| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 PARTY |
| 2 | L2₹1.9 Cr+₹83.6 L (78.6%)Rejected-AOC | ₹1.9 Cr+₹83.6 L (78.6%) | L2 | Rejected-AOC L2 PARTY |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Nov 2020, 1:00 pmClosed
HOU (T)
KMML CHAVARA
Earth work in excavation,filling,stone pitching etc. Construction of RCC Garland drain as per direction of engineer in charge.
2020_KMML_395365_1
KMML/TP/PROJ/C/T/04/2020 Dated 28/10/2020
Open Tender
Civil Works - Others
Item Rate
180 days
KMML CHAVARA
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,900
₹50,000
6 Jul 2021
31 Oct 2020
17 Nov 2020
31 Oct 2020
16 Nov 2020
31 Oct 2020
31 Oct 2020 - 16 Nov 2020
Amount
Garland around old IOP & ETP ponds in KMML
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
od173813/2020_2021 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal & disposal of rubbish,scrap,pipes etc up to a distance of 50 m outside the periphery of the area cleared.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.16.2 : Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
16.72 : Supplying and stacking of hard stone ( for stone pitching ) 22.5 cm thick at stie.
16.73 : Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete ( Payment for stone to be made separately)
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.35 : Add for using extra cement in the items of design mix over and above the specified cement content therein
od173816/2020_2021 : Providing and applying anti corrosive protective coating of Nitozinc primer/Cera Zinc or similar Zinc rich primer of approved brand over steel reinforcement as per the manufacture's specification as per direction of Engineer-in-charge. The product shall be applied on reinforcement steel after thoroughly cleaning. painted area of steel shall be considered for payment.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
26.32.1 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).12 mm average thickness.
13.52.2 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work
22.4.1 : Providing and Placing in position suitable PVC water stops conforming to IS : 12200 for construction / expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete:Serrated with central bulb ( 225 mm wide, 8-11 mm thick)
13.65.1 : Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
od173818/2020_2021 : Labour charges for engaging skilled labour for plumbing works other than works that described in the schedule as per direction of engineer in charge.
Toe wall(Ref:MORD Specification)
14.11.1 : Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5Random rubble masonry in case of stone pitching laid with cement mortar (1:5):In cement mortar (1:5)
od173814/2020_2021 : Extra for Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical Means for 1km lead.<br><br>(i)Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including a lead upto 1km<br><br><br>Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip.
Amrita builders
Bidder Name
Amrita builders
BIOHOMES PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .