1 tender value.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING & E-
REVERSE AUCTION
SR. DESCRIPTION
1. Tender documents are available only in electronic format and same can be
downloaded from the website: https://tender.nprocure.com or
https://gipcltender.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com
2. Price bid should be submitted online through the website
https://gipcltender.nprocure.com only. No physical submission of price bid
will be entertained as it should be furnished on-line only.
3. Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can
procure the same from any of the license certifying Authority of India or can
contact (n)code solutions- a division of GNFC Limited, who are licensed
Certifying Authority by Government of India
4. All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also
for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Info tower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India).
E-mail: [email protected], website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for online submission of bid in order to avoid non-
participation in case of any technical issues (website and/or network) at last
E-REVERSE AUCTION:
i. GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
ii. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b) Minimum
three (03) lowest bidders, whichever is higher, shall be invited for participation in e-
Reverse Auction through n-procure platform.
iii. Opening Price (including GST), Decrement value and duration for the e-Reverse Auction
shall be informed to the qualified bidders before start of e-Reverse Auction.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
iv. After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
Price (including GST).
v. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
website: https://e-auction.nprocure.com that the bidder shall be allowed to participate
the e-Reverse Auction.
vi. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required
for participating in online e-reverse bidding, then the Bidder can contact the following
office for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://tender.nprocure.com for information regarding e-tendering
registration process and https://e-auction.nprocure.com for e-auction registration.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security/Performance Bank Guarantee, the successful Bidder, to
whom the work is awarded, shall be required to furnish a Performance Bank
Guarantee (PBG)/Contract security deposit (SD) in favour of “Gujarat Industries
Power Company Limited” for an equivalent amount of ten percent (10%) of the
“Contract Price (excluding taxes & duties)” from all Nationalized Banks or Axis Bank,
ICICI Bank, HDFC Bank, Kotak Mahindra Bank, IndusInd Bank, Federal Bank,
Bandhan Bank, IDBI Bank and Karur Vysya Bank in the format attached in
SECTION-F, and it shall guarantee the faithful performance of the 'Contract' in
accordance with the terms and conditions specified in these documents and
specifications. Contract security deposit/PBG shall be submitted strictly within
twenty-one days from the date of LOI or work order, whichever is earlier. The PBG/
Security Deposit shall be valid up to defect liability period of twelve months after the
actual contract completion/expiry date. The Contract security/Guarantee amount
shall be payable to the Company in Bidder's home currency without any condition
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Defect Liability Period' after
completion of contract and on fulfilling contractual obligations throughout the defect
liability period. However, any delay in submission of SD will result in equivalent late
release of entire SD after defect liability period.
Bid security/EMD should be refunded to the successful bidder on receipt of
Performance Security deposit.
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-in-charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract value, including GST.
Recovery will be affected from the monthly bills and/or retention
money/security deposit.
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c)
within the time frame given in work order and as per day to day instructions
by Engineer-in-charge, GIPCL shall get the work done by third party at the
risk & cost of the contractor with 10% additional overhead charges of GIPCL,
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
The contractor shall pay all such claims within 15 days of claim, failing which the
same shall be deducted from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule
and in case contractor fail to complete the job, GIPCL shall recover from his bill,
Security Deposit and / or whatsoever for expenses incurred to complete the job with
additional 10% overhead charges, including GST.
In case if contractor’s services are not found satisfactory with respect to
mobilization, time bound activities, workmanship & safety (OH&S policy of GIPCL)
then GIPCL has right to terminate the contract at any time by giving 15 days
advance notice to contractor without assigning any reason and will make the
alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages
after giving 15 days advance notice to the contractor if any of the following events
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per requirements
of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of the
acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three incidents.
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality of
viii. GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG.
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith
shall be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him/her from any money due
or to become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per directions of GIPCL / ENGINEER within the time frame given
and/or violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall
get the work done by third party at the risk & cost of the CONTRACTOR with
additional 10% overhead charges of GIPCL, including GST and all costs incurred
in connection therewith shall be recoverable from the CONTRACTOR by the GIPCL
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
/ENGINEER as a debt or may be deducted by him from any money due or to
become due to the CONTRACTOR.
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract
to the extent possible shall be settled amicably between the parties.
b. If amicable settlement cannot be reached all the disputed issues shall be
resolved through arbitration before a Sole Arbitrator appointed by Managing
Director, GIPCL according to the provisions of The Arbitration and Conciliation
(Amendment) Act, 2019, as amended from time to time. The place of arbitration
shall be at Vadodara/ Surat or any other place within state of Gujarat.
c. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless
the decision of the Arbitration proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification,
the decision of HoM / Chief General Manager (Thermal) will be final and binding on
the contractor.
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees,
staff applicable under the Employee Compensation Act 1923 or any amendment
thereof from time to time as also insurance cover for third party liability. The
contractor shall keep the GIPCL indemnified from all liabilities arising out of his
action in pursuance of this contract. The E. C. Policy should be obtained from Surat
Jurisdiction and shall be assigned to GIPCL. EC policy should cover the specified
contract period.
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labour laws, rules,
orders and notifications whether central or state or local as applicable to him or to
this contract from time to time. These Acts/Rules include without limitation the
1. Contractor shall be solely responsible and shall fully comply with all the provisions
of all the labour laws applicable such as the Minimum Wages Act, 1948, Contract
Labour (Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus
Act 1965, Employees Provident Fund and Miscellaneous Provision Act
Industrial Dispute Act 1947, Workmen Compensation Act 1923, Payment of Gratuity
1972, Interstate Migrant Workmen Act 1979, Equal Remuneration Act with Rules,
Order and Notifications issued/made there under and as amended from time to time.
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present or future
applicable to the contractor from time to time for performing the contract job.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
2.1. The Contractor shall provide and be responsible for payment of Wages, Salaries,
Bonus, Social charges, Insurance, Food, Accommodation, Transport, Medical and
Canteen facilities and other statutory privileges and facilities to his personnel as
per law/rules/regulations and orders of the Central Government, State
Government, Local Authorities or other authorities as are in force from time to time.
All employees of the Contractor shall be employee of the Contractor.
2.2. The contractor shall have a valid license obtained from Licensing Authority under
the Contract Labour (Regulation & Abolition) Act,1970 as amended from time to
time at the time of execution of the contract covering all his employees working at
SLPP site and furnish the same failing which GIPCL may terminate the contract at
its sole discretion.
2.3. The Contractor shall at the time of execution of the contract have a EPF Code
Number obtained from the Authorities concerned under the Employees Provident
& Miscellaneous Provisions Act, 1952, as amended from time to time and remit
contributions in respect of the employees employed by him at SLPP Site to the P.F
office concerned every month failing which GIPCL will recover from the outstanding
payment to the contractor from GIPCL.PF code of Gujarat region should be taken.
2.4. The Contractor shall maintain all records/registers required to be maintained by
him under various labour laws mentioned above and produce the same before the
Statutory Authorities whenever required.
2.5. The Contractor shall also submit periodical reports / returns to the various statutory
authorities such as those under the Contract Labour (Regulation & Abolition) Act-
1970, Employees Provident Fund Act, as amended from time to time, etc., under
intimation to HR & Admn. Dept.
2.6. The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
2.7. The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed hours
under law as per applicable rates.
2.8. The contractor shall take Workmen Compensation Insurance Policy for all his
employees working at GIPCL. The contractor shall indemnify the company against
any liability due to any work injury or accident to any of its employees.
2.9. The Contractor shall in the event any of his workmen / employee sustains any injury
or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act, 1923 as amended
from time to time.
2.10. If any of the persons engaged by the Contractor misbehave with any of the officials
or the Company or commit any misconduct with regard to the property of the
Company or suffer from any serious communicable disease, the Contractor shall
replace them immediately.
2.11. The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
2.12. GIPCL will have right to deduct and disburse the claims of the individual / parties
being a principal employer on any account whatsoever in relation to their
employment with the contractor. The Security deposit will be released to the
contractor at the end of the contractual tenure subject to an undertaking by the
contractor that in the event any of his workmen or the heirs of workmen puts up a
claim for recovery of money due to him from the contractor before the appropriate
authority under the I.D.Act 1947 or under any other labour laws or for compensation
under the Workmen’s Compensation Act, 1923 as amended from time to time and
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
the appropriate authority has given a direction for making payment the contractor
will meet the same or indemnify GIPCL if in the event GIPCL pays it as Principal
2.13. The contractor shall make payment of wages to his employees on fixed date within
the period specified under the applicable Law, in presence of representative of the
company. He will submit a true copy of wage sheet, attendance register and P.F.
remitted challans on monthly basis to HR&A dept. for verification and record.
2.14. The Contractor shall provide Safety items / kits to his employees such as safety
shoes, goggles, ear plugs, hand gloves, safety belts etc., if any, required under the
2.15. The contractor shall conduct pre-induction and periodic medical checkup of his
workmen as per applicable laws.
2.16. The contractor shall be solely responsible for any accident caused to his workers
and should adhere to all rules / regulations as per labour laws of Government and
other statutory laws as applicable.
2.17. The contractor should register himself under the Contract Labour Act, Employee
Compensation Act and PF Act, as amended from time to time (Code no. to be
mentioned) and submit the copy of registration certificate and should possess the
same from the date of commencement of work, failing which the contract is liable
to be cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labour License should be obtained within one
week from the date of issue of form-V. Contractor should apply for Form-V
immediately after receipt of LOI. A copy of Labour License shall be submitted to
GIPCL, HR & A Department.
2.18. Contractor shall have to insure his workmen /supervisors etc. under Group
Insurance scheme.
2.19. The Contractor shall be responsible for compliance of all statutory rules, regulation,
act enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund
Act, All Labour Laws Act, as amended from time to time in respect of employees
engaged by him for the work and shall have to maintain necessary records. In case
any amount becomes due to be payable by him to his employees or to the
Government under the above rules, regulation, Acts, GIPCL reserves the right to
recover the same from the running bill of the contract.
2.20. Documentary evidence of deposit of PF paid shall have to be produced by the
contractor along with the next bill.
2.21. Records as per the provisions of various statutory Acts will have to be maintained
by the contractor and submitted as and when required.
2.22. All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any such
person who does not comply with it.
2.23. The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new statute
shall automatically and immediately become applicable.
2.24. All laws, rules, regulations, notifications, etc. stated in this tender document shall
be applicable as amended from time to time. Where applicable self-certified true
copies of the required documents to be furnished, unless stated otherwise
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act, as amended from time to time to the
workers employed by him/her.
2. Contractor shall obtain requisite license to carry out this contract under the
provisions of Contract Labour Act, 1970, as amended from time to time and maintain
necessary records and registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act, as amended from
time to time within one-week time, from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the premises of the GIPCL and carry match box / lighter or any other explosive and
/or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour
Laws, as amended from time to time, etc.
6. Contractor shall issue an appointment order to each casual labourer stating therein
the nature of job to be performed by him/her and fix time for which the concerned
labourers are likely to be deployed. Contractor shall also issue a temporary identity
card specifying the period for which the labourer has been deployed.
7. Contractor is fully liable for the persons engaged by him/her for above work;
however, GIPCL reserves the right to deduct any amount legally justified towards
any liability not fulfilled.
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame,
GIPCL shall get the work done by third party at the risk and cost of contractor.
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund
Act, Payment of Bonus Act, Labour Law Act, maternity benefit act, as amended from
time to time in respect of employees engaged by him/her for the work and shall
have to maintain necessary records.
In case any amount becomes due to be payable by him/her to his employees or to
the Government under the above rules, regulation, Acts, GIPCL reserves the right
to recover the same from the running bill of the contract.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third-party
workmen due to any act omission / indiscretion on contractor part while
undertaking the work and contractor shall fully abide by the statutory requirements
of the employee's compensation act. GIPCL shall not be liable for any
compensation due to accident, death or injury to any of contractor’s workmen or any
third party due to negligence, act or omission on contractor part.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
General area lighting will be provided by GIPCL. However, work area specific
lighting should be arranged by contractor.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the
GIPCL which are at present in force and which may come into force during the
pendency of the contract. Any violation of any rules and regulations will entail
immediate termination of the contract.
When contractor moves his/her lifting tools and tackles to the plant area, required
test certificates as per the Factories Act 1948, as amended from time to time and
the state factories rules has to be submitted to safety Dept. Safety Dept. will check
the certificates and if found okay, then only materials will be allowed to enter inside
the plant. Material inward gate pass will be made only after certification from Safety
Dept. Security Dept. will inform to Safety Dept., as & when such tools and tackles
brought at the gate for making entry in the maintenance site.
The contractor has to submit the list of required safety gears along with safety
equipments available with him/her to safety Dept. Safety Dept. will check for
quantity and quality of the safety gears and then allowed permission of work. Poor
quality material will not be allowed to take inside the Plant. If quantity of required
safety equipments is not satisfactory, contractor will not be allowed to carry out the
work using such safety gears inside the Plant for the work.
15. GENERAL SAFETY CLAUSES
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet or similar equivalent brand (after
approval of samples from Head of Safety Department GIPCL-SLPP), shall be issued
to contract workmen. Contractor shall issue safety shoes every year.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr No. Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
IS : 2925 – 1984, ANSI / ISEA
03. PN 521 - Shelmet Karam
SR. No. Name of Manufacturer Model
SSTEELE (Strom) – Double Density or
1 Acme Fabrik Plast Co.
TRIMAX(Adjacent) – Double Density
2 Favourite Safety Products. Waves Nile D/D or FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per
the job requirements. Safety helmet shall be of YELLOW COLOUR ONLY.
Contractor will procure safety shoes & safety helmet from a reputed company with
at least 12 months’ guarantee and shall produce the guarantee certificate and IS
standard certificate to the safety department. Contractor should purchase safety
shoes of reputed brands. Safety shoes will be issued every year. IS certificate and
guarantee certificate must be obtained from the vendor and submitted to the Safety
department. Safety shoes should be heat, water, oil and chemical resistant, having
an anti-slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as
per work requirement. Contractor should ensure that their workers are wearing
Safety helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when
they are at work throughout the contract period. The contractor has to maintain the
PPE issue registers with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help
and treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of
required quality, GIPCL will issue the required PPEs to contract workers and back
charge the same with 25% overhead charges of GIPCL, including GST.
9. All lifting tools and tackles shall be duly certified by competent person in conformity
with the statutory requirements and certificate in form no. 10 as per rule 60 of
Gujarat Factories Rules, 1963 and section 29 of the Factories Act, 1948, as
amended from time to time shall be submitted every year before using such tools
and tackles. In case of purchase of new lifting tools and tackles, form no. 10 as per
the said rules shall be submitted before they are taken into use. All lifting tools and
tackles shall be of reputed make having International manufacturing standard and
shall be maintained in proper and workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety
aspects at site. He is solely responsible for any safety measures during
maintenance work. He has to ensure that all the workmen working at site are
equipped with essential PPE’s and proper safety arrangement is made at the SLPP
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks,
D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
for inspection with all above statutory test certificate before using at site for any
work. They should use all tools and tackles only after certification by GIPCL
representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials,
full body harness safety belt, ladders and crawling boards, fall arrester, etc. shall be
used to prevent accident. Further, during working on height, contractor should
arrange proper scaffolding of steel pipes, safety net, full body safety belt, fall
arrestor system etc. Advice and instructions of engineer in charge/ safety in charge
shall be strictly complied with in this regard. All necessary safety precautions shall
be taken by the contractor to prevent accident and personnel injuries while working
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting
torch, on DA cylinders and on O2 cylinder. Cylinder caps also required for handling
the cylinders at the work at height area. Gas cylinders shall be transferred through
gas cylinder trolley only with cylinder cap and stored up right (vertical) position only.
All gas cylinders shall be hydro tested / certified as per gas cylinder rules 2004. Gas
cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in
Parking space designated by GIPCL. If any vehicle is found inside the plant
premises other than the parking area such vehicles shall be handed over to Security
dept. and their entry shall be cancelled for movement inside the plant premises with
immediate effect.
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be
checked by the electrical engineer of the contractors regularly, every six months at
least and report to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets
to prevent falling and spreading of sparks and hot material on and around the work
area. Contractor will procure and use such items. ELCB / RCCB shall be provided
with rating of 9-30 milli amperes on welding machine and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation
form (S-II) and near miss report within time limit as specified in forms, if any
accident, Incident, near miss occurred while working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract
jobs and he will in close coordination with safety officer of SLPP and attend all safety
related meeting such as safety committee, on job safety training etc. Where the
contractual man power is less than 50, the site in charge of the contractor will act
as a safety officer and he will perform all the duties of safety officer as mentioned
19. No loose connection / joints allowed in electrical cables during performance of any
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
23. The Contractor shall comply all the new requirements related with safety as
informed by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain
the principles behind safety practice.
If the contract workmen fail to comply with safety standards as per category A, B & C
below, penalty shall be levied on the contractor as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, shoes, Rs.100 /- per instant.
Related safety belt, gloves etc.
B WI Related Failure to adhere to HSE Rs.500 /- per
guidelines/plans, careless instant.
attitude in material handling,
Machine being used with After three
damaged machine guard, incidence, Per
unsafe electrical work – incidence
workout plug top/improper Rs.2500/-
electrical joints/cables lying on
ground, electrical equipment Continuous
working without proper unsafe acts will
earthing, machine being used disqualify the
without machine guard, contractor from
Welding machine without further
ELCB / RCCB of proper rating, participation in
Gas cylinder without test tender of/contract
certificate, Cylinder cap, NRV with GIPCL-
/ Flash back arrester, Cylinder SLPP.
Unsafe working practices at
height more than 3 meters
Working without permit or non-
compliance with permit
conditions like hot work, height
work etc. as applicable, lifting
tools and tackles being used
without third party inspection
certificates in form no. 9/10 as
per Factories Act – 1948 etc..
C Unsafe Breach of safe practices by a Suspend the entry gate
Practices particular person repeatedly pass for one week.
for three times.
After two suspensions his
gate pass will be cancelled.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
15.1 GENERAL ELECTRICAL SAFETY RULES & REGULATIONS
Electrical safety
a. All the electrical apparatus including welding machine (either 3-phase or single
phase) should be provided with Earth Leakage Circuit Breaker
(ELCB/RCCB/RCBO) of 30mA rating.
b. Bidder/Contractor should ensure periodic checking of ELCB provided in their
electrical apparatus.
c. Bidder/Contractor should ensure that there should not be any joint in the power
supply cable of any machine. All cables should be in good condition with no bare
insulation or frayed wires
d. Any power supply switchboard/extension boards brought by Bidder/Contractor
should have ELCB of 30mA rating and it should have sockets along with 3-pin plug.
e. Any type of cable brought by Bidder/Contractor should not have any joint and should
be of sufficient capacity for the respective job.
f. Bidder/Contractor to bring their own 24V rating portable hand lamps along with
cable of (apparatus should be having 230V / 24V transformer) for the temporary
lighting arrangement required at site for the respective jobs.
g. Bidder/Contractor should bring sufficient quantity no. of temporary light fixtures
(230V or 24 V as per requirement of job/contract), extension boards, cables to draw
supply from nearest power point.
h. Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
i. Bidder/Contractor to ensure healthiness of their electrical equipment whenever
brought to GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
j. Bidder/Contractor to ensure - All portable electric apparatus shall be regularly
examined, tested and maintained to ensure that the apparatus and leads are in
k. Only three-core cable shall be used for single phase operated tools with the third
core connected to earth.
l. Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
m. All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
n. The earthing arrangements should be properly made with earthing clamps or a
bolted terminal while using any welding machine
o. Electric holders when not in use, should be placed on an insulated hook or the
holders should be fully insulated while using any welding machine
p. Whenever the welder stops or leaves work for any appreciable time, the power
supply to welding machine shall be effectively disconnected while using any welding
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
q. GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder/Contractor to supply the required cable between
GIPCL power supply point to equipment brought by Bidder/Contractor for the
specified job. Further, if Bidder’s/Contractor’s equipment requires 3-ph 4 wire
supply then they should derive 3-ph 4 wire supply from GIPCL 3-ph 3 wire supply
system by incorporating sufficient capacity transformer. Like for hydro jet cleaning
system, mixer machine, induction heating machine, SR machine etc., GIPCL will
provide 3-ph 3 wire power supply.
r. Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as
Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine/ apparatus shall be seized by GIPCL.
16. REJECTION OF WORK
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the GIPCL/Engineer/
GIPCL’s Representative may reject such plant, materials, work or workmanship and
shall notify the CONTRACTOR promptly, stating his reasons. The CONTRACTOR
shall then promptly make good the defect and ensure that the rejected item
complies with the Contract. If Contractor failed to rectify the rejected work or
workmanship, GIPCL/Engineer reserves the right to deduct or withhold amount
against rejected work or Workmanship. CONTRACTOR shall not entitle for any
claim or release of hold payment until rectify the defect up to satisfactory of GIPCL.
If Contractor failed to rectify any such defective work or workmanship, GIPCL
reserves the right to rectify at risk and cost of the CONTRACTOR and deducted by
the GIPCL from any amount due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the
traveling and lodging costs of GIPCL/Engineer’s personal for attending the retest,
such costs shall be recoverable from the CONTRACTOR by the GIPCL and may
be deducted by the GIPCL from any amount due, or to become due, to the
17. GENERAL TERMS AND CONDITIONS
a. All tools & tackles, labours, equipments, materials, scaffolding, safety PPEs & safety
equipments, consumables etc… to execute the contract are in the scope of the
contractor. The contractor should ensure that tools & equipments are in healthy
b. The decision of the Engineer-in-charge shall be final and binding on the contractor
for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
d. Contractor shall depute full time independent experienced site-in-charge and
independent site supervisors at site. They shall co-ordinate with GIPCL engineer
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
and shall bear overall responsibility of contract including joint measurement, billing
etc. Such person shall function from site office of contractor at SLPP.
e. Contractor shall also nominate one independent safety supervisor at site and shall
submit nomination of safety supervisor in writing before commencement of contract.
Safety supervisor shall arrange small safety talk on every day morning or whenever
required with all workers working under this contract. He shall coordinate with
concern department’s Engineer-in-charge on daily basis and report daily
observations, tool-box talk records etc. GIPCL reserves the right to hold the work
in case contractor not deployed safety supervisor and a penalty equal to
Rs.1,000/- per working day absent of safety supervisor shall be levied from
f. Contractor shall strictly follow the existing work permit system of the GIPCL and any
future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor
has to submit labor license and PF account number to the Engineer-in-charge
before start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In
case of delay of work without any valid reason, the GIPCL reserves the rights to
carry out the work by deploying other agencies at the risk & cost of contractor with
additional 10% overhead charges including GST.
i. Contractor shall mobilize the resources as per need within the period of Twelve
hours. If the contractor fails to mobilize sufficient resources to complete the job in
time, GIPCL will execute the job through other agency at the risk and cost of the
contractor with additional 10% overhead charges including GST.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven days from the date of issue of Letter of Intent/Work Order.
k. The final accepted prices / item rates of work order shall remain firm till completion
of the contract and any agreed extensions thereafter and is valid even if the contract
is split and shall not be subject to any escalation, idle charges for labor, machinery,
overhead expenses etc… due to any reason whatsoever. No price escalation / idle
charges shall be entertained due to delay in work on unavailability of work front,
non-issue of work permit, holding of work permit for any reason, unavailability of
contractor’s supervisor, unavailability of contractor’s safety supervisor, violation of
safety rules, unsafe act by any of contractor’s worker, negligence & ignorance of
safety & quality instructions of GIPCL Engineer-in-charge or any other reason
l. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy standard safety
PPEs like but not limited to approved quality safety shoes & safety helmets,
standard dust masks, safety goggles, double harness full body safety belts, safety
life line & fall arrestors etc… as required and shall use exclusively under this
contract for all the time during working at specified locations failing which, the
Engineer-in-charge may hold the work and will take necessary action including
penalty as decided. If the contractor repeatedly violates safety rules/regulations
(more than three successive incidents), Engineer-in-charge may take necessary
action against the contractor, including appropriate financial penalty (Maximum of
Rs.1,000/- per incident per man-day and as per above clause no. 15) and/or
termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activity and complete the jobs as per the
time given by and under the supervision of the Engineer-in-charge and shall ensure
that sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer-in-Charge for PTW (Permit to
work), work instruction, Return of permit.
p. The contractor has to submit daily reports showing work carried out with details of
available manpower, material etc.
q. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on
respective item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2006. The Bidder shall confirm whether your organization is registered under the
Micro, Small and Medium Enterprises Development Act, 2006, as amended from
time to time. If your organization is registered under the Act, please specify the
category i.e., Micro Enterprise, Small Enterprise or Medium Enterprise under which
it is registered and kindly attach a copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of
the respective State Government. It is to be noted that large scale industries and
trading firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001-2015 (Quality), ISO 14001-2015 (Environment), 45001-2018
(OH&S) and 50001-2018 (EnMS) certified company, and GIPCL gives extreme
importance to maintain these global standards. Contractor shall be required to
observe these standards as amended time to time while working with GIPCL.
Contractor should ensure that his workmen/labour work in accordance with them.
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a
qualified experienced site-in-charge of the works with adequate experience in
handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEER.
Such in-charge shall be constantly in attendance at the site during working hours.
During CONTRACTOR’S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR’S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing.
Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall
be deemed to have been given to the CONTRACTOR. The representative of the
CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials and
proceed with the work as required for speedy execution.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress
/ successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such
persons as area careful, skilled and experienced in their respective trades and the
GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any
person employed by the CONTRACTOR in or about execution of works who in the
opinion of the ENGINEER misconducts himself or is incompetent or negligent in the
proper performance of his duties and all such persons shall not again be employed
upon the works without the prior permission of the GIPCL. Neither the
CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ any
employee of the other party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, empty paint drums, cut pieces or
other matter of an offensive nature shall not be deposited on the surface, but shall
at once be carted away by the CONTRACTOR to some pit or place provided by him
away from the site of work and approved by local authorities. As a part of the work
included in this contract, the CONTRACTOR shall completely remove and
satisfactorily dispose of all temporary works & remove scaffolding materials to the
extent directed. He shall tear down and dispose of all temporary works, shall remove
or grade, to the extent directed, all plant and equipment, shall satisfactorily dispose-
off all rubbish resulting from the operations under this contract and shall do all work
necessary to restore the territory embraced within the site of his operations to at
least as good order and conditions as at the beginning of the work under this
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point. Further distribution to be done
by contractor at their cost.
b. Quarter/room & food for supervisors/engineers on chargeable basis in GIPCL’s
township as available. Food on chargeable basis at GIPCL’s Industrial Canteen
as available. If not available, contractor to make his own arrangement for
lodging and boarding locally or as appropriate at his cost.
c. Workshop facility as available at site only. However, contractor may visit the
workshop to ensure the existing facility. For the facilities other than available,
contractor has to carry out the job outside at their own cost.
d. Space for contractor’s office & store as decided by GIPCL based on availability.
e. First aid facilities as available on chargeable basis. If not available contractor
to make his own arrangement for the same locally or as appropriate at his cost.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen
regarding the safety norms and measures to be observed during work
operations at the plant site.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
21. WORK CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be
fully conversant with modern practices and should be able to carry out works
independently of large thermal power plant. The contractor shall therefore be
required to engage qualified/ experienced personnel to undertake the work as
per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement
sheet/register/relevant documents by the contractor / authorized representative
of the contractor and the Engineer-in-charge. The measurements shall be
clearly written indicating date of measurement, location, reference to drawings,
if any, and jointly signed.
d. The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the monthly bill
payment shall be released based on the certified reports of the works.
e. Inspection of work will be done by Engineer in Charge or his authorized
representative. If the work is not found satisfactory engineer in charge reserves
the right to take suitable action and shall be binding to the contractor.
22. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions. If
a Force Majeure situation arises, the affected Party shall promptly notify the other
Party in writing of such conditions and the performance shall be suspended as per
mutual agreement.
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control
of the Party and not foreseeable by the Party and shall include events of floods,
explosions, riots, wars, hurricane, epidemics, any other Act of God, quarantine
restrictions, terrorism, government actions and provided always that such acts
result in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may
sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any
direction or order is issued by court at any point of time the contractor shall comply
with and implement such direction or order whether passed at the time of award of
contract or during the pendency of contract. Further, the Contractor shall indemnify
the GIPCL against all consequences arising and affecting GIPCL owing to the
compliance of the orders by the Contractor.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
24. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Surat shall have jurisdiction regarding the same.
25. Where any portion of the General Condition of Contract is repugnant to or at
variance with any provisions of the Special Condition of Contract, then unless a
different intention appears, the provision of the Special Conditions of Contract shall
prevail to the extent of such repugnancy or variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
SPECIAL CONDITIONS OF CONTRACT
1.0 DETAIL SCOPE OF WORK FOR PAINTING WORK AT PLANT
1. Scope of work includes supply of approved industrial paint and applying painting
on the various plant steel structures of Boiler, Pipe & Cable Rack structures, steel
structures of Chimney, steel structures of TG Building, steel structures /
equipments & auxiliaries of Electric transformers & equipment/panels, Boilers,
various MS pipelines & MS tanks, Fire hydrants, Turbine area structure, other Plant
building internal/external steel structures, Steel Structures & steel bridge at
GIPCL’s Intake-Well situated at Village Patna, Kakra Khadi Bridge steel structure
and KRBC canal crossing bridge steel structure etc... as per respective items of
BoQ/SoR (Section-E of Tender) and as per detail specifications under Package-I,
II, III & IV of Section-E.
2. Scope of work also includes supply of GIPCL approved make & quality industrial
paint and applying painting on miscellaneous structural steels etc… as per GIPCL
3. Scope also includes supply of GIPCL approved make & quality industrial paints,
other materials, like consumables, equipments, Flap Disc Buffing wheels along
with grinders, calibrated digital Elko meter with valid calibration certificate,
compressor, jetting nozzles, hose pipes with all accessories, safe storage of
materials (to not contaminate the area), etc. Contractor’s offer shall include any
wastage of paint during painting, cost of labour, supervision, cost of safety
supervisor, shifting, transportation, loading, unloading, equipment, all tools &
tackles, safety equipments & PPEs, safety life line, safety net, fall arrestors, safety
belts (double harness full body), fall arrestors, approved scaffolding (standard MS
pipes & clamps only), MS ladders, MS Jali for platform etc…including as specified
in Annexure-E of Section-F here in.
NOTE:- The Bidder shall note that the tentative list of requirements of various
tools-tackles & equipments as specified hereinunder (Annexure-E of Section-F) is
not exhaustive and if any additional tools & tackles or equipment, machinery etc.,
are required for proper performance of the contract, the same shall also be
arranged immediately without any extra cost to GIPCL.
4. Contractor shall deploy separate gangs of manpower with supervisors along with
overall site-in-charge to initiate scope of works under all the packages
simultaneously and shall be responsible to ensure timely completion of specific
painting as directed by Engineer-in-charge. Advance work planning schedule for
each package/locations shall be prepared jointly in concurrence with concern
Engineer-in-charge.
1.1 GENERAL SPECIFICATIONS FOR PAINTING WITH PROTECTOMASTIC & PU PAINT:
1. The steel structures like columns, beams, trestles, plates, angles, channels, pipes,
etc… are to be painted as per specifications. The structures are fabricated by
beams, channels, angles, flats & plates of different size and thickness.
2. Surface preparation of structures by scrapping & cleaning the surface by wire
brush, chisels, Flap Disc Buffing wheels with grinder machine, mechanical tools &
grinder is to be done compulsorily. At some locations, the cleaning shall be carried
out by water/air jetting. All necessary arrangement for water/air jetting including
arrangement of pump, compressor, etc. shall be in the scope of contractors. All the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
loose rust, old paints etc. are to be cleaned up to the entire satisfaction and
certification of Engineer-in-charge. Without certification of scrapping & cleaning
work from Engineer-in-charge, painting will not be allowed. Joint records to be
taken for initial thickness of existing surface with digital Alco meter (to be supplied
by contractor) as directed by Engineer-in-charge.
3. One coat of minimum 100-micron DFT High Build self-priming epoxy primer
(Composition: Modified epoxy, cured with polyamidoamine) to be applied uniformly
on the surface of steel after perfectly cleaning the structures by the wire brush,
Flap Disc Buffing wheels with grinder machine, chisels & grinders. All the loose
rust, paints etc. are to be cleaned.
4. Joint records to be taken for verification of thickness with digital Alco meter (to be
supplied by contractor) as directed by Engineer-in-charge.
5. Before applying successive coat, proper cleaning of the entire surface shall be
carried out to remove any dirt, dust, etc...
6. Two successive coats of Acrylic Polyurethane high glossy paint (Composition:
Acrylic resin with urethane hardener suitably pigmented, cured with
polyisocyanate) are to be applied uniformly for total minimum 50 micron DFT. Joint
records to be taken for verification of DFT with digital Alco meter (to be supplied
by contractor) as directed by Engineer-in-charge.
7. Before proceeding to next activity (primer after cleaning, first coat after primer and
second coat after first coat), the previous activity (cleaning, primer, first coat) and
final activity (second coat) shall be recorded in the activity register and jointly
verified by contractor’s representative & concern Engineer-in-charge of GIPCL.
8. For painting of unapproachable structures, in view of GIPCL Engineer, contractor
shall arrange standard painting spray gun with compressor.
1.2 GENERAL SPECIFICATIONS FOR PAINTING WITH SYNTHETIC ENAMEL PAINT:
1. The steel structures like columns, beams, trestles, plates, angles, channels, pipes,
etc… are to be painted with Synthetic enamel paint. The structures are fabricated
by beams, channels, angles, flats & plates of different size and thickness.
2. Surface preparation of structures by cleaning the surface by wire brush, chisels,
Flap Disc Buffing wheels with grinder machine, mechanical tools & grinder is to be
done compulsorily. At some locations, the cleaning shall be carried out by water/air
jetting. All necessary arrangement for water/air jetting including arrangement of
pump, compressor, etc. shall be in the scope of contractors. All the loose rust, old
paints etc. are to be cleaned up to the entire satisfaction and certification of
Engineer-in-charge. Without certification of scrapping & cleaning work from
Engineer-in-charge, painting will not be allowed. Joint records to be taken for initial
thickness of existing surface with digital Alco meter (to be supplied by contractor)
as directed by Engineer-in-charge.
3. One coat of minimum 40 micron DFT High Build ZP Primer confirms to IS: 2074 to
be applied uniformly on the surface of steel after perfectly cleaning the surface by
the wire brush, chisels & grinders. All the loose rust, paints etc. are to be cleaned.
Joint records to be taken for verification of thickness of red oxide primer with digital
Alco meter (to be supplied by contractor) as directed by Engineer-in-charge.
4. Before applying successive coat, proper cleaning of the entire surface shall be
carried out to remove any dirt, dust, etc...
5. First coat of minimum 25 micron DFT Luxol high glossy Synthetic enamel paint in
Light Grey shade is to be applied uniformly. Joint records to be taken for verification
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
of thickness of first coat of synthetic enamel paint with digital Alco meter (to be
supplied by contractor) as directed by Engineer-in-charge.
6. After drying of the first coat of Light Grey synthetic enamel & surface cleaning, the
next successive coat of minimum 25 micron DFT Luxol high glossy Synthetic
enamel paint in Smoke Grey shade shall be applied uniformly. Joint records to be
taken for verification of thickness of second coat of synthetic enamel paint with
digital Alco meter (to be supplied by contractor) as directed by Engineer-in-charge.
7. Before proceeding to next activity (primer after cleaning, first coat after primer and
second coat after first coat), the previous activity (cleaning, primer, first coat) and
final activity (second coat) shall be recorded in the activity register and jointly
verified by contractor’s representative & concern Engineer-in-charge of GIPCL.
8. For painting of unapproachable structures, in view of GIPCL Engineer, contractor
shall arrange standard painting spray gun with compressor.
1.3 SPECIAL SPECIFICATIONS FOR PAINTING WORK FOR ELECTRICAL
EQUIPMENTS (PACKAGE-II):
1. Equipment Identification detail:-
All the identifications written over transformer & bus duct body should be first
noted and should be kept as reference before starting the scrapping work. These
identifications should be written back by a skilled painter with black paint over
yellow background after completion of transformer painting work.
2. Scrapping & Cleaning:-
The outer surface of the transformer/bus-duct body should be scrapped properly
with wire brush /emery paper to remove the old paint only at locations wherever
the old paint has peeled off. After this the entire transformer & bus duct body
should be first cleaned properly by blowing air, rubbed with clean cloth followed
with cleaning with kerosene soaked cloth so as to de-grease and remove any oil
stains and then cleaned with soap solution. Clearance should be obtained from
GIPCL Engineer-In-charge before starting application of Red Oxide Paint. All
consumables like Wire Brush, emery paper, soap & its solution, cloth for
cleaning, Kerosene etc. should be procured, arranged and provided by the
The scrapping & painting of supports, provided for bus ducts, in the same
manner as stated above, is also included in the scope of work.
3. Application of one Coat of primer:-
After scrapping & proper cleaning of Transformer with all accessories/fitments &
its associated bus duct and supports, the areas wherever the rusting of metal
has caused erosion (especially on transformer radiators) the same should be
first smoothened by application of Lapi. Supply & application of good quality Lapi
is in scope of contractor. The entire surface of transformer & bus duct to be then
sprayed painted with one coat of specified primer. All the equipments like
Compressor, spray gun, associated piping etc is in scope of the contractor. GIPCL
do not ensure to provide any compressed Air for the purpose of spray painting,
hence the Contractor must arrange its own compressor. Power supply will be
made available free of cost by GIPCL at a nearest distance of 50 Mtr. The cable
required to extend power supply from the power point to the compressor
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
machine is in the scope of contractor. Contractor should also maintain basic
consumable items like V-belts, contactor, pressure switch etc. so that no time is
lost in carrying out the painting work, for the problem in compressor Etc., once
the transformer has been isolated from the service.
The site of transformer installation may have airborne particles. The
transformers should therefore be covered with polythene/plastic sheet to protect
the painted surface from settling of foreign particles. The plastic sheet has to be
provided by the contractor carrying out the work.
While painting the equipments, it shall be the responsibility of the contractor to
protect the name plate details and other details which forms important history
for the equipment. The paint should be wiped off immediately over such name
plates when the red oxide/paint is wet.
4. Application of two Coat of Enamel Paint:-
After application of one coat of specified primer, the transformer, bus duct, bus
duct supports should be painted with two coats of Enamel paint.
The second coat should be applied only after dry out and clearance given by
GIPCL Engineer-In-charge. During painting work under Package-E, contractor
shall also paint surrounding area miscellaneous very small structures like lamp
support angle, panel base support, etc without any additional cost as directed
by Engineer-in-charge.
5. Area cleaning for Spillover paint:-
The areas of transformer painting are likely to have all spillover paint/ primer
due to its handling. It shall be responsibility of the Contractor to remove all such
taints before submitting their protocol for certification of work completion to
GIPCL Engineer-In-charge.
6. Identification of the Equipment after Painting:-
All the equipments offered for painting in the scope of work is clearly identified
for the details like the “Supply from Feeder no.”, “supply to” etc. Also the
individual sections of Bus-ducts are identified for its matching with other
sections. This identification forms vital information for operation personnel for
system operation. This identification which is to be noted before starting the
work is to be repainted by a skilled painter with black paint over yellow painted
background having a black border. The supply of black & yellow colored paint
for identification of equipment shall be in scope of the Contractor and will not
be provided by GIPCL.
7. Provisions to be made by Contractor:-
a. All paint & primer, thinner, consumables like wire brush, emery paper,
Madarpath cloth, Kerosene, soap, good quality Lapi, painting brush etc. is
in scope of contractor.
b. Compressor for the purpose of spray painting is in scope of the contractor.
GIPCL do not ensure to provide any compressed air for the purpose of spray
painting. However, power supply for the Compressor at one nearest point
of approx. 50 mtrs will be provided by GIPCL, near the execution of work.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
All the required spares like contactor, pressure switch, v-belt etc. and all
other spares required to restore the compressor immediately after
breakdown of contractor’s T&P is in scope of contractor. Spray gun along
with associated piping is included in scope of contractor.
c. Power cable (minimum 50 Mtr.) of required size to extend power supply
from the nearest available supply source to compressor is in scope of
d. Intra-site transport of man & machine is in scope of contractor. Contractor
may please note that the equipments to be painted is in radius of 4 km to
e. Tarpaulin sheet/ Polythene sheets required to cover the transformer after
painting & before drying out is in scope of contractor.
f. All other material required for completion of the work but not indicated
herein is in the scope of Contractor.
g. The ESP transformers are located at an elevation of 0 to 35 mtr. elevation.
Lifting & lowering of Compressor machine and all required material to such
location is also included in scope of contractor.
h. Ladder of Height 0-10 Meter to facilitate painting of bus duct is included in
scope of Contractor.
i. Required quantity of Yellow & Black paint for marking.
1.4 SPECIAL SPECIFICATIONS FOR PAINTING WORK FOR LP PIPING SYSTEM,
SUPPORTING STRUCTURES & TANKS OF BOP AREA AND STRUCTURES ETC OF
TG AREA (PACKAGE-III):
A. For Application of synthetic enamel.
1. Initially, surface preparation by cleaning the surface by wire brush, chisels,
Flap Disc Buffing wheels with grinder machine, mechanical tools & grinder
is to be done compulsorily.
2. All the loose rust, old paints etc. are to be cleaned up to the entire
satisfaction and certification of Engineer-in-charge. Without certification of
scrapping & cleaning work from Engineer-in-charge, painting will not be
allowed. Joint records to be taken for initial thickness of existing surface with
properly calibrated digital Elko meter (to be arranged by Contractor) as
directed by Engineer-in-charge.
3. One coat of Primer as mentioned in Specification of Paints in above clause
no. 1.3 shall be applied uniformly on the surface of pipes and Structural after
perfectly cleaning by the wire brush, chisels & grinders. All the loose rust,
old paint, oil, dirt, dust, scale etc. is to be perfectly cleaned. The thickness
of primer will be minimum 40 microns.
4. Joint records are to be taken for verification of thickness after applying
Primer with properly calibrated digital Elko meter (to be arranged by
Contractor) as directed by Engineer-in-charge and clearance to be taken for
applying of Synthetic Enamel thereafter.
5. After drying of the primer, Total Two (2) Finish coats of Synthetic enamel as
mentioned in Specification of Paints in above clause no. 1.3 are to be
6. Joint records are to be taken for verification of thickness after applying first
coat of synthetic enamel paint with properly calibrated digital Elko meter (to
be supplied by Contractor) as directed by Engineer-in-charge and clearance
shall be obtained for applying second coat thereafter.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
7. The thickness of each coat of paint shall be minimum 25 microns.
8. The optimum thickness shall be applied by brushing with minimum of brush
B. For Application of Epoxy Primer and PU paint on Structures.
1. Application of one coat of minimum 100 micron DFT High Build self priming
epoxy primer (Composition: Modified epoxy, cured with polyamidoamine) and
two coats of Acrylic Polyurethane high glossy finish paint (Composition:
Acrylic resin with urethane hardener suitably pigmented, cured with
Polyisocyanate) for total minimum 50 micron DFT as per manufacturer’s
recommendations and as per above clause no. 1.2 to the steel structure
including preparation of surface by thoroughly cleaning of oil, dirt, dust, rust
and scale by wire brushing, power tool cleaning etc complete. At least
hours time period shall be elapsed between the applications of successive
2. Contractor has to ensure that the different layers of paints are being applied
after being inspected by Engineer-in-charge of GIPCL. After obtaining stage
wise clearance including surface preparation, contractor should proceed for
3. Paint has to be applied uniformly over the surfaces. Contractor shall also
ensure that humidity in the weather shall be less than 60%age during
application of paint.
4. Shelf life of paint shall be minimum 06 months at the time of application.
5. Contractor shall take care for spatters and spillage of Floor area and other
structure, piping and Equipment etc. All the spatter and spillage area cleaning
will be in the scope of contractor.
6. All the consumables like wire brush, painting brush, container for handling the
paint, cloth if required for cleaning the surface etc. and Manpower with other
resources are in Contractor’s scope.
7. Scaffolding material and arrangement if required for painting at different
elevations shall be in Contractors’ scope.
8. Contractor has to make their sub-store for storing the paints at site. Preserving
the paint, thinner and other material required carryout this work against theft
or pilferage shall remain in the scope of contractor.
9. Contractor has to depute Supervisor(s) from their side for constant supervision
of painting work execution as per specification.
10. Contractor has to take all safety measures and has to follow safety clauses
during the execution of work including providing safety equipments and/or
safety gears/PPEs, full body safety belts, safety shoes, dust masks, helmets,
safety nets, etc. to the workers and copy of safety equipments and safety
gears issue register & gate pass are to be submitted to GIPCL for verification
before taking up the work.
11. The contractor shall possess a valid ‘Permit to work’ duly signed by GIPCL
Shift-In charge from control room during the execution of the job.
12. Painting of structures has to be carried out even during the time when system
is in operation. Hence, experienced supervisor(s) are to be deployed for
supervision of work.
13. Further layer of Paint has to be applied after giving sufficient drying time to
previous layer of paint as per manufacturer’s recommendations.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
14. Contractor has to arrange & get inspected thickness of each coat with the help
of properly calibrated digital Elko meter to the Engineer-in-charge of GIPCL
before proceeding to application of next successive coat. Supply of Elko meter
is in the scope of Contractor.
15. Painting shall be carried out only on thoroughly dry & clean surfaces. Painting
shall be applied evenly. The workmanship shall be of best quality. The
workmanship shall generally confirms to the requirement of IS 1477 (Part-II).
16. The optimum thickness shall be applied by brushing with minimum of brush
marks. The coat shall be allowed to hard dry. The glass from the entire surface
shall then be generally removed and the surface dusted off. At least 24 hours
shall elapse between the applications of successive coats.
17. Further, during the painting work, all the empty drums of primer, paints and
Thinner shall be taken out of plant premises and to be disposed as per
prevailing GPCB norms. Also, the shifting shall be done in the knowledge of
Engineer-in-charge.
Quality Check: -
Contractor shall maintain location wise work done reports in the register and get the
regular signature from concerned GIPCL representative/inspection committee for
cleaning, primer, first coat painting & second coat painting, etc. with thickness
checking at each stage. The same shall be enclosed with bill for payment.
The rate shall be for good finishing work as per minimum coating specified in the
item specifications. However, if the required quality and finishing is not achieved,
contractor shall apply additional coat of paint to get good finishing without any
additional cost to GIPCL. Contractor shall follow the recommendation of
manufacturer without any additional implication to GIPCL.
It is not the intent to specify herein all the works in the scope of this contract. The
scope also includes all works necessary, which are not specifically mentioned here
but required, for effective execution of entire scope of work in all respect within time
bound periods and are deemed to be included in the scope of the CONTRACTOR.
All works shall conform to the specifications, safety norms, legal & statutory
Shading pattern for painting are as below :
Shading pattern for painting of LP piping & CST
1 Red Oxide Primer Bottle Green Sea Green
Shading pattern for painting of supporting structures & other tanks
1 Red Oxide Primer Light Grey Smoke grey
Contractor shall get the shade approved prior supply and application.
1.5 GENERAL SPECIFICATIONS FOR PAINTING:
1. Contractor has to ensure that the different layers of paints are being applied
after being inspected by Engineer-in-charge of GIPCL. After obtaining stage
wise clearance including surface preparation, contractor should proceed for
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
further work. One register shall be maintained by contractor for this purpose and
shall submit the same with bill. Without submission of thickness verification
register with the bill, payment will not be made.
2. Paint has to be applied uniformly over the surface of structures.
3. All the consumables like paint material, wire brush, mechanical tools, emery
papers, painting brush, container for handling the paint, cloth if required for
cleaning the surface, metallic scaffolding, metallic ladders, etc… are to be
arranged by the contractor.
4. To paint at different elevations, contractor has to make arrangement like safety
belt, safety net, fall arrestor, safety life line, helmet etc… for safe working with
preparation of scaffoldings of MS pipes, Metallic Jail, H frames etc... at their own
5. Contractor has to make their own sub-store for storing the paint at site with rigid
platform to avoid soil contamination. GIPCL will not be held responsible for any
theft of materials.
6. Contractor has to depute their full time experienced overall site-in-charge &
independent location wise supervisors for work execution as per specification
and for day to day work planning & coordination with respective department’s
Engineer-in-charge, to obtain day to day location wise work permits, height
permits, to get daily location wise work supervision, quality, maintaining stage
wise work clearance register for each location, to record location wise joint work
done reports/measurements, to prepare location wise separate bills, to prepare
& apply location wise manpower gate pass, to maintain location wise material
consumption report, etc…
7. Contractor has to take all safety measures and has to follow safety clauses as
specified in this document during the execution of work including all good quality
safety equipments & safety PPEs like safety net, fall arrestors, safety life line,
full body double harness safety belts, safety helmets, safety shoes, hand gloves,
dust masks, ear plugs, safety goggles, etc… to the workers and copy of safety
equipments and safety gears issue register & gate pass are to be submitted to
GIPCL for verification before taking up the work.
8. The contractor shall possess a valid ‘Permit to work’ duly signed by GIPCL
during the execution of the job.
9. Painting of structures shall be carried out even when system is in operation.
Hence, experienced supervisors are to be deployed for supervision of work.
10. Further layer of Paint has to be applied after giving sufficient drying time to
previous layer of paint.
11. Contractor has to arrange & get inspected each layer thickness as mentioned
above by the help of digital Alco meter to the Engineer-in-charge of GIPCL
before proceeding to application of next layer. Supply of Alco meter with valid
calibration certificate is in the scope of contractor.
12. Painting shall be carried out only on thoroughly dry & clean surfaces. Painting
shall be applied by brushing only. The workmanship shall be of best quality. The
workmanship shall generally confirm to the requirement of IS 1477 (Part-II).
13. The type of paint, thickness of dry film, number of coats etc… shall be as
specified in the item of work.
14. All the surfaces shall be thoroughly cleaned from oil, dirt, dust, rust, stains and
scale. The method of cleaning shall be by using solvents as per
recommendation of manufacturer, wire brushing, power tool cleaning etc. and
as indicated in the item of work.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
15. The optimum thickness shall be applied by brushing with minimum of brush
marks. The coat shall be allowed to hard dry. The coating shall be done in such
a way that there should not be any dots, brush marks and spillage marks on the
painted surface. At least 24 hours shall elapse between the applications of
successive coats.
16. Quality Check: -
Contractor shall maintain location wise work done reports in the register and get
the regular signature from concerned GIPCL Engineer for cleaning, applying
primer, first coat painting & second coat painting with thickness checking at each
stage. The same shall be enclosed with bill for payment.
17. Contractor shall ensure proper utilization of paint and avoid wastage like
spillage. Approved paint material received & consumption thereof for painting
the structure shall be almost match as per recommendations given by
manufacturer. Contractor shall have to maintain the register for the receipt of
paints and consumption thereof and same may be verified by Engineer-in-
charge. Contractor shall also keep records of paint inward and same may be
verified by Engineer-in-charge for reconciliation of materials inwards and actual
18. The paint shall be applied as per guideline & specifications given as above for
good finishing. However, if finishing is not achieved as per requirement,
contractor shall have to apply additional coat of paint to get good finishing
without any additional cost to GIPCL.
19. Identification of the Equipment/structure after Painting:-
All the equipments/structures offered for painting in the scope of work is clearly
identified for the details like numbering & labeling, etc. This identification form
vital information for operation personnel for system operation. This identification
which is to be noted before starting the work is to be repainted by a skilled
painter with similar black paint over yellow painted background having a black
border or as directed by Engineer-in-charge. The supply of black & yellow
colored paints for identification of equipment/structures shall be in scope of the
Contractor and will not be provided by GIPCL.
20. Contractor shall follow the recommendation of manufacturer without any
additional implication to GIPCL.
The scope of work also includes all works necessary, which are not specifically mentioned
here but required, for effective execution of entire scope of work in all respect within the
scheduled time. All works shall conform to the specifications, safety norms, legal & statutory
1.6 PAINT MATERIALS FOR STRUCTURAL STEEL
All painting material shall be of following approved make industrial paint as
per respective item specifications under package wise SoR, which includes;
a. High Build self-priming epoxy primer (Composition: Modified epoxy,
cured with polyamidoamine).
b. Acrylic Polyurethane paint (Composition: Acrylic resin with urethane
hardener suitably pigmented, cured with Polyisocyanate).
c. High Build ZP Primer.
d. Luxol Hi Gloss Synthetic Enamel paint.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
A. Makes for High Build self-priming epoxy primer and Acrylic Polyurethane
paint shall be either of following;
“BERGER” make Protectomastic Self priming High Build coating with
BR PU High Glossy Enamel or “ASIAN PAINTS” make Rust o Cap with
Apcothane CF 678 or “Jotun” make Jotamastic 80 with Futura Classic
or “Kansai Nerolac” make Nero mastic 400 I with Nerothane 1000 or
“AkzoNobel” make Interseal 547 with Interthane 990 or “JSW” make
ColourDur P202 ST Epoxy with ColourDur T200 PU HB paint system
shall be used only after prior approval of GIPCL.
Thinner shall be used for dilution purpose as per manufacturer’s
specifications/recommendations and of same manufacturer as of paint
& primer (Thinner T14 NPC for Protectomastic primer and Thinner
B. Makes for High Build ZP Primer (BP) & Luxol Hi Gloss Synthetic Enamel paint
shall be either of following;
“BERGER” make Bison High Build Zink Phosphate Grey Primer (BP)
with BP High Gloss Synthetic Enamel Paint confirming to IS: 2932 or
equivalent paint of “ASIAN PAINTS” make Apcomin Industrial Zink
Phosphate Grey Primer with Apcolite Synthetic Enamel or “Jotun”
make Penguard E20 with Pilot II or “Kansai Nerolac” make High Build
Zink Phosphate Grey Primer with NSE Synthetic Enamel or
“AkzoNobel” make Intergard 251 with Interlac 665 or “JSW” make
ColourDur P204 ZP Primer with ColourDur T202 Enamel paint system
shall be used only after prior approval of GIPCL.
Thinner shall be used for dilution purpose as per manufacturer’s
specifications/recommendations and of same manufacturer as of paint
& primer (Thinner 800 shall be used for dilution purpose for Bison HB
ZP primer and Luxol Hi Gloss Synthetic Enamel paint as per
manufacturer’s recommendation).
C. Makes for hybrid polymer Anti Corrosive, Heat Resistant (up to 2000 C), self-
priming & fast drying coating shall be of following;
“STANVAC” make 2050-POLYHYB Hybrid, Co-Polymer, Cross Linked
“Liquid Plastic” Anti-Corrosion Coating which is to be diluted (if
required) using “205 POLYHYB DILUENT only as per manufacturer’s
recommendation or “Jotun” make Epoxy HR shall be used only after
prior approval of GIPCL.
Contractor will also be allowed for other similar equivalent makes of paint materials
from other reputed brands on sole discretion of GIPCL, for which, contractor should
propose equivalent brand along with manufacturer’s credential, client’s
performance certificates, valid material test reports, technical equality comparisons,
etc… for similar Industrial use / in Thermal Power Plants / PSUs (industries) and
same should be submitted with Technical Bid for GIPCL’s review to obtain advance
approval from GIPCL. GIPCL will review the credential & client’s performance
certificates in Industrial use for approval purpose. However, approval or rejection
will be at the sole discretion of GIPCL without giving any reason and will be bound
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
to the bidder/contractor. Also, even after approval, in view of GIPCL, if performance
of other brand material not found satisfactory then contractor shall stop using it and
shall continue the scope of work with above specified brands of materials only.
Contractor has to maintain record of each and every material brought to site with
material test certificate and gate entry.
Contractor shall arrange to get joint inspection of the procured paint material along
with the concern Engineer-in-charge after the same is inward in GIPCL and the bill
/ challan of the same shall be the stamped and signed by Security personnel present
at gate. Further, this bill / challan shall be enclosed with the Invoices when submitted
as per the “Terms of Payment”. GIPCL may verify the reconciliation of paint
materials supplied at GIPCL-SLPP with respect to work executed based on
manufacturer’s standard consumption factor. Any major variation shall not be
Contractor shall keep up to date material inward records and consumption record
of his materials. Contractor shall follow manufacturer’s recommendation for
required mix proportion of material at site. The material should be applied in
accordance with the manufacturer’s technical datasheet including surface
preparation, mixing, placing, applying, curing, etc… complete as per manufacturer’s
instructions and as directed by Engineer-in-charge.
Contractor shall deploy & provide sufficient nos. of manpower, full time experienced
supervisors for supervision of work, providing & fixing metallic scaffolding, ladders,
arrangement of platform for working at height, safety belts, fall arrestors with safety
life line, safety net (at required places as directed by Engineer-in-charge), safety
shoes, goggles, dust masks, helmets, hand gloves, etc… with standard applicable
tools & tackles, sufficient nos. of lighting equipments, power cables of sufficient
length with extension board (all portable power tools should be equipped with
ELCB/RCCB) according to site requirement & fulfilling electrical safety norms,
sufficient cleaning equipments like blower and any other incidental activities or
works which are not envisaged but likely to be carried out for satisfactory & timely
completion of entire scope of work as directed by Engineer-in-charge.
The specified material/compounds should be applied in accordance with the
manufacturer’s technical datasheet including surface preparation, mixing, placing,
applying & curing. This consists of surface preparation by thoroughly cleaning of
dirt, dust, rust, old paint (to the maximum extent up to satisfaction of Engineer-in-
charge), scraping by wire brushing or power tool cleaning, blower cleaning (at
corners & junctions), etc… complete as per site requirement and as per detail
technical specifications / item nomenclature.
The scope of work also includes removal of all debris, unwanted materials, scrape
materials, empty containers, etc including loading, unloading, shifting and disposal
outside the plant premises as per applicable GPCB norms.
Where any specifications of manufacturer are repugnant to or at variance with any
provisions and/or specifications mentioned in this document, then unless a different
intention appears, the provision and/or specifications mentioned in this document
shall prevail to the extent of such repugnancy of variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Third party testing:-
Contractor shall arrange third party testing of paint materials supplied at GIPCL-
SLPP for jointly collected random samples of paint materials as directed by
Engineer-in-charge. All cost towards testing shall be borne by the contractor. The
testing laboratory shall be as decided by GIPCL.
1.6.1 SAFE STORAGE OF MATERIALS
Contractor shall make all arrangement including construction of safe storage of all
paint materials, scaffolding, consumable items, tool & tackles, equipments, PPEs,
etc.. Contractor shall be responsible for safe storage and security of all his
belongings including paint materials, scaffolding, consumable items, tool & tackles,
equipments, PPEs, etc… whatsoever and may depute full time guard for the security
of all the items / materials to avoid pilferage, loss, damage & theft and he shall be
responsible for safety & security. In any case, GIPCL will not be responsible for
security & safety of items / materials / effects of contractor.
1.7 DISPOSAL OF EMPTY PAINT BARRELS
Contractor shall be responsible for removal and disposal of all the empty drums /
paint barrels / packings as per prevailing GPCB norms outside GIPCL premises on
every six-monthly basis. GIPCL will not be held responsible for any subsequent
consequences regarding improper disposal of empty drums/barrels by the
Contractor shall be required to submit written undertaking as per format provided in
Annexure-J of enclosed Section-F on every six-monthly basis as well as along with
the final bill that all the empty paint/primer/thinner drums are disposed off at outside
plant premises at designated location as per prevailing Government guideline and
contractor shall indemnify, keep harmless the GIPCL against any future liabilities or
consequences in this regard. Contractor’s final bill shall be processed only after
written confirmation & compliance for disposal of all such empty drums, containers,
other scrapes, etc… to outside premises in accordance with prevailing GPCB norms
based on submission of letter of undertaking by the contractor and certificate from
Engineer-in-charge along with final bill.
1.8 GENERAL SCOPE OF CONTRACTOR
1. All tools & tackles, equipments, grinder machine, scaffoldings, materials, labour,
vehicles, etc… to execute the contract will be in the scope of the contractor. The
contractor should ensure for healthiness/working conditions of tools, tackles &
2. All consumable items like paint materials, thinner, turpentine, red oxide, cloth,
cotton waste, kerosene, gas, diesel, lubricants, Flap Disc Buffing wheels etc.
will be in the scope of the contractor.
3. The Contractor shall have to make necessary arrangement for storage of
materials including safe storage of paint materials, tools & tackles, scaffolding
materials, equipments at their own cost.
4. All safety/PPEs required during work at site are to be arranged by the contractor.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
5. The Contractor shall have to provide necessary facilities including
accommodation for their labour at their own cost.
6. The contractor has to arrange transportation for lifting/shifting the materials at
7. Contractor has to depute their full time experienced site-in-charge &
independent Location/Package wise supervisors for work execution as per
specification and for day to day work planning & coordination with respective
department’s Engineer-in-charge, to obtain day to day Location/Package wise
work permits, to get daily location wise work supervision, to record
Location/Package wise joint work done reports/measurements/certification, to
prepare Location/Package wise separate bills, to prepare & apply
Location/Package wise manpower gate pass, to maintain Location/Package
wise statutory & legal compliance records, etc…
8. Contractor has to maintain record of each and every material brought to site
with material test certificate and gate entry.
9. Contractor has to submit quality plan prepared jointly with authorized
representative of approved manufacturer.
1.9 PLANNING & MONITORING OF WORK PROGRESS
1. After award of the work, Contractor has to submit schedule of work planning for
completion of painting work with resources (i.e. manpower and material)
mobilization planning within seven days.
2. Contractor shall mobilize the resources at site within 07 days from the date of
LoI or work order whichever is earlier. GIPCL will closely monitor the agreed
schedule against actual progress of work at site. If contractor failed to carry out
work as per agreed schedule and if contractor failed to mobilize required
resources (manpower & materials) within seven days from written
communication, GIPCL will execute the job through other agency at the risk and
cost of the contractor with additional 10% overhead charges including GST.
3. The owner of contractor / proprietor / partner should be present for periodic
progress review meeting & for further planning at office of GIPCL Surat Lignite
Power Plant as desired by Engineer-in-charge (probable on monthly basis).
It is not the intent to specify herein all the works in the scope of this contract. The
scope also includes all works necessary, which are not specifically mentioned here
but required, for completion of entire scope of work in all respect within time bound
period and are deemed to be included in the scope of the CONTRACTOR. All works
shall conform to the specification. The works shall conform to high standards of
quality and workmanship.
2.0 PRICE & RATES
This is SoR based contract and final item rates will be derived based on final offered
lowest price received through e-Reverse Auction on gross total price (including
GST). Pro-rata reduction will be applied in the quoted price for all the items of SoR
(Section-E) after price discovery through e-Reverse Auction. The item rates so
derived shall be inclusive of cost of all labours, manpower (skilled painters, semi-
skilled, unskilled / helpers, experienced supervisors & site-in-charge), approved
make paints, primer, thinner, other required materials as recommended by
manufacturer, consumables, safe storage of materials & belongings, wastage,
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
supervision, cost of safety supervisor, shifting, transportation, loading, unloading,
equipment, machinery, fuel, ladders, ropes, tarpaulin, material handling containers,
Item rates also includes cost towards all required tools & tackles, Flap Disc Buffing
wheels with grinder machines, power tools & tackles, lighting equipments, relevant
power supply cables with extension boards having approved electrical safety
arrangements, standard approved MS scaffolding materials, scaffolding
arrangement at work site as per approval of GIPCL’s Safety Officer, safety
equipments & all safety PPEs like but not limited to standard approved safety shoes,
full body double harness safety belts, safety helmets, safety net, fall arrestors, dust
masks, safety goggles, etc…, providing site safety arrangements, legal & statutory
compliances. The rates also include all applicable taxes, duties, royalties, rents,
stamp duties, and other statutory levies imposed by Central, State, Local, or
Municipal authorities (Note: Item rates exclude GST, which is accounted for
separately at 18% in the total estimated SoR value), minimum wage rates to
workmen and such other costs that are not specifically mentioned herein but will be
incurred by the contractor for the satisfactory and timely completion of the scope of
works as per specifications and terms & conditions of this tender inquiry.
The whole item rates shall be deemed to include for everything mentioned in the
specification, all leads & lifts, contractor’s overheads & profits for due performance
of the work under this contract and such other costs that are not specifically
mentioned herein but will be incurred by the contractor for the satisfactory and timely
completion of the work. The rates shall also include cost for mobilization /
demobilization of manpower, equipments, materials, etc... as per work requirement.
The prices / item rates so derived based on final recovery of lowest offer from Bidder
shall remain firm till completion of the entire contract period and also during
extensions thereafter (if required & approved by GIPCL). GIPCL will not entertain
any escalation towards labour rates, material rates, fuel rates and whatsoever due
to any reason and also no idle charges for manpower, machinery, tools & tackles,
equipments & scaffolding, overhead expenses, etc... due to any reason whatsoever.
No price escalation / idle charges shall be payable due to delay in work by contractor
or due to unavailability of work front by GIPCL or holding of work permit for time
being due to unsafe working & violation of contract terms/specifications or any other
reason whatsoever.
Contractor shall at his expense comply with all labour & industrial laws and such
other acts & statutes as amended from time to time as may be applicable to this
contract in respect to pay etc... On account of any default in respect of all liabilities
and in case of non-compliance of the above, the company can withhold contractor’s
payments till all legal liabilities are discharged.
The offered price shall be considering mobilization of all required manpower, tools
& tackles, materials, equipment, vehicles, consumables, etc… for timely and
satisfactory completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
actual requirements to achieve desired result by Engineer-in-charge. However, item
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
rates & total order value remains unchanged and the payment shall be made as per
the actual quantity executed as informed & certified by GIPCL representatives.
3.0 CONTRACT PERIOD
Contract period will 15 (fifteen) months from the date of issue of LoI or Work Order
whichever earlier (except 03 months of peak Monsoon, i.e. July, August &
The contractor period is excluding peak monsoon period during July to September.
Exposed/unconfined Structural painting may not be allowed during monsoon
season and contractor should mobilized resources accordingly to complete the
entire scope of work in available working contract period. Mobilization period will be
07 days from the date of issue of LoI or Work Order whichever earlier.
After award of contract, the contractor should have instant kickoff meeting with
package wise concern department heads at SLPP and finalize the work completion
schedules for each package which includes manpower mobilization schedule (in
terms of daily nos. of manpower deployment chart), approval of make, type & shade
of material for each item of every package, resource & material planning with
mobilization schedule, location/area wise & item wise micro planning by indicating
start date to end date for each & every activity. These schedules shall be prepared
& signed jointly as joint protocol.
One copy of package wise work planning protocol shall be submitted to concern
department head and same shall be adhered strictly to complete the scope of work
as per jointly decided work schedule. GIPCL will monitor the work progress on daily
basis with respect to these jointly finalized work schedules and if it is found that the
progress is not being achieved at site in line of planned schedule then GIPCL will
inform the facts to the contractor and will deploy other agency to cover-ups any such
backlog of progress at the risk & cost of contractor with additional 10% overheads
In order to complete the works timely as per approved completion schedule,
contractor shall mobilize sufficient nos. of manpower & required material, resources,
tools & tackles etc at all the package locations simultaneously, including
independent site supervisors.
Contractor shall have no any right for time extension or compensation or price
escalation on account of some delay in handing over of particular front by the GIPCL
due to unavoidable circumstances. However, GIPCL, at sole discretion, may grant
only time extension at the same rates, terms & conditions against the justifications
submitted by the contractor in writing.
4.0 TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the location (Package) wise separate running invoices in
duplicate (one original in physical form and soft copy in MS Excel format as directed
by Engineer-in-charge) every month to concern Engineer-in-charge of respective
Package/Location in respect of the work performed or completed during the month
/ since last, along with the documents as provided hereinafter. On receipt of the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
invoice complete in all respects and with all the said documents, the payment in
respect of the same shall be made within 21 days of such receipt of a complete
invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against
the work executed duly certified by GIPCL. Income Tax (IT) will be deducted
at source from monthly RA bills as per the rules in force.
(ii) Contract Security deposit/irrevocable PBG at 10% of contract value
(excluding GST) shall be submitted as per clause no.: 1 of Section-C.
(iii) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority
(to be furnished only once).
(b) Citing the GST Registration no., HSN Code and the date of issue of
registration certificate on invoices.
(c) Citing GIPCL’s GST no. along with contractor’s GST registration no.
and the date of issue of registration certificate on invoices.
(d) Claim of GST amount with percentage (%) separately shown on the
(e) The contractor shall be required to submit the proof of payment of GST
of previous month/quarter, as may be applicable as & when demanded
by GIPCL/Owner/company.
(f) Contractor shall inform the GIPCL in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(g) The contractor shall also mention on their invoice the HSN/SAC code
as applicable under the GST laws under which GST is levied and a self-
certified authentic third-party evidence (www.cbic-gst.gov.in) shall be
adduced to that effect by the contractor.
(iv) At the time of submission of the first RA Bill, the Contractor shall submit a
certificate from Engineer-in-charge regarding availability of tools & tackles,
equipments, etc at site as desired by GIPCL. The Contractor shall also
furnish the checklist as per Annexure-A enclosed with the Section-F of
tender document along with the RA bill of respective month as applicable.
(v) While making running account payment, the following deductions may be
made by GIPCL, if applicable:
a. Cost of materials issued, if any, by GIPCL and to the extent consumed in
b. Security deposit recoverable if any.
c. Advance on materials / work progress advance payments, if any.
d. LD/Penalty for delayed delivery, penalty for delayed execution of work,
recovery of charges for the work done by other contractor due to delay or
any other reason, if applicable
e. Any other dues recoverable by GIPCL from the contractor under the
(vi) The contractor, along with monthly RA/final bill shall submit copies of P.F.
Challan, wages register, attendance sheet & ECR statement indicating the
employee and employer’s P.F contribution with respect of employees
employed by him for the contract at GIPCL site along with format for
submission of these documents provided in Section-F (Annexure-I).
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
(vii) The Contractor shall submit his Final Bill within a period of four months of
the expiration or earlier termination of the contract or any extensions that
may be granted by GIPCL to the Contractor. GIPCL shall not entertain any
bill for any work item after expiration of period of four months. After the final
bill amount is certified by GIPCL for payment and the same is made known
to the contractor by GIPCL & accepted by contractor, “No claim – No
arbitration certificate” to be submitted to GIPCL to release the Final Bill.
(viii) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to
have waived any claims not mentioned in the Final Bill and shall not be
entitled to recover the same from GIPCL subsequent to the submission of
the Final Bill on any account and GIPCL shall stand absolved of all its
liabilities in respect of any such claims not raised by the Contractor in his
B. Validity and Uniformity of Rates
The rates shall be valid for the Contract Period and agreed extension and shall
remain unaltered during the Contract Period.
5.0 SCOPE OF GIPCL
Available Electric power, water & air shall be provided free of charges at any one
point nearer to work site as convenient to GIPCL. Contractor shall make his own
arrangements for drawl and distribution to the work site. Before drawl of such
energy, contractor shall take prior permission of the same.
However, due to unavoidable circumstances or any other reason whatsoever, on
unavailability of power supply or water, contractor shall proceed with the scope of
work by making own alternate arrangements without any extra cost to GIPCL.
GIPCL will not be held responsible for the delay, interruption or denying for power
supply and water due to any reason whatsoever.
6.0 TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the
acts of the GIPCL, or if defects not readily detected by proper inspection shall
develop before the final completion and acceptance of the whole work, the
CONTRACTOR shall forthwith make good, without compensation, such damage or
defects in a manner satisfactory to the ENGINEER / GIPCL. In no case shall
defective or imperfect work be retained even if contractor followed all technical
specifications. GIPCL will not compromise for quality of materials, works &
CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise or
the passing of any accounts.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
7.0 DAILY DIARY AND PROGRESS REPORT
A daily diary register shall be kept in the ENGINEER’S office. The CONTRACTOR
will supply all detailed information every day at 9:00 hours for the day preceding
and the diary will be jointly signed by the ENGINEER and the CONTRACTOR’S
representatives, every day in token of its correctness. A works instruction book,
serially numbered shall also be kept in the ENGINEER’S office and all day to day
instructions will be given in that book. The CONTRACTOR’S representative shall
report every day to see these instructions and sign them at the bottom in token of
his having seen them.
The CONTRACTOR shall supply all information regarding procurement of materials
and progress of work, as is required by the ENGINEER for compiling the weekly
progress reports. This information shall be supplied by 9:00 hours on every Monday,
for the preceding week.
8.0 JOINT MEASUREMENT RECORDING & MODE OF MEASUREMENT
Measurement of steel structures shall be in Sqm (M2) correct to three place of
decimal. The measurement shall be on Sqm of actual GIPCL certified painted /
coated surface area only as per given scope of work & specifications. Rate shall be
inclusive of all enabling works such as scaffolding and other works as specified in
tender documents.
Payment shall be made based on joint measurements of all the actually executed
works at site as per given scope of work and completed as directed by GIPCL.
Actual measurements of executed works as per scope shall be carried out jointly
with GIPCL’s Engineer-in-charge concern and contractor’s representative.
(i) M.S. Grill / Grating / Chequred Plate Painting:- Area shall be measured for
Grill / Grating / Chequred Plate size i.e. if size is 0.60M X 1.20M and painted
both side of total area, payment will be made considering out to out size for
Grill / Grating (i.e. 1 X 0.60M X 1.20M) and for chequred plate, if both side
painted, actual area will be measured for both sides. No co-efficient shall be
(ii) M.S. Pipe Railing Painting:- It shall be measured in single side area in Sqm of
railing (length & height) and will be paid for 50% of measured area in Sqm for
painting of railing in all respect. i.e. if size of railing is 50M (Length) x 0.80M
(Height) and painted both side of total railing area i.e horizontal and verticle
pipes with toe guard, payment will be made as 0.50 X 50M X 0.80M.Quantities
specified are estimated quantity and payment will be made on the basis of
actual joint field measurements of work done.
In order to carry out joint measurement recording at site, contractor shall provide
following facilities & arrangements at site for GIPCL’s Engineer-in-charge.
(1) Proper approachable safe scaffolding with ladders, standard hand rails &
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
(2) Arrangements of required safety PPEs like but not limited to standard approved
double harness safety belts, safety goggles, fall arrestors, safety net, hand
(3) Contractor shall also provide one Engineer along with two or three assistant
helpers to GIPCL’s concern Engineer-in-charge during joint measurement
recording. Contractor’s Engineer & helpers shall assist and follow the
instructions of GIPCL’s concern Engineer-in-charge for safe measurement
recording of every completed scope of works.
(4) Necessary standard & calibrated valid measuring devices like but not limited to
measuring tape, Alco meter & other required tools & tackles.
(5) Any other site-specific arrangements or requirements as directed by Engineer-
in-charge concern.
The payment will be done according to actual work carried out as per joint
measurement by contractor & GIPCL Engineer-in-charge for structural steel
quantity in M2 (square meter) as specified in respective item, up to three decimal
place. The measurement will be as per the unit of measurement specified in
respective item description.
Timely joint measurement recording shall be responsibility of contractor by deputing
their full-time engineer.
It is desirable to complete the joint measurement recording of completed works on
monthly basis or as per schedule provided by concern Engineer-in-charge.
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer in-charge shall be final and binding to you.
9.0 SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for
verification purpose of the bill:-
(i) Measurement sheet (as per mode of measurement) along with joint
record of work done in the form of joint inspection report duly signed
by authorized representative of contractor and GIPCL Engineer.
(ii) Contractor’s material incoming challans/bill of materials duly stamped &
signed by plant gate security.
(iii) Contractor’s supplied material test certificate/reports/MSDS as directed by
Engineer-in-charge.
The bill will not be entertained without submission of above documents.
10.0 SUBMISSION OF STATUTORY COMPLIANCES WITH EACH BILL
Contractor shall submit the bills of work carried out along with following documents.
(i) Copy of statutory compliance like labour license, wages payment register, EC
Policy, PF paid Challan with ECR, TRRN confirmation by EPFO/Bank, Bank
statement, etc… along wage certificate pertaining to respective bill period /
previous month of bill period with Annexure-I provided in Section-F.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
(ii) Notarized Indemnity Bond in case of Final bill.
(iii) No claim – No arbitration certificate as per Performa (Annexure-D in Section-F),
after the final bill amount is certified by GIPCL for payment and the same is
made known to the contractor by GIPCL & accepted by the contractor.
Bill submitted without any of the above applicable documents shall not be processed
11.0 MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 03 days from the time
of intimation given by GIPCL during any emergency painting requirements.
b) Contractor shall provide independent site supervisor who will be responsible
for supervision and execution of job in specified time with respect to quality,
specifications, site preparations, safety, coordination with GIPCL, issue of
work permits, joint measurements, etc... The supervisors shall coordinate
with the Engineer-in-charge of GIPCL for proper execution of the job.
c) The resources required for execution of above jobs will vary from time to
time, hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him
for the work at his own cost.
12.0 DEFECT LIABILITY PERIOD
The defect liability period of whole work shall be 01 (one) year from the date of
completion and acceptance of the work, as certified in writing by the Engineer-in-
During defect liability period, if any defect arises in jobs which have been already
executed, shall be rectified by the contractor at free of cost within seven days on
receiving the intimation from Engineer-in-charge failing which GIPCL may take
suitable action and also engaged third party to carry out rectification work at the risk
and cost of the contractor.
13.0 QUANTITY OF WORK
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period
based on plant operational & maintenance requirements as well as extent of
deterioration of structure taken up for painting in this contract as directed by
Engineer-in-charge.
Contractor shall not be entitled for any compensation on ground of such alteration
in given estimated quantities within overall limits of awarded contract price. GIPCL
reserves the right to operate or increase/decrease quantities in each item or omit
any item included in Schedule of Quantity at its discretion. Contractor shall have no
claim, whatsoever, on grounds of loss of anticipated profit etc. on account of the
Clause No. 24 of Section-A (Instructions to Bidders) shall be prevailed.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
14.0 GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders
are advised to go through the same. Where any portion of the general conditions of
contract is repugnant to or at variance with any provisions of the special conditions
of contract, then unless a different intention appears, the provision of the special
conditions of contract shall prevail to the extent of such repugnancy of variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
SCHEDULE OF QUANTITIES & RATES
PACKAGE-I (UNDER CIVIL DEPARTMENT)
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount (Rs.)
1 Providing and applying one coat of
minimum 100 micron DFT High Build
self-priming epoxy primer (Composition:
Modified epoxy, cured with
polyamidoamine) and two coat of high
performance Acrylic Polyurethane high
glossy finish paint (Composition: Acrylic
resin with urethane hardener suitably
pigmented, cured with Polyisocyanate)
of total minimum 50 micron DFT of
approved colour shade (gross total
minimum DFT shall be 150 micron), as
per manufacturer's recommendations,
on structural steel including preparation
of surface by thoroughly cleaning of oil,
dirt, dust, rust & scale by wire brushing,
power tool cleaning, mechanical
scrapers, etc... & final surface cleaning
with cotton waste before application of
primer (in case of application of primer is
delayed due to any reason, the surface
preparation shall be re-done at no extra
cost to GIPCL), including providing
approved standard scaffolding with MS
pipes & clamps, covering the
surrounding areas with plastic
sheet/tarpaulin wherever required,
adhering to all safety requirements, etc...
as directed by Engineer-in-charge and
as per manufacturer's detail technical
specifications with all materials, labour,
tools & tackles, standard safety tools &
tackles, standard safety PPEs, etc….
complete at all elevations for Boiler
Unit-4 up to 50 meter height from
average ground level including staircase
structures, hand railing, etc… complete.
Payment will be made at actual joint
site measurements of completed
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount (Rs.)
2 Same as above item no. 1 but for
structural steel of Phase-II Highrise
Chimney internal steel structures.
Payment will be made at actual joint
site measurements of completed
3 Same as above item no. 1 but for
structural steel of Phase-II / Phase-I
Cable Rack (along DM Plant, Chimney &
ID ducts, etc). Payment will be made at
actual joint site measurements of
completed works.
4 Same as above item no. 1 but for
structural steel of Phase-II "A" row of
TG Building (mainly major steel
columns & bracings GF and FF) and
few corroded structures in Air
Washer Room (Unit-3 & 4) which 3000.00 Sqm 295.68
includes columns, beams, bracings,
trestles, plates, staircase structures,
hand railing, etc… complete. Payment
will be made at actual joint site
measurements of completed works.
5 Same as above item no. 1 but for
structural steel of Unit-3 & Unit-4
Deaerator Structure. Payment will be 500.00 Sqm 295.68
made at actual joint site
measurements of completed works
6 Same as above item no. 1 but for
structural steel of Patna Intake well
bridges (exposed struct.), Patna
Intake-well bridge steel plates
(exposed struct.), Kakra Khadi Bridge
steel structure and KRBC canal
crossing bridge steel structure.
Payment will be made at actual joint
site measurements of completed
7 Same as above item no. 1 but for
structural steel of Ph-I "A" row of TG
Building (mainly major steel columns
& bracings GF and FF) which includes
columns, beams, bracings, trestles, 1500.00 Sqm 295.68
plates, staircase structures, hand railing,
etc… complete. Payment will be made
at actual joint site measurements of
completed works.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount (Rs.)
8 Same as above item no. 1 but for entire
structural steel of Unit-1 & Unit-2 ID Fan
structure. Payment will be made at 3000.00 Sqm 295.68
actual joint site measurements of
completed works.
9 Same as above item no. 1 but
miscellaneous steel structures of
SLPP & associated area. Payment will 2500.00 Sqm 295.68
be made at actual joint site
measurements of completed works.
10 Providing and applying one coat of
minimum 40 micron DFT High Build ZP
Primer and two coats of High Gloss
Synthetic Enamel paint, each coat of
minimum 25 micron DFT of approved
colour shade on structural steel
including preparation of surface by
thoroughly cleaning of oil, dirt, dust, rust
& scale by wire brushing, power tool
cleaning, mechanical scrapers, etc... &
final surface cleaning with cotton waste
before application of primer (in case of
application of primer is delayed due to
any reason, the surface preparation
shall be redone at no extra cost to
GIPCL), including providing approved
MS pipe scaffolding with clamps, safety
nets, cherry packers, covering the
surrounding areas with plastic
sheet/tarpaulin wherever required, etc...
as directed by Engineer-in-charge and
as per manufacturer's detail technical
specifications with all materials, labour,
tools & tackles, standard safety tools &
tackles, standard safety PPEs, etc….
complete at all elevations for structural
steel of warehouse and various
godowns. Payment will be made at
actual joint site measurements of
completed works.
11 Same as above item no. 10 but
miscellaneous steel structures of
SLPP & associated area. Payment will 2500.00 Sqm 190.10
be made at actual joint site
measurements of completed works.
Total SoR Amount without GST >>>
Total estimated value with 18% GST >>>
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PACKAGE-II (ELECTRICAL DEPARTMENT)
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
1 Providing & applying one coat of red oxide
primer and two coats of synthetic enamel paint
with spray on outer surfaces of various electrical
equipments including noting the equipment
identification nos. prior to starting of work and
shall be written back by skilled painter with black
oil paint over yellow back ground after painting
work, surface preparation by thoroughly
cleaning of oil, dirt, dust, rust & scale by wire
brushing, emery paper, power tool, entire
transformer & bus duct body should be cleaned
by blowing air, rubbed with clean cloth followed
with kerosene soaked cloth so as to de-grease
& remove any oil stains and then clean with soap
solution, final surface cleaning with cotton waste
(clearance should be obtained from Engineer-in-
charge before starting primer. In case of
application of primer is delayed due to any
reason, the surface preparation shall be redone
at no extra cost to GIPCL). Wherever erosion is
observed due to rusting of metal (especially on
transformer radiators) the same should be first
smoothened by application of Lapi. Scope 1915.000 Sqm 190.10
includes providing approved MS pipe
scaffolding with clamps, covering the
surrounding areas with plastic sheet/tarpaulin as
required. The site of transformer may have
airborne particles. The transformers should
therefore be covered with polythene/plastic
sheet to protect the painted surface from settling
of foreign particles. Protect the name plate
details and other details which forms important
history for the equipment. The paint should be
wiped off immediately over such name plates
when the primer/paint is wet. All works complete
as directed by Engineer-in-charge and as per
manufacturer's detail technical specifications
with all materials, labour, tools & tackles,
standard safety tools & tackles, standard safety
PPEs, etc…. complete at all elevations for
following equipments:-
Painting of 150 MVA, 220/10.5 KV Generator
transformer with all accessories & fitments as
per tender Specification including all
identifications (1 No. at GT-2 area).
2 Same as above for Painting of 1250 KVA,
6.6/0.433KV transformer with all
accessories & fitments alongwith its bus
duct and bus-duct support as per tender
Specification including all identifications
(3 Nos. at AHS area).
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
3 Same as above for Painting of 1600 KVA,
6.6/0.433KV transformer with all
accessories & fitments alongwith its bus
duct and bus-duct support as per tender
Specification including all identifications
(4 nos. at Mines End F/B area).
4 Same as above for Painting of 1600 KVA,
6.6/0.433KV transformer with all
accessories & fitments alongwith its bus
duct and bus-duct support as per tender
Specification including all identifications
(4 nos. at Main Plant ESP area).
5 Same as above for Painting of 2000 KVA,
6.6/0.433KV transformer with all
accessories & fitments alongwith its bus
duct and bus-duct support as per tender 540.000 Sqm 190.10
Specification including all identifications
(1 No. at LLHS area).Four nos main plant
6 Same as above for Painting of 400 KVA,
6.6/0.433KV transformer Enclosure with
all accessories & fitments as per tender 30.000 Sqm 190.10
Specification including all identifications
(3 Nos. at S/R Machines with NGR).
7 Same as above for Painting of 96 KVA,
433V/45KVDC rectifier-transformer with
all accessories & fitments alongwith its
bus duct and bus-duct support as per
tender Specification including all
identifications.
8 Same as above for Painting of Cable tray
rack structure BC Gallery, ESP & Boiler 600.000 Sqm 190.10
(Phase-1, Main Plant)
9 Same as above for Painting of Panels at
LLHS-AHS (Marshalleing Panel, Control
Panel, ACDB, MLDB, RPG Panel, 4000.000 Sqm 190.10
Lighting Panel, Scoop Panels, S/R
Center Pit JB, Welding Panels etc.)
10 Same as above for Same as above for
Painting of In plant Lighting Tower in 500.000 Sqm 190.10
LLHS area and street lighting pole
11 Same as above for Painting at CW MCC
Total SoR Amount without GST >>>
Total estimated value with 18% GST >>>
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PACKAGE-III (BoP & TG DEPARTMENT)
Sr. Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
1 Providing and applying one coat of minimum
micron DFT High Build ZP Primer and two coats
of High Gloss Synthetic Enamel paint, each coat
of minimum 25 micron DFT of approved colour
shade on structural steel including preparation of
surface by thoroughly cleaning of oil, dirt, dust,
rust & scale by wire brushing, power tool
cleaning, mechanical scrapers, etc… & final
surface cleaning with cotton waste before
application of primer (in case of application of
primer is delayed due to any reason, the surface
preparation shall be redone at no extra cost to 400.00 Sqm 190.10
GIPCL), including providing approved MS pipe
scaffolding with clamps, safety nets, cherry
packers, covering the surrounding areas with
plastic sheet/tarpaulin wherever required, etc…
as directed by Engineer-in-charge and as per
manufacturer’s detail technical specifications
with all materials, labour, tools & tackles,
standard safety tools & tackles, standard safety
PPEs, etc…. complete at all elevations for
Phase-1 & Phase-2 Boiler ACW Pump Supply &
Return Pipe line (Sea Green Color Code).
2 Same as above for Phase-2 CW Pumps Strainer
cleaning platform structure. (Smoke Grey)
3 Same as above for Phase-1 & Phase-2 CST
tanks outside (Sea Green Color Code).
4 Same as above for Condenser inlets/Condenser
outlets/Service water/ECW/ACW pipe line of 600.00 Sqm 190.10
main plant Ph-1 & 2. (Sea Green Color Code).
5 Same as above for 1 nos. of Phase-2 DM Storage
tank (Aluminum Paint)
6 Same as above for Ph-1 Fire hydrant & spray
system (Signal Red Color) with supports 2000.00 Sqm 190.10
(Smoke Grey) outside plant.
7 Same as above for Phase-1 LHS area Fire
hydrant & spray system (Signal Red Color) with 1000.00 Sqm 190.10
supports (Smoke Grey) outside plant.
8 Same as above for Phase-2 Fire hydrant & spray
system (Signal Red Color) with supports
(Smoke Grey) outside plant & ELHS up to apron
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
9 Same as above for EOT cranes & Structures, PH-
1 & Ph-2 (Golden Yellow Color Code) 500.00 Sqm 190.10
10 Clear water piping from Ash water recovery to
ETP Pond (Sea Green Color Code). 800.00 Sqm 190.10
11 Same as above for application of synthetic paints
on Phase-1 & Phase-2 Caustic Scrubber tanks & 100.00 Sqm 190.10
12 Providing & applying 1 coat of minimum
micron DFT High Build self-priming epoxy primer
(Composition: Modified epoxy, cured with
polyamidoamine) and 2 coat of high performance
Acrylic Polyurethane high glossy finish paint
(Composition: Acrylic resin with urethane
hardener suitably pigmented, cured with
Polyisocyanate) of total minimum 50 micron DFT
of approved colour shade (gross total minimum
DFT shall be 150 micron), as per manufacturer’s
recommendations, on structural steel including
preparation of surface by thoroughly cleaning of
oil, dirt, dust, rust & scale by wire brushing, power
tool cleaning, mechanical scrapers, etc… & final
surface cleaning with cotton waste before
application of primer (in case of application of 300.00 Sqm 295.68
primer is delayed due to any reason, the surface
preparation shall be re-done at no extra cost to
GIPCL), including providing standard MS
scaffolding, covering the surrounding areas with
plastic sheet/tarpaulin wherever required,
adhering to all safety requirements, etc… as
directed by Engr-in-charge and as per
manufacturer’s technical specifications with all
materials, labour, tools & tackles, standard safety
tools & tackles, standard safety PPEs, etc….
complete at all elevations for PH-2 Bulk
Acid/Caustic storage tank (3Nos.) &
miscellaneous tanks of DM Plant. (Smoke Gray
13 Same as above for 5 nos. of Phase-2 Air washer
Fans & Structures. (smoke grey colour).
14 Same as above for 5 nos. of Phase-2 UAF Fans
& Structures. (smoke grey colour).
15 Same as above for 5 nos. of Phase-1 CW Pump
stop log (smoke grey colour).
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Description Estimated Unit Estimated Estimated
No. Quantity Rate (Rs.) Amount
16 Same as above for 3 nos. of Phase-2 CW Pump
stop logs (smoke grey colour). 400.00 Sqm 295.68
17 Same as above for Ph-1 DM Plant miscellaneous
tanks like Bulk Acid storage tank, Bulk Caustic
Storage tanks & structures. (Smoke Gray Color
18 Same as above for Ph-1 Degassed water storage
tank, 2Nos.(Smoke Gray Color Code).
19 Same as above for Ph-1 & 2, Bulk Acid storage
tank at CW forebay. (Smoke Grey). 400.00 Sqm 295.68
20 Same as above for Phase-1 Cooling Tower riser
pipes. (Sea Green Color Code).
21 Same as above for Phase-2 Cooling tower riser
pipes. (Sea Green Color Code).
22 Same as above for Phase-2 Cooling Tower
monorails. (Smoke Gray Color Code).
23 Same as above for Ash water recovery system &
ETP System. (Smoke Gray Color Code).
24 Same as above for Phase-1 & Phase-2 ACW
overhead tank (Smoke Grey Color Code).
25 Phase-1 & Phase-2 Side Stream Filters Tanks.
(Smoke Gray Color Code). 500.00 Sqm 295.68
26 Same as above for Phase-1 & Phase-2 CST
tanks inside (Smoke Gray Color Code).
27 Same as above for Phase-2 PT Plant & EPT
Plant Alum & Poly dosing tanks.(Smoke Gray 250.00 Sqm 295.68
Total Tender Amount of BoP without GST
Sr. Description Estimated Unit Estimated Estimated
No. Quantity Rate (Rs.) Amount
28 Same as above Item No. 1 for Turbine area
Phase-1 250.00 Sqm 190.10
29 Same as above Item No. 1 for Turbine area
Phase-2 250.00 Sqm 190.10
30 Same as above Item No. 12 for Turbine area
Phase-1 250.00 Sqm 295.68
31 Same as above Item No. 12 for Turbine area
Phase-2 250.00 Sqm 295.68
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Description Estimated Unit Estimated Estimated
No. Quantity Rate (Rs.) Amount
32 Heat resistance aluminum paint suitable up to
200 degree Celsius for Turbine area Phase-1 &
as per detailed specifications. Heat resistance 100.00 Sqm 302.02
aluminum paint suitable up to 200 degree
Total Tender Amount of TG without GST
Total SoR Amount without GST for PKG-III >>>
Total SoR Amount with GST for PKG-III >>>
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PACKAGE-IV (BOILER MAINTENANCE DEPARTMENT)
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
1 Providing and applying one coat of
minimum 100 micron DFT High Build self-
priming epoxy primer (Composition:
Modified epoxy, cured with
polyamidoamine) and two coat of high
performance Acrylic Polyurethane high
glossy finish paint (Composition: Acrylic
resin with urethane hardener suitably
pigmented, cured with Polyisocyanate) of
total minimum 50 micron DFT of approved
colour shade (gross total minimum DFT
shall be 150 micron) of minimum total DFT
50 micron of approved colour shade (gross
total minimum DFT shall be 150 micron) of
approved colour shade on structural steel
including preparation of surface by
thoroughly cleaning of oil, dirt, dust, rust &
scale by fresh water jet cleaning, wire
brushing, power tool cleaning, mechanical
scrapers, etc... & final surface cleaning with
cotton waste before application of primer
(in case of application of primer is delayed
due to any reason, the surface preparation
shall be redone at no extra cost to GIPCL),
including providing approved MS pipe
scaffolding with clamps, safety nets, cherry
packers, covering the surrounding areas
with plastic sheet/tarpaulin wherever
required, etc... as directed by Engineer-in-
charge and as per manufacturer's detail
technical specifications with all materials,
labour, tools & tackles, standard safety
tools & tackles, standard safety PPEs,
etc…. complete at all elevations for 04 nos.
of Bed Ash conveyor. Quantity specified
is estimated quantity and payment will
be made on the basis of actual joint field
measurements of work done.
2 Same as above item no. 1 but 02 nos. of
Lignite Conveyor. Quantity specified is
estimated quantity and payment will be 180.000 Sqm 295.68
made on the basis of actual joint field
measurements of work done.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
3 Same as above item no. 1 but 08 nos. of
Lime Feeder with pipes. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
4 Same as above item no. 1 but 04 nos. of
PA fan Supporting structure and lub oil unit.
Quantity specified is estimated quantity
and payment will be made on the basis
of actual joint field measurements of
5 Same as above item no. 1 but 04 nos. of
SA fan Supporting structure and lub oil unit.
Quantity specified is estimated quantity
and payment will be made on the basis
of actual joint field measurements of
6 Same as above item no. 1 but 04 nos. ID
fan Supporting structure. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
7 Same as above item no. 1 but 04 nos. of
Hydraulic Coupling for Phase-1. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
8 Same as above item no. 1 but 01 nos. of
Inter mediate bed ash bin Silo. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
9 Same as above item no. 1 but 4 nos. Bed
Ash Silo. Quantity specified is estimated
quantity and payment will be made on 450.000 Sqm 295.68
the basis of actual joint field
measurements of work done.
10 Same as above item no. 1 but Blowers and
supporting structure. Quantity specified is
estimated quantity and payment will be
made on the basis of actual joint field
measurements of work done.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
11 Same as above item no. 1 but 03 nos. of
Lignite Bunker. Quantity specified is
estimated quantity and payment will be 1500.000 Sqm 295.68
made on the basis of actual joint field
measurements of work done.
12 Same as above item no. 1 but 02 nos. of Lime
Stone Bunker. Quantity specified is
estimated quantity and payment will be 1000.000 Sqm 295.68
made on the basis of actual joint field
measurements of work done.
13 Same as above item no. 1 but 16 nos. of ID
Fan I/L, O/L gates, ESP I/L, O/L gates.
Quantity specified is estimated quantity
and payment will be made on the basis of
actual joint field measurements of work
14 Same as above item no. 1 but 04 nos. of Ash
Cooler 1 & 2. Quantity specified is
estimated quantity and payment will be 150.000 Sqm 295.68
made on the basis of actual joint field
measurements of work done.
15 Providing and applying hybrid polymer Anti
Corrosive, Heat Resistant (up to 200 degree
C), self priming & fast drying coating of
approved colour shade (Min. total DFT shall
be 110-120 micron), self priming & fast
drying coating of approved colour shade
including preparation of surface by
thoroughly cleaning of oil, dirt, dust, rust &
scale by wire brushing, power tool cleaning,
mechanical scrapers, etc... & final surface
cleaning with cotton waste before application
of primer (in case of application of primer is
delayed due to any reason, the surface
preparation shall be redone at no extra cost
to GIPCL), including providing approved MS 100.000 Sqm 302.02
pipe scaffolding with clamps, safety nets,
cherry packers, covering the surrounding
areas with plastic sheet/tarpaulin wherever
required, etc... as directed by Engineer-in-
charge and as per manufacturer's detail
technical specifications with all materials,
labour, tools & tackles, standard safety tools
& tackles, standard safety PPEs, etc….
complete at all elevations for 06 nos. of
Lignite Rotary air lock Feeder. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
16 Same as above item no. 15 but 02 nos. of
Cyclone (From Seal pot to Back Pass inlet).
Quantity specified is estimated quantity
and payment will be made on the basis
of actual joint field measurements of
17 Same as above item no. 15 but 04 nos. of
Burner Assembly. Quantity specified is
estimated quantity and payment will be 75.000 Sqm 302.02
made on the basis of actual joint field
measurements of work done.
18 Same as above item no. 15 but Misc. Pipe
lines, valve related painting. Quantity
specified is estimated quantity and
payment will be made on the basis of
actual joint field measurements of work
19 Same as above item no. 15 but EBFP
(Engine and Pump) including pipe lines.
Quantity specified is estimated quantity
and payment will be made on the basis
of actual joint field measurements of
20 Same as above item no. 15 but 20 nos. of
Hoist Painting. Quantity specified is
estimated quantity and payment will be 200.000 Sqm 302.02
made on the basis of actual joint field
measurements of work done.
21 Same as above item no. 15 but 04 nos. of
APH tube sheet (Inside area only) for PA
and SA bottom module. Quantity
specified is estimated quantity and 25.000 Sqm 302.02
payment will be made on the basis of
actual joint field measurements of work
22 Equipment associated Platforms in Unit-1
to 4 Boilers. Quantity specified is
estimated quantity and payment will be 1000.000 Sqm 302.02
made on the basis of actual joint field
measurements of work done.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Item Description Estimated Unit Estimated Estimated
No. Quantity SoR Rate Amount
23 M.S./G.I Pipe Hand railing painting:-
Providing and applying one coat of
minimum 40 micron OFT High Build ZP
Primer and two coats of High Gloss
Synthetic Enamel paint, each coat of
minimum 25 micron DFT of approved
colour shade ( golden yellow) on structural
steel including preparation of surface by
thoroughly cleaning of oil, dirt, dust, rust &
scale by wire brushing, power tool cleaning,
mechanical scrapers, etc .. & final surface
cleaning with cotton waste before
application of primer (in case of application
of primer is delayed due to any reason , the
surface preparation shall be redone at no
extra cost to GIPCL), including providing
approved MS pipe scaffolding with clamps,
safety nets, cherry packers, covering the
surrounding areas with plastic sheet /
tarpaulin wherever required, etc.. as
directed by Engineer-in-charge and as per
manufacturer's detail technical
specifications wilh all materials, labour,
tools & tackles, standard safety tools &
tackles, standard safety PPEs, etc
...complete al all elevations of boilers.
Measurement of hand railing paining work:-
It shall be measured in single side area in
Sqm of railing (length & height) and will be
paid for 50% of measured area in Sqm for
painting of railing in all respect. i.e. if size of
railing is 50M (Length) x 0.80M (Height)
and painted both side of total railing area i.e
horizontal and vertical pipes with toe guard,
payment will be made as 0.50 X 50M X
0.80M.Quantities specified are estimated
quantity and payment will be made on the
basis of actual joint field measurements of
Total SoR Amount without GST >>> 8860.000
Total SoR Amount with GST >>>
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
ABSTRACT OF SOR
PKG. Package Details Estimated Amount
I CIVIL: (a) Unit-4 Boiler structure, (b) Ph-II Chimney inside
structure, (c) Cable Rack structures, (d) Ph-II TG Building
"A" row GF & FF, AWR, Deaerator roof, (e) Patna Intake-
well, (f) Ph-I TG Building "A" row GF & FF, (g) Ph-I ID Fan
structure and (h) Warehouse & Godown structures.
II ELECTRICAL: Auxiliary & Equipments with supports.
III TG-BoP: Auxiliary & Equipments with supports.
IV BMD: Boiler Auxiliary & Equipments with supports.
PACKAGE: I + II + III + IV (without GST) >>>
TOTAL WITH 18% GST >>>
Note: Bidders have to quote their offer in % (+, - or equal) on above total estimated SoR value in
online Price Bid only through website: https://tender.nprocure.com. The quoted percentage rate
on above SoR item rates (Section-E of this tender) shall be inclusive of all labour cost, equipments,
materials, supervision, consumables, tools, tackles, profit & overheads, all taxes & duties (including
GST), etc… as per this tender. Item rate shall be firm for entire duration of contract period and any
approved extensions.
My rates are as under (only to be quoted online on (n)Procure).
At estimated value
OR _______ %age above the estimated value
OR _______%age below the estimated value.
Note:- (1) Percentage rate offer/bid price on SoR value including GST shall be quoted through online (n)-
Procure only. Hard copy of price bid shall not be considered/accepted.
(2) Evaluation of tender & E-Reverse Auction will be done on gross total quoted amount with GST.
SEAL & SIGNATURE OF TENDERER : __________________________________
NAME OF AUTHORISED PERSON : __________________________________
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
For the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Signature of Contractor
Date : (with official Stamp)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE
BY SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at
PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
referred to as “The Company/Owner” which expressions shall unless
repugnant to the subject or context includes its legal representatives,
successors and assigns) has entered into a contract with M/s.
……………………………….. ………………………….(hereinafter referred to
as “Contractor(s)/ Seller(s)” which expression shall unless repugnant to the
subject or context includes their legal representatives, successors and
assigns ) for …………………………….on the terms and conditions as set out
inter alia, in the Company’s contract No./ work order
No.……………………………………………..date …………and various
documents forming part thereof hereinafter referred to as the “said contract”
which expression include all amendments, modifications and/ or variations
thereto and where as the Contractor(s)/ Seller(s) has agreed for due
execution of the entire contract and guarantees its performance including any
parts executed through any other agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a
bank for….% (……….percent) of the total value of the “said contract” against
due and faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s)/seller(s) for execution/ supplies
made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating
that in the opinion of the Company, which is final & binding, the amount
claimed is due by reason of default made by the Contractor(s)/ Seller(s) in
performing any of the terms & conditions of the said Contract including defect
liability obligations, in fulfilling the performance guarantee obligation or loss
or damage caused to or would be caused to or suffered by the Company by
reason of any breach by the said Contractor (s)/ Seller(s) of any of the terms
& conditions of the contract. Any such demand made on the Bank by the
owner shall be conclusive as regards the amount due and payable by the
Bank under this guarantee. However our liability under this guarantee shall
be restricted to Rs.-------------------------(Rs ……………………only)
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s)/ Seller(s) in
any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid
discharge of our liability for payment there under. Our liability to pay is not
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
dependent or conditional on the owner proceeding against the Contractor(s)/
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all
respect and for all purposes be binding and operative until payment of all
money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke
this guarantee during its currency without previous consent of the
OWNER/PURCHASER and further agrees that if this guarantee is extended
for a period as mutually agreed between contractor & owner/purchaser, the
guarantee shall be valid for a period so extended provided that a written
request for such extension is received before the expiry of validity of
6. We ……………Bank further agree with the Company that the company shall
have the fullest liberty without our consent and without affecting in any
manner our obligations hereunder to vary any of the terms and conditions of
the said Contract(s)/ Order(s) or to extend the time of performance by the
said Contractor(s) Seller(s) from time to time or to postpone for any time or
from time to time any of the powers exercisable by the Company against the
said Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and
conditions relating to the said Contract(s)/ Order(s) and we shall not be
relieved from our liability by reason of any such variation, or extension being
granted to the said Contractor (s) / Seller(s) or for any forbearance, act or
omission on the part of the Company or any indulgence by the Company to
the said Contractor(s)/ Seller(s) or by any such matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have
affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not
exceed Rs…………….(Rupees…………only) and shall remain in force
till..……..Unless a demand or claim under this Guarantee is made on us
within three months from the date of expiry we shall be discharged from all
the liabilities under this guarantee.
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate
Office at PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
called “The Company Owner” which expression shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns) has
issued tender paper vide its Tender No……………………………………………for --
----------------------------------------- (hereinafter called “the said tender”)to
M/s.……………………………(hereinafter called the said Tenderer(s)” which
expression shall unless repugnant to the subject or context includes their legal
representatives, successors and assigns and as per terms and conditions of the
said tender, the tenderer shall submit a Bank guarantee for Rs.……….
(Rupees……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this
guarantee without any demur, merely on a demand from the Company stating that
in the opinion of the company which is final and binding, the amount claimed is due
because of any withdrawal of the tender or any material alteration to the tender after
the opening of the tender by way of any loss or damage caused to or would be
caused or suffered by the Company by reason of any breach by the said tenderer(s)
of any of the terms and conditions contained in the said tender or failure to accept
the letter of Intent Agreement or that the amount covered under this Guarantee is
forfeited. Any such demand made on the Bank by the owner shall be conclusive as
regards the amount due and payable by the Bank under this guarantee, However,
our liability under this guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding
any dispute or disputes raised by the tenderer (s) in any suit or proceeding pending
before any office, court or tribunal relating thereto our liability under this present
guarantee being absolute and unequivocal. The payment so made by us under this
bond shall be a valid discharge of our liability for payment there under. Our liability
to pay is not dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended
by the liquidation or winding up, dissolution or change of constitution or insolvency
of the said tenderer(s) but shall in all respect and for all purposes be binding and
operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
finalization of the said tender and that it shall continue to be enforceable till the said
tender is finally decided and order placed on the successful tenderer(s) and or till
all the dues of the company under or by virtue of the said tender have been fully
paid and its claims satisfied or discharged or till a duly authorized officer of the
company certifies that the terms and conditions of the said tender have been fully
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
and properly carried out by the said tenderer (s) and accordingly discharges the
6. That the Owner Company will have full liberty without reference to us and without
affecting this guarantee to postpone for any time or from time to time the exercise
of any of the power of the owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept
this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract
and extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will
not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the
works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out
above referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the
statutory requirements. We hereby indemnify GIPCL from any disputes arising in future
related to payment of labours, Provident Fund, etc.. and confirm that all liabilities of
settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
TOOLS AND TACKLES TO BE PROVIDED BY CONTRACTOR
Sr. Tools and equipments Purpose/Use
Putty knife For applying putty to cover dents, undulations, cracks, knots
in wooden surfaces.
Scrapping knife For removing old paints and hard materials form surface and
not to use on oily or greasy surface directly.
Chisel knife For cutting hard old thick paint
Moulding knife or contour For scrapping or rubbing on peculiarly shaped/contours like
knife statue, ornamental carving, curved protions, etc.
Pallet knife For mixing the paint in drums
Stencil knife For cutting stencils
Flat brush For painting generally flat wooden and metal surfaces
Round brush For painting very large areas quickly for preparatory
Curve brush For painting curved surfaces of irregular design.
Taper brush For white washing covering large area of contact.
Wall brush or ground brush For painting walls
White wash brush For white washing
Calcimine brush For applying calcimine or water paint to ceiling and walls and
not used for applying oil paint.
Dust brush For removing dust, dirt before painting
Wire brush For removing tightly adhering rust on metal surfaces.
Stencil brush For stencil work
Artist brush For lettering/arts
Stippler brush For painting on very rough surfaces.
3 Blow lamp For removing thick old paint form metal surfaces by heating
and not used on wood, glass, cement surfaces.
4 Pallet board For mixing various colours by artists.
5. Plumb ball For drawing vertical lines
6. Shade card For choosing shades of a single colour.
7. Emery sheets available in For removing unwanted materials and creating surface
four types: Sand papers, roughness.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Sr. Tools and equipments Purpose/Use
Cloth emery, Waterproof
emery, Abrasive stones
8. Stencil paper For cutting or making stencil
9. Viscosity For measuring the consistency or flow of paint.
10. Elcometer For measuring dry film thickness (DFT) of paint in microns
and this works on eltromagnetic principle ( 1 micron =0.001
11. Gloss meter For measuring gloss value of dry paint film.
12. Wet flatting machine For flattening the putty applied areas.
13. Drop sheet Available in the form of paper, gunny bag, polythene paper
etc. to protect flooring and furniture form paint particularly
used for ceiling and interior works.
14. Ladder Essentially used for painting ceiling, side walls, etc.
15. Masking tape For covering areas which are not to be painted.
16. Paint bucket For containing paints for painting.
17. Straight edge/ruler For drawing straight line bands, border line, etc.
18. Strainer For filtering the paint to remove dust, dirt & other insoluble
materials before applying paint on the surface.
19. Brush holder For keeping brushes after completing the painting.
20. Rubber block For flatting small, curved areas where wet flatting machine
can not be used.
21. Spray Gun For painting the surfaces by mode of spraying.
22. Wire brush, chisels As required for surface preparation
23. Grinder Minimum 25 nos. (in working condition) with Flap Disc
Buffing wheels.
24. Flap Disc Buffing wheels As required for proper cleaning of entire rust from steel
25. Safety Net Sufficient quantity for working at height
26. Safety shoes/ Safety helmet For all workers/ supervisor
27. Safety belt & fall arrestor For all workers working at height
28. Safety Life line As required
29. MS scaffolding with Jali (for Sufficient quantity
30 Drill machine with stirrer 04 nos. for mixing paint & thinner
31 Lighting fixture with cables, As required for night working
Halogen, bulbs, ELCB etc.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
(Surat Lignite Power Plant)
SCHEDULE OF DEVIATION
All the deviations from the general and special conditions of contract shall be filled
by BIDDER clause by clause in this schedule.
Sr. SECTION CLAUSE NO AS PER TENDER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from
GIPCL’s General/ Special Conditions of this enquiry. The bidder further confirms
that in the events any other data and information presented in the BIDDER’s
proposal and accompanying documents are at variance with specific requirements
laid out in the GIPCL’s General /Special Conditions, then the latter shall govern and
will be binding on the BIDDER for quoted price.
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm,
agree and undertake that all the Statutory and Safety Laws and Regulations of the applicable
Authority/ies shall be strictly followed for all types of works at the site during the period of the
Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory of the Bidder
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm
that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings
/ Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three (03) years. There are no ongoing/pending legal
matter(s) with any of the Govt. of Gujarat Undertakings / GoG supported
Companies, including GIPCL.
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three( 03) years.
Please Tick ( )
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this
regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory of the Bidder
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
(To be submitted with each monthly bill on letter head along with labour compliance
of.........................to .......................... at Gujarat Industries Power Company Limited – Surat
Lignite Power Plant, Nani Naroli. I undertake to be bound by all the provisions of the
Contract Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation &
Abolition) Rules 1972, The Employees’ Provident Funds and Miscellaneous Provisions Act
1952, Minimum Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus Act
1965 and all other applicable labour laws in so far as the provisions are applicable to me in
respect of the employment of contract labour by me for the month of ................................
Authorized Signature with Stamp
Place: Nani Naroli
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
10.0 ANNEXURE-J
(To be submitted on Company’s Letter Head on six monthly and with final bill)
Declaration & Undertaking for disposal of empty paint drums/barrels
of contractor) hereby confirm that I/We have taken all our empty paint drums & barrels to outside of
SLPP premises on date ___________ through our vehicle/s no./s.
___________________________________. We also declare & confirm that all these empty paint
drums/barrels have been disposed as per prevailing GPCB (Gujarat Pollution Control Board)
norms/guidelines and shall indemnify, keep harmless the GIPCL against any future liabilities or
consequences in this regard.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this
regard shall amont to legal action, including forfeiting of our security deposit/pending dues and also
to disqualification for future bid participation of GIPCL.
Signed and Stamped by the
Authorized Signatory of the Contractor
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
List of Tools & Tackles to be submitted with physical documents
Sr. No. Description Nos. Status
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
13.0 ANNEXURE-K
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of EMD/SD, Advance for Ash, Advance for
(The link is visible as horizontal highlighted in “BLUE” shade below Tenders - News &
Update Section).
3. After clicking the link the new page will open. On this page, No need to enter User Name
and Password. Directly click on “Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will
be self-explanatory. It is desired that all the information may be filled correctly so that
the payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and
then proceed. E.g. some information like Party code is not available to vendor or GST No.
not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”, It will
be appreciated that regular vendors may obtain the party code from Materials Dept. or
Concerned Person, so that the vendor can be identified. The same party code may be used
for future transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway,
the charges* as below will be applicable, which has to be borne by Vendor/Party making
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # I to IV: Industrial Painting Works for various Steel
Structures & Equipment of Power Plant at Village: Nani Naroli”.
Bid No.: SLPP/Civil/Industrial Structure Painting/2026/.
14.0 ANNEXURE-L
PARTICULARS OF THE BIDDER
(To be submitted with physical techno-commercial bid)
Sr. Particulars Please provide
No. information here.
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
5. User ID for e-reverse auction on website:
https://e-auction.nprocure.com
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
EMD BG Format.pdf
Tender Document_Ind. Str. Steel painting 2026.pdf
vendor registration form (Revised) 2026.pdf
BANK MANDATE GIPCL.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .