Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹1.1 L+₹5,635.93 (5.28%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹1.2 L+₹11,518.34 (10.8%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹1.3 L+₹21,377.12 (20.0%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | L4 | Rejected-Finance Due to L4 |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
21 Sept 2026, 10:30 amClosed
Executive Engineer
Division No.1, HPPWD Bilaspur
Providing and fixing PVC Panelling.
2026_PWD_143446_2
PW-BLP1-CB-eproc/26-889-8938 dt 9.9.26
Open Tender
Civil Works - Buildings
Percentage
30 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹3,300
15 Oct 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing PVC wall panelling / PVC wall louvered panels of approved quality shade and thickness. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 141.72 | Per Square Metre | 1,112 | ₹1,57,592.64 |
| 2 | Repairs to plaster of thickness 12 mm to 20 mm (Twelve to twenty milimetre) in patches of area 2.5 sq.meters (Two point five Per Square Metre) and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in- Charge With cement mortar 1:4 (One cement : four fine sand). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 24 | Per Square Metre | 280 | ₹6,720 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
BOQ_213135.xls
BOQ • 0.28 MB
2SBDNCC164313.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .