| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC NULL | 1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | 2₹5.1 L+₹28,101 (5.83%)Rejected-Finance | 2 | Rejected-Finance AGREEMENT EXECUTED BY L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹5.5 L
EMD Value
₹13,763
Closing Date
10 Apr 2023, 6:00 pmClosed
ASSISTANT ENGINEER
LIDEW SECTION CHENGALA GP
RE TENDER-CHENGALAGP CHENGALA WEST ROAD IMPROVEMENT
2023_LSGD_570317_1
AE/LSGD/CH/ET/0322-23
Open Tender
Civil Works - Roads
Item Rate
150 days
CHENGALA
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,215
Yes
₹13,763
Yes
2 Sept 2023
1 Apr 2023
12 Apr 2023
1 Apr 2023
10 Apr 2023
1 Apr 2023
Amount
Road Improvement.
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65)
5.1.1a:Prime Coat :- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.2a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65)
SIDE PROTECTION
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Drainage covering slab
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
M M AHAMMED
ABDUL SAMAD C A
Bidder Name
M M AHAMMED
ahammed C H B
ABDUL SAMAD C A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .