| 1 | L1₹3.4 CrAdmitted-Finance | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 CrAdmitted-Finance | ₹3.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.5 CrAdmitted-Finance MAIN ROAD PRAGATI VIHAR RISHIKESH DEHRADUN 249201 | DEHRADUN | UTTARAKHAND | 249201 | ₹3.5 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ALPHA PACIFIC SYSTEMS PVT. LTD. L2 | M/S PURNAGIRI CONSTRUCTION CO. PVT. LTD. L1 | SS Soam Engineers Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-in-charge. All kinds of soil | 7,471.93 | Cum | 177 ₹13.2 L | 170 ₹12.7 L | 178 ₹13.3 L |
| 2.00 | Laying of LDPE film (250micron, 5.80m wide *50m long) confirming to IC 2508 revised 1984 or its latest amendments, with the help of Bamboos on the side slopes of ring band in submerged area including cost of all materials. | 1,920.48 | Sqm | 65 ₹1.2 L | 60 ₹1.2 L | 65 ₹1.2 L |
| 3.00 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | 19,791 | Bag | 22 ₹4.4 L | 17 ₹3.4 L | 22 ₹4.4 L |
| 4.00 | Dewatering by electric pumps | 50,131.2 | Kwh | 31 ₹15.5 L | 30 ₹15.0 L | 31 ₹15.5 L |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering -All work upto plinth level 1:2:4 (1 cement : 2 coarse sand(zone-111)derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). | 3,870 | Cum | 7,780 ₹3.0 Cr | 7,780 ₹3.0 Cr | 7,781 ₹3.0 Cr |
| 6.00 | Drilling 32 mm dia holes 50 cm deep in old concrete. | 50 | Nos | 154 ₹7,700 | 153 ₹7,650 | 154 ₹7,700 |
| 7.00 | Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1.74 | Tonne | 86,940 ₹1.5 L | 86,938 ₹1.5 L | 86,939 ₹1.5 L |
| 8.00 | Preparation and poring of Epoxy primer drill holes as per direction of Engineer - in - charge, including cost of all material. | 8.77 | Kg | 464 ₹4,069.28 | 460 ₹4,034.20 | 464 ₹4,069.28 |
| 9.00 | Centering and Shuttering including strutting's, propping etc. and removal of form work for foundations, footings, bases for columns. | 2,394.05 | Sqm | 392 ₹9.4 L | 300 ₹7.2 L | 393 ₹9.4 L |
| 10.00 | Providing and laying high performance concrete of given design mix of M-65/A-20 grade including cost of cement, admixtures & Silica fumes in recommended proportions to accelerate/retard setting of concrete but excluding cost of centring & shuttering & reinforcement as per directions of engineer-in charge. | 18.38 | Cum | 10,900 ₹2.0 L | 10,877 ₹2.0 L | 10,888 ₹2.0 L |
Tender Value
Refer Docs
EMD Value
₹7.0 L
Closing Date
16 Mar 2026, 11:30 amClosed
Group Senior Manager (Contracts)
Procurement- Contract Divison, Tanakpur Power Station, Banbassa, Champawat, UK-262310
Restoration of Launching Apron from bay no 11 to 16 and repair of damaged end sills (dent) at Tanakpur Barrage
2026_NHPC_899771_1
NH/TPS/PnC/NIT/ 2026/E164470/1157/897 Date 20/02/2026
Open Tender
Civil Works
90 days
NHPC Ltd. Tanakpur Power Station, Banbasa
As per Tender documents
5 documents required · 5 mandatory
₹1,770
NHPC Ltd. Tanakpur Power Station
₹7.0 L
Yes
30 Mar 2026
23 Feb 2026
19 Mar 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
23 Feb 2026 - 5 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-in-charge. All kinds of soil
Laying of LDPE film (250micron, 5.80m wide *50m long) confirming to IC 2508 revised 1984 or its latest amendments, with the help of Bamboos on the side slopes of ring band in submerged area including cost of all materials.
Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work.
Dewatering by electric pumps
Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering -All work upto plinth level 1:2:4 (1 cement : 2 coarse sand(zone-111)derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources).
Drilling 32 mm dia holes 50 cm deep in old concrete.
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Preparation and poring of Epoxy primer drill holes as per direction of Engineer - in - charge, including cost of all material.
Centering and Shuttering including strutting's, propping etc. and removal of form work for foundations, footings, bases for columns.
Providing and laying high performance concrete of given design mix of M-65/A-20 grade including cost of cement, admixtures & Silica fumes in recommended proportions to accelerate/retard setting of concrete but excluding cost of centring & shuttering & reinforcement as per directions of engineer-in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
CPP-Tender-1157.pdf
Tender Documents • 2.52 MB
BOQ_945761.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid