Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹3.2 L+₹19,566.93 (6.49%)Accepted-Finance | ₹3.2 L+₹19,566.93 (6.49%) | L2 | Accepted-Finance ACCEPT |
| 3 | L3₹3.8 L+₹82,831.84 (27.5%)Accepted-Finance | ₹3.8 L+₹82,831.84 (27.5%) | L3 | Accepted-Finance ACCEPT |
Tender Value
₹4.5 L
EMD Value
₹9,040
Closing Date
30 Jul 2026, 4:00 pmClosed
Executive Engineer I and FC Divsion Nowshera
Executive Engineer I and FC Divsion Nowshera
Improvement/Renovation/ Reconstruction of breached portion including Headworks repair of Nadani Khul from RD 0-650m (part-II)
2026_IFC_316509_1
e-NIT NO. 11 OF 2026-27
Open Tender
Civil Works
Percentage
15 days
Sunderbani
As per e-NIT
4 documents required · 4 mandatory
₹500
Executive Engineer I and FC Divsion Nowshera
₹9,040
31 Jul 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth upto 30 cm measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 120 | sqm | 12.49 | ₹1,498.92 |
| 2 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )
Wet | 15 | cum | 184.95 | ₹2,774.25 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:
1:3:6 or richer mix (i/c equivalent design mix) | 5 | cum | 1,725.2 | ₹8,626 |
| 4 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead | 100 | sqm | 38.9 | ₹3,890 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 30.72 | cum | 5,733.6 | ₹1,76,136.19 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 153.6 | sqm | 286.35 | ₹43,983.36 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with)1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 13.45 | cum | 6,591.25 | ₹88,652.31 |
| 8 | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix:
( 1 cement : 4 fine sand) | 250 | sqm | 283.8 | ₹70,950 |
| 9 | Carriage of Sand and bajree for an avg distance of 10km by MT and 300m | 62.63 | cum | 884.26 | ₹55,381.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1032176.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .