| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 CrAccepted-AOC | ₹19.4 Cr | L1 | Accepted-AOC Being the L1 Bidder |
| 2 | L2₹19.4 CrRejected-Finance | ₹19.4 Cr | L2 | Rejected-Finance Being L2 |
Tender Value
₹19.6 Cr
EMD Value
₹29.6 L
Closing Date
24 Jul 2019, 3:00 pmClosed
Executive Engineer, Mechukha Division, PWD, AP
Executive Engineer, Mechukha Division, PWD, AP, Shi-Yomi, PIN-791001
Earthwork, Pavement, Cross Drainage, Protection work, Cc Drain, Composite Bridge, Metal Crash Barrier, Road Furniture
2019_PWDAP_236_1
SEA/MD/Tender/NESIDS/19-20/01 dtd 10/07/2019
Open Tender
Civil Works
540 days
Karo to Pidi
Please refer Tender documents.
16 documents required · 16 mandatory
₹5,000
EE PWD Mechukha
₹29.6 L
Yes
18 Jan 2020
12 Jul 2019
27 Jul 2019
12 Jul 2019
24 Jul 2019
19 Jul 2019
17 Jul 2019 - 19 Jul 2019
Amount
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in Hilly Area by mecanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting(Excavation in hilly area in Ordinary Rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres)
Preparation of sub-grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 mtr.
Consolidation of sub-grade with road roller of 8 to 10 tonne capacity i/c making good the undulations etc. with earth or quarry spoil etc. and rerolling the sub-grade.
By Mix in Place Method (Construction of granular sub base by providing close graded material, spreading inuniform and compacting with vibratory roller to achieve themixing by mix in place method with rotavator at OMC,layers with motor grader on prepared surface,desired density, complete as per clause 401) for grading- I Material
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification i/c spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Grading-II using screening materials Type-B (11.2mm aggregate)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification i/c spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Grading-III using screening materials Type-B (11.2mm aggregate)
Prime Coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) For Grading-II (19mm nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) ii) for Grading-II 10mm noninal size)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats Case-I Type-A
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) ii) Ordinary Soil Manual Means, Depth upto 3 Mtr.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) ii) Ordinary rock [not requiring blasting] Manual Means
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15, Height up to 5m.
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed Rubble Masonry (first sort )
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25,Using Concrete Mixer,Height upto 5 m
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing and laying Plain cement concrete M20 in for PCC retaining wall and parapet wall complete as per drawing and technical specifications
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications E. RCC Grade M25 I. Using concrete Mixer
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications G. RCC Grade M30 I. Using Concrete Mixer
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. a) Stone/Boulder
Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringer, stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, stacking in protected condition etc. complete as per specification and as directed by the Engineer-in-Charge (Carriage cost from fabricator work shop to actual bridge site will be paid seperately).
Assembling and erection at site including labour component,erection cum dismandling of Staging, Scaffolding, Falseswork etc complete.(A full proof method statement of erection programe at site has to be submitted and get approved before start)
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 30,Using Concrete Mixer,Height 5m to 10m, For solid slab super-structure
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified) (i) M 20 grade concrete
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408)
Drainage Spouts Complete as per drawing and technical specification
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting freely over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c along the centre line of the plate, all as specified in clause 2604.)
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. 5th kilometre stone (precast)
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. II) Ordinary kilometer stone (precast)
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. iii) Hectometer stone (precast)
Sushil Kumar Agarwalla
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_249.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid