Design, Supply, Erection, Testing, Modification & Commissioning of 25 KV AC OHE between Samlaya to Timba in Connection With GC Work, 25kV AC OHE between Lakodara - Miyagam Karjan in connection with Lakodhra Flyover and Y-connection of Vishwamitri between Vishwamitri to Pratap Nagar on Vadodara Division of Western Railway.
TR-C-4-2026-27-T
TR-C-4-2026-27-T
Open
24 Months
Vadodara, Gujarat
₹0
₹57.8 L
15 Jun 2026
15 Jun 2026
30 Jun 2026
1-Section I: General for SMLA - TBA Project
2-Section-II: Concrete for SMLA - TBA Project
3-Section-III: Ferrous for SMLA - TBA Project
4-Section-IV: Non Ferrous for SMLA - TBA Project
5-Section-V: Insulator for SMLA - TBA Project
6-Section-VI: Bridge Mast for SMLA - TBA Project
7-Section-VII: Other than SOR Item for SMLA - TBA Project
8-Section-I: General for Lakodhara Flyover Project
9-Section-II: Concrete for Lakodhara Flyover Project
10-Section-III: Ferrous for Lakodhara Flyover Project
11-Section-IV: Non-Ferrous for Lakodhara Flyover Project
12-Section-V: Insulator for Lakodhara Flyover Project
13-Section-VI: Bridge Mast for Lakodhara Flyover Project
14-Section-VII: Other than SOR for Lakodhara Flyover Project
15-Section-I: General for Y connecion Vishwamitri to Pratapnagar
16-Section-II: Concrete for Y connection Vishwamitri to Pratapnagar
17-Section-III Ferrous for Y connection Vishwamitri to Pratapnagar
18-Section-IV: Non-Ferrous for Y connection Vishwamitri to Pratapnagar
19-Section-V: Insulator for Y connection Vishwamitri to Pratapnagar
20-Section-VII: Other than SOR Item for Y connection Vishwamitri to
Item Breakup - 1-Section I: General for SMLA - TBA Project
Per Track See tender documents Explanatory Note KM Total 1343034.00 Item- 2 Preparation of designs and drawings for switching stations (FP/SP/SSP) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover on a flat rate bass per Each switching station, survey, Investigation of soil bearing pressure, preparation of cross section drawings, preparation of general arrangement drawings, detailed layout of equipment; bus-bar connections and insulators, layout of earthing system and earth connections, cable run layout, detailed designs and drawings for steel work and structural support, excluding the ones for which supply is made by the Purchaser, suitable concrete plinths for equipment and drawings for equipment's, components, fitting and materials supplied by the Contractor The price shall include supply of requisite number of copies of all drawings, including completion drawings as specified. (see para 12.23 of Annexure-2). Total 185132.00 Item- 3 Supply without insulator and erection of mounting arrangements for span wire. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each insulator and erection of mounting arrangements for span wire. Materials shall be procured from RDSO/CORE approved vendors. Materials shall be as per latest RDSO drawing/specification or latest.
The price shall cover supply without Each insulator and erection of mounting arrangements for span wire. Materials shall be procured from RDSO/CORE approved vendors. Materials shall be as per latest RDSO drawing/specification or latest. Total 86420.00 Item- 4 Marking/Painting of temperature & 'Y'-Measurement of OHE mast at BWA locations. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover for Marking/Painting of Each temperature & 'Y'-Measurement of OHE mast at BWA locations. The contractor is responsible for recording the precise physical measurements of the OHE at the time of final adjustment and painting these values onto the relevant masts. This is specifically required at all BWA (regulated OHE) where tensioning weights are used. The markings must be clear and durable: The mast surface must be cleaned of rust, scale, or grease before painting. Use high- quality enamel paint. Typically, the background is painted with a white/yellow patch, and the letters/numbers are in black or signal red. Measurements must be taken using a calibrated thermometer and a standard measuring tape after the OHE has been "final-tuned" (final tensioning and staggering completed). Markings are usually placed on the face of the mast (the side facing the track) at a height of approximately 1.5 to 2 metres from the rail level for easy visibility from the ground or a motor trolley. Total 20520.00 Supply without insulator and erection of material for termination of Single conductor of Over Head Item- 5 Equipment or terminating wire. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 761406.00 Supply without insulator and erection of materials for termination of copper cross feeder with Item- 6 gantries. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply & erection of Set all material necessary for the termination of Copper Cross feeder with gantry or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, it includes the all fasteners required for termination. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply & erection of Set all material necessary for the termination of Copper Cross feeder with gantry or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, it includes the all fasteners required for termination. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 135056.00 Supply without insulator and erection of anti-creep with Cadmium copper catenary wire in polluted Item- 7 area. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply of Each complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051).
The price shall cover cost for erection of Each complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 935594.00 Item- 8 Supply without Insulator and erection of cut-in (9 Tonne) Insulator S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 105760.00 Item- 9 Supply without Insulator and erection of a suspension (9 Tonne) Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings.
The price shall cover cost for erection of Each complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings. Total 87760.00 Item- 10 Supply without Insulator and erection of 25 kV Post Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest.
The price shall cover cost for erection of Each 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest. Total 136950.00 Supply and erection of earthing station at Switching Posts (SP & SSP) with conventional earthing Item- 12 system. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of an earthing Each station as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover erection of an Each earthing station as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 426692.00 Item- 13 Supply & Erection of 25kV Vacuum type Interrupter. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of 25kV Each Vacuum interrupter, complete with operating mechanism, all fittings, and accessories including terminal connectors as per RDSO Spec. No. TI/SPC/PSI/LVCBIN/0121 (May, 2023) with latest A&C Slip. The price shall also cover the supply of an enameled number plate and required quantity of Long shackle brass Pad lock (Make - Godrej, Link). The price also covers cost of interlocking arrangement between VCB and concern DPI (as per RDSO guidelines). Price shall also cover the supply of different size of GI/PVC pipe for dressing of all type of cable provide at SP/SSP building cubic. Price shall also cover the supply of different size of MS chequered plate use for cable trench at SSP/SP control building cubical.
The price shall cover erection of 25kV Each Vacuum interrupter, complete with operating mechanism, all fittings, and accessories including terminal connectors as per RDSO Spec. No. TI/SPC/PSI/LVCBIN/0121 (May, 2023) with latest A&C Slip. The price shall also cover the supply of an enameled number plate and required quantity of Long shackle brass Pad lock (Make - Godrej, Link). The price also covers cost of interlocking arrangement between VCB and concern DPI (as per RDSO guidelines). Price shall also cover the supply of different size of GI/PVC pipe for dressing of all type of cable provide at SP/SSP building cubic. Price shall also cover the supply of different size of MS chequered plate use for cable trench at SSP/SP control building cubical. Total 1754368.00 Item- 14 Supply and Erection of 25kV Potential Transformers Type-I. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply of 27.5 Each kV/100V potential transformer Type-I as per RDSO specification no. TI/SPC/PSI/PT/0210 (06/2021) or latest correction slip complete with all fittings and accessories including terminal connectors. The price also cover cost for supply of an enameled number plate and material for any Modification required for comply Latest TC, SMI/MI or local arrangement by open line. The price shall also cover for supply and modification of PT DO Fuse in SSP/SP post.
The price shall cover cost for erection of Each 27.5 kV/100V potential transformer Type-I as per RDSO specification no. TI/SPC/PSI/PT/0210 (06/2021) or latest correction slip complete with all fittings and accessories including terminal connectors. The price also cover cost for supply of an enameled number plate and material for any Modification required for comply Latest TC, SMI/MI or local arrangement by open line. The price shall also cover for supply and modification of PT DO Fuse in SSP/SP post. Total 517500.00 Item- 15 Supply and Erection of 42kV Lightning Arrestors (station class). S No. Item Description of Item Unit Qty Rate Amount No
The Price shall cover cost for supply of 42 Each KV Metal oxide gapless type Lightening Arrestor as per RDSO specification No. TI/SPC/PSI/MOGTLA/0101 (02/2015) or latest including surge monitor (including suitable length of 35 sqmm cu. cable & clamps) and dis-connector assembly and an enameled number plate with fasteners and clamps. The disconnector shall be confirming to RDSO MI No. TI/MI/0048 Rev- 2. After putting in service THRC (Third Harmonic Resistive Current) measurement shall be carried out on each arrestor as per RDSO MI No. TI/MF/0041 Rev-1 dtd 08.04.2010 (or latest).
The Price shall cover cost for erection of 42 Each KV Metal oxide gapless type Lightening Arrestor as per RDSO specification No. TI/SPC/PSI/MOGTLA/0101 (02/2015) or latest including surge monitor (including suitable length of 35 sqmm cu. cable & clamps) and dis-connector assembly and an enameled number plate with fasteners and clamps. The disconnector shall be confirming to RDSO MI No. TI/MI/0048 Rev- 2. After putting in service THRC (Third Harmonic Resistive Current) measurement shall be carried out on each arrestor as per RDSO MI No. TI/MF/0041 Rev-1 dtd 08.04.2010 (or latest). Total 358856.00 Item- 16 Supply & Erection of Terminal Boards in Control Cubicles. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each terminal board for 230V AC supply to Interrupters in switching post control cubicle as per RDSO/CORE latest drawings and specifications. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply of Each terminal board for 230V AC supply to Interrupters in switching post control cubicle as per RDSO/CORE latest drawings and specifications. Total 62312.00 Item- 17 Supply & Erection of Iron Clad 110 V DC Fuse Box. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each 110V DC distribution board in switching post control cubicle suitable for respective section and as per RDSO/CORE latest drawings and specifications.
The price shall cover cost for supply of Each 110V DC distribution board in switching post control cubicle suitable for respective section and as per RDSO/CORE latest drawings and specifications. Total 20700.00 Item- 18 Supply & Erection of Iron Clad 250 V AC Fuse Box. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each erection of Iron clad 250V AC distribution board in switching post control cubicle suitable for respective section and as per RDSO/CORE latest drawings and specifications.
The price shall cover cost for supply & Each erection of Iron clad 250V AC distribution board in switching post control cubicle suitable for respective section and as per RDSO/CORE latest drawings and specifications. Total 22664.00 Item- 19 Supply and Erection of Lead Acid Batteries. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of a 110V, Each 40Ah low maintenance lead acid battery complete with stand and accessories as per RDSO specification No. RDSO/PE/SPEC/TL/0040-2003 (Rev.-0) with amendment No.-1 or latest, and a tool board. The price shall also cover for cost of a tool board for keeping all accessories like Hydro Meter, thermometer etc. The price shall also cover for cost of white board and specific gravity chart board for showing of pilot shell and standard value of specific gravity.
The price shall cover erection of a 110V, Each 40Ah low maintenance lead acid battery complete with stand and accessories as per RDSO specification No. RDSO/PE/SPEC/TL/0040-2003 (Rev.-0) with amendment No.-1 or latest, and a tool board. The price shall also cover for cost of a tool board for keeping all accessories like Hydro Meter, thermometer etc. The price shall also cover for cost of white board and specific gravity chart board for showing of pilot shell and standard value of specific gravity. Total 562588.00 Item- 20 Supply of Battery chargers. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of a battery Each charger for 110V, 40Ah low maintenance lead acid battery complete with stand and accessories as per RDSO specification No. TI/SPC/PSI/40-150/CHGR/1210 with latest ACS or latest. The price shall also cover for cost of suitable size of cable to connect between battery charger and battery including lugs and connectors. The price shall also cover for cost of Tools for battery like thermometer, hydrometer, voltmeter etc. with proper tool stand (hydrometer stand), White board for marking of pilot cell and its voltage and specific gravity, Board showing specific gravity.
The price shall cover erection of a battery Each charger for 110V, 40Ah low maintenance lead acid battery complete with stand and accessories as per RDSO specification No. TI/SPC/PSI/40-150/CHGR/1210 with latest ACS or latest. The price shall also cover for cost of suitable size of cable to connect between battery charger and battery including lugs and connectors. The price shall also cover for cost of Tools for battery like thermometer, hydrometer, voltmeter etc. with proper tool stand (hydrometer stand), White board for marking of pilot cell and its voltage and specific gravity, Board showing specific gravity. Total 451080.00 Item- 21 Supply and Installation of cables for Control and indication circuit S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply and Metre Installation of 10 core x 2.5 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration.
The price shall cover cost for supply and Metre Installation of 10 core x 2.5 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration. Total 173760.00 Item- 22 Supply and Installation of cables for Heater supply. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply and Metre Installation of 2 core x 4.0 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration.
The price shall cover cost for supply and Metre Installation of 2 core x 4.0 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration. Total 30560.00 Item- 23 Supply and Installation of cables for Catenary Indication. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply and Metre Installation of 2 core x 2.5 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration.
The price shall cover cost for supply and Metre Installation of 2 core x 2.5 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration. Total 117120.00 Item- 24 Supply and Installation of cables for L.T. Power supply. S No. Item Description of Item Unit Qty Rate Amount No
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor. The price shall also cover cost for supply and Installation of cable route marker at every 25mtrs. For whole length. DYCEE-C-BRC-ELEC/WESTERN RLY
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor. The price shall also cover cost for supply and Installation of cable route marker at every 25mtrs. For whole length. Total 1950000.00 Item- 25 Supply and Installation of cables for 110 V D.C. supply. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply and Metre Installation of 2 core x 4.0 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration.
The price shall cover cost for supply and Metre Installation of 2 core x 4.0 sq mm PVC insulated, PVC sheathed, Copper conductor, Un armoured Electric Control cable for working voltage up to and including 1100 volts as per specification No. IS:1554/ Pt-l/ 1988 or latest and shall be packed in corrugated steel drums and procured at concern SSE's store or as desired by railway administration. Total 60480.00 Item- 26 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (10 kVA). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 10 KVA as per RDSO specification No. ETl/PSl/15(8-2003) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc.
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 10 KVA as per RDSO specification No. ETl/PSl/15(8-2003) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc. DYCEE-C-BRC-ELEC/WESTERN RLY Total 749144.00 Item- 27 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (25 KVA). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 25 KVA as per RDSO specification No. ETl/PSl/15(8 /03) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14 (1/86) Rev 1 (Apr•87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc.
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 25 KVA as per RDSO specification No. ETl/PSl/15(8 /03) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14 (1/86) Rev 1 (Apr•87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc. Total 389358.00 Item- 28 Supply without Insulator of 25 kV D.O. fuse switch. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply, Each Erection, testing and commissioning of 25 KV DO fuse complete assembly excluding insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87).
The price shall cover cost for supply, Each Erection, testing and commissioning of 25 KV DO fuse complete assembly excluding insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87). Total 199360.00 Item- 29 Transfer of equipment from one mast or support to another. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover transfer of overhead Each equipment to a bracket assembly on a new mast or support and dismantling of the erected bracket assembly from the old mast of support and consequent adjustment to overhead equipment required such as re-spacing of droppers (including cost of dropper wire), levelling etc. the foundation and steel work and bracket assembly for the new mast or structure will be paid for under appropriate Items and 4 respectively . DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover transfer of overhead Each equipment to a bracket assembly on a new mast or support and dismantling of the erected bracket assembly from the old mast of support and consequent adjustment to overhead equipment required such as re-spacing of droppers (including cost of dropper wire), levelling etc. the foundation and steel work and bracket assembly for the new mast or structure will be paid for under appropriate Items and 4 respectively Total 331050.00 Item- 31 Dismantling of Over Head Equipment. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling of Kilometre equipment including Terminations, tensioning devices, guy rod assemblies bracket assemblies and associated small parts steel work (excluding components embedded in concrete) The price also cover cost for cutting of catenary wire, contact wire and other materials for DS-8 purpose (if required) and same will be handed over to concern SSE/C, Railways scrap depot for DS-8 or as desired by SSE/TRD/C. Transportation charges will be given relevant item of transportation. Total 80808.00 Item- 32 Splicing & extension of an anchored overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover splicing of terminated Each overhead equipment for extension and consequent adjustment of the affected equipment The dismantled equipment (excluding portions embedded in concrete) shall be returned to the Purchaser's Engineer The cost of dismantling of overhead equipment would be paid for under Item 31(d) for the whole length of the anchoring span Irrespective of the physical position of the splices. The extended overhead equipment shall be deemed as starting from the center line of the structure preceding the old terminating structure and the extended overhead equipment shall be paid for under Item 6(az) or 6(bz) or 6(cz) as applicable. Total 170760.00 Item- 33 Dismantling of a Section Insulator Assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling Each 107 sq mm contact wire, 65 sq mm catenary wire, dropper wire and a section insulator, splicing of catenary and contact wires and the necessary adjustments to droppers. The price shall exclude the supply of required copper conductors for the adjustment. The dismantled equipment shall be handed over to the Purchaser's Engineer at the spot of dismantling or at the contactor's Depot's. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost of dismantling Each 107 sq mm contact wire, 65 sq mm catenary wire, dropper wire and a section insulator, splicing of catenary and contact wires and the necessary adjustments to droppers. The price shall exclude the supply of required copper conductors for the adjustment. The dismantled equipment shall be handed over to the Purchaser's Engineer at the spot of dismantling or at the contactor's Depot's. Total 37128.00 Item- 34 Slewing and Putting Back of OHE in Original Shape. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover for temporary slewing Sqm or lowering of erected OHE adjusted and unadjusted to ground for special works, at the request of the Purchaser and restoration and re-adjustment of the equipment after completion of special works. The price shall be per span or part thereof, including anchoring spans. Additional components or materials used during such restoration or re-adjustment will be paid for at rates included in schedule 3 plus handling charges of provided such use has, in the opinion of the Purchaser, become necessary due to reasons beyond the control of the Contractor. Total 40776.00 Item- 35 Dismantling of an Isolator S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for dismantle of Each complete isolator including terminal connectors, jumper wire, PG clamps operating rod and support insulators, operating handle and SPS. Transportation charges will be given relevant item of transportation. Total 4786.00 Item- 36 Dismantling of a Post / Pedestal Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling of Each an isolator, single or gang-operated, including dismantling of connections to the over-head equipment and associated small parts steel work. Total 9132.00 Item- 37 Manning of Switching Stations (SP/SSP). S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
Item No. 31(m)(i): Manning of Switching Each/month Stations (SP/SSP) The prices shall cover the payment/wages to the staff to be deployed at each switching station and traction sub- station as directed by purchaser's Engineer Manning shall be done round the clock The staff to be deployed must be skilled and fully Conversant with operation of various equipment's installed in switching station and traction sub-stations. The staff shall be deployed after test and trial by purchaser and on Issue of competency certificate. The staff deployed shall act in accordance with instructions/ directions given by the Traction Power Controller/representative of the purchaser The staff shall not leave the working place (Switching station and Traction Sub-station) in any case without prior permission of the purchaser's representative The price shall cover conveyance charges to the staff for going and coming to the working place. The period of manning shall be decided by the purchaser during execution of contract and manning shall commence on receipt of intimation in writing from the purchaser one month in advance. Note: In case Feeding Post is situated adjacent to TSS same will also be included for manning along with TSS. Total 757608.00 Supply and Erection of material for internal and external lighting of Switching Station Building Item- 39 (SP/SSP). S No. Item Description of Item Unit Qty Rate Amount No
SEE THE TENDER DOCUMENT RESPECTIVE Each ITEMS EXPLANTORY NOTE Total 152680.00
Item Breakup - 2-Section-II: Concrete for SMLA - TBA Project
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock. SEE THE TENDER DOCUMENT REPECTIVE ITEMS EXPLANTORY NOTE
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock. Total 43890000.00 Item- 2 Reinforced concrete for foundation & trench. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover excavation and all cum reinforced concrete work for foundation including supply of steel for reinforcement and other materials Including bending/binding laying of reinforcement shoring and shuttering where necessary, costing concrete including frame work where necessary, grouting and finishing the tops of foundation blocks with the required slope/muff. The price shall include dismantling of all connected temporary arrangement back filling as required and removal of soil. The price shall also coverall concrete work for cost in situ piles and pedestals /columns for mounting equipment. The volume of cast-in-situ piles and pedestals columns shall be added of the volume of foundation block for purposes of payment, Dowel bars will not be considered as reinforcement for the purpose of this item. The price shall include the cost of cement also. Cement will not be supplied by Rlys. The price shall include cost for paint with distemper on of foundation. The price also covers cost of smooth plastering on exposed portion of foundation. Cement shall be used of 53 grade and of popular brand.
The price shall cover excavation and all cum reinforced concrete work for foundation including supply of steel for reinforcement and other materials Including bending/binding laying of reinforcement shoring and shuttering where necessary, costing concrete including frame work where necessary, grouting and finishing the tops of foundation blocks with the required slope/muff. The price shall include dismantling of all connected temporary arrangement back filling as required and removal of soil. The price shall also coverall concrete work for cost in situ piles and pedestals /columns for mounting equipment. The volume of cast-in-situ piles and pedestals columns shall be added of the volume of foundation block for purposes of payment, Dowel bars will not be considered as reinforcement for the purpose of this item. The price shall include the cost of cement also. Cement will not be supplied by Rlys. The price shall include cost for paint with distemper on of foundation. The price also covers cost of smooth plastering on exposed portion of foundation. Cement shall be used of 53 grade and of popular brand. Total 243420.00 Item- 3 Cable trench covers S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover costing of cable Sqm trench covers in reinforced concrete as per drawing The cable trench covers will be cashed in on angle iron frame of angle size40x40x5. The price shall include the supply of steel for reinforcement angle iron for the frame work fabrication of angle iron frame etc. The price shall include Positioning and dressing up of the trench. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover costing of cable Sqm trench covers in reinforced concrete as per drawing The cable trench covers will be cashed in on angle iron frame of angle size40x40x5. The price shall include the supply of steel for reinforcement angle iron for the frame work fabrication of angle iron frame etc. The price shall include Positioning and dressing up of the trench Total 40980.00 Item- 4 Supply & spreading of Ballast/Gravel in the switch yard S No. Item Description of Item Unit Qty Rate Amount No
The price shall be per cum rate and shall cum cover supply and spreading of uniformly graded grovel/ballast of size 20 mm, in the outdoor switch yard after completing all the works and levelling the switch yard area, but before commissioning of the sub- station. The gravel/ballast shall be of good quality and free from any dust and dirt. Prior approval of ballast shall be taken from the Purchaser for the gravel samples. The gravel/ballast shall be spread out uniformly to a depth of 15cm. over the area indicated by the Purchaser's Engineer.
The price shall be per cum rate and shall cum cover supply and spreading of uniformly graded grovel/ballast of size 20 mm, in the outdoor switch yard after completing all the works and levelling the switch yard area, but before commissioning of the sub- station. The gravel/ballast shall be of good quality and free from any dust and dirt. Prior approval of ballast shall be taken from the Purchaser for the gravel samples. The gravel/ballast shall be spread out uniformly to a depth of 15cm. over the area indicated by the Purchaser's Engineer. Total 80550.00
Item Breakup - 3-Section-III: Ferrous for SMLA - TBA Project
The price shall cover the cost of supply of MT O, N and R type portals with components as per RDSO's Drg. No (i)ETVC/0008 Sheet No.1 latest Mod for 'N type. (ii)ETI/C/0017 Sheet No.1 latest Mod for 'O type. (iii)ETI/C/0011 Sheet No.1 latest Mod for 'R' t y p e . The structures shall be fabricated from steel conforming to IS-2062f2011 (or latest) Grade - E250 Quality-A IS-808/1989 and galvanised as per RDSOs specification No-ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). The price shall cover, cost of erection, alignment and setting before grouting, wherever required, of portals assembly of boom components and erection of the same. The prices shall also include Supply and erection of galvanised bolts, nuts washers etc. wherever required as per approved designs and drawings. The price shall cover assembling, adjustment and erection of all types of booms including TTC booms and any special structures across the track, not covered under Item The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a portal at platforms. 1.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 2.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 3.The price shall also include the straightening of portal uprights etc bent during transit and cutting of masts/portal uprights to suit the site condition. 4.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 5.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 6.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 7.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 8.Crane will be arranged by railway for Portal boom erection only on demand by contractor. 9.Materials will be supplied at site of work. 10.Payable unit weights for standard mast. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the cost of supply of MT O, N and R type portals with components as per RDSO's Drg. No (i)ETVC/0008 Sheet No.1 latest Mod for 'N type. (ii)ETI/C/0017 Sheet No.1 latest Mod for 'O type. (iii)ETI/C/0011 Sheet No.1 latest Mod for 'R' t y p e . The structures shall be fabricated from steel conforming to IS-2062f2011 (or latest) Grade - E250 Quality-A IS-808/1989 and galvanised as per RDSOs specification No-ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). The price shall cover, cost of erection, alignment and setting before grouting, wherever required, of portals assembly of boom components and erection of the same. The prices shall also include Supply and erection of galvanised bolts, nuts washers etc. wherever required as per approved designs and drawings. The price shall cover assembling, adjustment and erection of all types of booms including TTC booms and any special structures across the track, not covered under Item The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a portal at platforms. 1.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 2.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 3.The price shall also include the straightening of portal uprights etc bent during transit and cutting of masts/portal uprights to suit the site condition. 4.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 5.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 6.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 7.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 8.Crane will be arranged by railway for Portal boom erection only on demand by contractor. 9.Materials will be supplied at site of work. 10.Payable unit weights for standard mast. Total 12792022.00 DYCEE-C-BRC-ELEC/WESTERN RLY Supply and erection of structure steel (traction masts) fabricated and galvanised of all type: B- Item- 2 Series Mast. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost of supply of MT B-Series traction mast 9.5 m and/or 11'.4 m long i.e. B-Series Mast fabricated and galvanized as per RDSO Org No. ETI/C/0071 (Mod-E), Tl/DRG/ClV/B-Mast/00001/ 13/0 with latest mod and specification No. ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). Steel shall be conforming to IS- 2062/2011 (or latest) Grade - E250, Quality- A, and Zinc conforming to IS-209 (or Latest). The price shall also cover the supply of all size of B-Series mast required which has not been mentioned. The price shall cover the cost of erection, alignment and setting before grouting of individual traction masts and main masts of Switching and Booster Transformers stations including those for head spans. The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/removed/damaged during the course of erection of a mast at platforms 1.The price shall cover cost of fabrication, galvanization, and supply of individual tractions masts & Bridge mast. 2.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 3.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 4.The price shall also include the straightening of masts bent during transit and cutting of masts/portal uprights to suit the site condition. 5.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 6.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 7.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 8.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 9.Crane will be arranged by railway for Portal boom erection only on demand by contractor. 10.Materials will be supplied at site of DYCEE-C-BRC-ELEC/WESTERN RLY work. 11.Payable unit weights for standard mast. 12. Sr. No.Type of mastBlack Weight (Kg) as per drawing 16"x6"x25.15 BFB352.45 28"x6"x35 RSJ494.00 3B- 150369.69 4B-175422.89 5B-200474.19 6B-250695.27
The price shall cover the cost of supply of MT B-Series traction mast 9.5 m and/or 11'.4 m long i.e. B-Series Mast fabricated and galvanized as per RDSO Org No. ETI/C/0071 (Mod-E), Tl/DRG/ClV/B-Mast/00001/ 13/0 with latest mod and specification No. ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). Steel shall be conforming to IS- 2062/2011 (or latest) Grade - E250, Quality- A, and Zinc conforming to IS-209 (or Latest). The price shall also cover the supply of all size of B-Series mast required which has not been mentioned. The price shall cover the cost of erection, alignment and setting before grouting of individual traction masts and main masts of Switching and Booster Transformers stations including those for head spans. The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/removed/damaged during the course of erection of a mast at platforms 1.The price shall cover cost of fabrication, galvanization, and supply of individual tractions masts & Bridge mast. 2.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 3.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 4.The price shall also include the straightening of masts bent during transit and cutting of masts/portal uprights to suit the site condition. 5.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 6.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 7.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 8.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 9.Crane will be arranged by railway for Portal boom erection only on demand by contractor. DYCEE-C-BRC-ELEC/WESTERN RLY 10.Materials will be supplied at site of work. 11.Payable unit weights for standard mast. 12. Sr. No.Type of mastBlack Weight (Kg) as per drawing 16"x6"x25.15 BFB352.45 28"x6"x35 RSJ494.00 3B- 150369.69 4B-175422.89 5B-200474.19 6B-250695.27 Total 64551040.00 Supply and erection of special fabricated and galvanised steel structures other than portals & Item- 3 traction masts not covered under items 3(b)(i) & 3(b)(ii) S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall Cover the cost of supply and MT erection of special fabricated & galvanised steel structures (other than BFB/RSUB- Series masts and portals) for conventional and High Rise OHE. The structure to be supplied under this Item shall be TTC, G- type, BFB type portals, Bridge masts, emergency masts -and double/fabricated "S" series masts such as S3, SS, S7, S8, S- 100, S-101. T-150, Dwarf Masts etc Any other similar structure required during the execution of work shall also be supplied under this Item. The price shall include the cost of steel, fabrication, galvanisation, and supply at site for erection Steel shall be conforming to IS-2062/2011 (or latest) Grade - E250, Quality-A, Zinc conforming to IS- 209/1997 (or latest) and galvanization to RDSOs specification No ETI/OHE/13(4/84) with A&C slip No.1 to 4, with latest spec. The various structures covered under this Item are:- SNDescriptionDrg No.Mod TTC with boomETVC/0009 sheet 1Latest 2G- type portal Upright & end pieces. ETVC/0056Latest 3BFB portalETVC/0026 Sh -1Latest 4 ETVC/0182 5S- 8,12.4mETI/C/0183Latest 6S-100, for LT. transformer at SWSETI,'C/0043 7S-101, for Isolators inside SWSETVC/0044Latest 8 ETI,'C/0180 9S5, 114mETVC/0042Latest 10T-150, for LT supply transformerETI/PSl/037Latest 11Dwarf MastETVOHE/G/1402Latest 12Special BFB Portal for 5 tracks (General Arrangement) for High Rise OHE.TI/DRG'CIV/BFB-POTAL'O 0001/13/0 Sh.No. 1 13G-Type Portal Special Upright and End Piece for Hi h Rise OHETI/DRG/CIV/G-PORTAL/O 0001/13/0Latest 14Two Track Cantilever Structure (TTC) General Arrangement for High Rise OHETI/DRG/CIV/TTC/ 00001/13/0 Sh. l The price shall cover, cost of erection, alignment and setting before grouting, wherever required, gantries, including tower/ steel tower/steel work for feeders for traction sub-station, drop arms, standard super masts and suspension brackets for return conductors, dwarf masts or stub masts for anchoring, complete with anchor plates drilled and welded in position, multiple cantilever cross arm, chairs, adopters for bracket assemblies and all other small part steel works, the erection of which is carried out by the Contractor irrespective of whether they are supplied by the Purchaser or the Contractor. The prices shall also include supply and erection of galvanised bolts, nuts washers etc wherever required as per approved designs and drawings. The prices shall also include the cost of repairing of platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a mast/portal at platforms. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall Cover the cost of supply and MT erection of special fabricated & galvanised steel structures (other than BFB/RSUB- Series masts and portals) for conventional and High Rise OHE. The structure to be supplied under this Item shall be TTC, G- type, BFB type portals, Bridge masts, emergency masts -and double/fabricated "S" series masts such as S3, SS, S7, S8, S- 100, S-101. T-150, Dwarf Masts etc Any other similar structure required during the execution of work shall also be supplied under this Item. The price shall include the cost of steel, fabrication, galvanisation, and supply at site for erection Steel shall be conforming to IS-2062/2011 (or latest) Grade - E250, Quality-A, Zinc conforming to IS- 209/1997 (or latest) and galvanization to RDSOs specification No ETI/OHE/13(4/84) with A&C slip No.1 to 4, with latest spec. The various structures covered under this Item are:- SNDescriptionDrg No.Mod TTC with boomETVC/0009 sheet 1Latest 2G- type portal Upright & end pieces. ETVC/0056Latest 3BFB portalETVC/0026 Sh -1Latest 4 ETVC/0182 5S- 8,12.4mETI/C/0183Latest 6S-100, for LT. transformer at SWSETI,'C/0043 7S-101, for Isolators inside SWSETVC/0044Latest 8 ETI,'C/0180 9S5, 114mETVC/0042Latest 10T-150, for LT supply transformerETI/PSl/037Latest 11Dwarf MastETVOHE/G/1402Latest 12Special BFB Portal for 5 tracks (General Arrangement) for High Rise OHE.TI/DRG'CIV/BFB-POTAL'O 0001/13/0 Sh.No. 1 13G-Type Portal Special Upright and End Piece for Hi h Rise OHETI/DRG/CIV/G-PORTAL/O 0001/13/0Latest 14Two Track Cantilever Structure (TTC) General Arrangement for High Rise OHETI/DRG/CIV/TTC/ 00001/13/0 Sh. l The price shall cover, cost of erection, alignment and setting before grouting, wherever required, gantries, including tower/ steel tower/steel work for feeders for traction sub-station, drop arms, standard super masts and suspension brackets for return conductors, dwarf masts or stub masts for anchoring, complete with anchor plates drilled and welded in position, multiple cantilever cross arm, chairs, adopters for bracket assemblies and all other small part steel works, the erection of which is carried out by the Contractor irrespective of whether they are supplied by the Purchaser or the Contractor. The prices shall also include supply and erection of galvanised bolts, nuts washers etc wherever required as per approved designs and drawings. The prices shall also include the cost of repairing of platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a mast/portal at platforms. Total 4486950.00 Item- 4 Supply only of fabricated steel SPS other than masts S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the cost of supply only MT of all fabricated steel work excluding fasteners which are required to be supplied by the Contractor. The cost of erection for such steel work, If carried out by the Contractor shall be paid for under Item-III. For standard fabricated steel work for which RDSO'S approved drawings are available, the weight of steel work as specified in RDSOS drawing shall be considered for payment. However, in case the unit sectional weight of any member indicated in RDSOs drawing is not in conformity with the unit sectional weight as per the latest IS specification, the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment For the non- standard fabricated steel work, the calculated weight to be considered for payment under this Item shall be included in the relevant drawing based on, latest IS sectional weight at the time of submitting the designs for approval of the Purchaser. The price shall include the cost of supply of bracket top and bottom mast fittings suitable for PSC masts. Total 3667410.00 Item- 5 Supply and erection of a Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply and erection of Each Guy Rod Assembly, for both conventional and High Rise OHE, of various lengths for traction masts, feeder line towers or supports complete with mast guy rod fittings, guy rod with adjustments and part/s be grouted in the anchor block The price shall not include the cost of supply and erection of a dwarf or stub mast with anchor plates drilled and welded in position, where required, for anchorage, and small parts steel work, complete with bolts and nuts etc., if any for attaching the mast guy rod fittings to the mast/structure which shall be paid for separately under the relevant Item. Prices indicated against all other Items should be exclusive of the price of supply and erection of guy rod, if any which will be paid for under this Item. COMPONENTS REQUIREMENT Riy. Id. No.Description of componentsQty. per unit 3232Mast guy rod fitting (welded) completes with 4 short bolts, nuts, lock nuts and washers for attachment to mast/S.P.S including appropriate fittings1 set 5001/ 5001-1/ 5001-3Anchor bolts (complete with nuts lock nuts and split pins 1 Set 5002Guy rod stirrup1 no. 5004 or 5005 or 5005-2 or 5006-+1 or 9070 or 9071 or5006-2Guy rod with nut, lock nut, washer and split pin1 Set 5007-1Anchor 'v' bolt2 nos. 5008Anchor loop2 nos. 5220Guy rod double strap assembly1 set or 2 set as required NOTE: 1 . In case the Contractor desires to adopt a different design for guy rod assembly, the same shall be indicated by him in the Tender and the components required should be clearly listed under this Item as deviation. 2.Supply and erection of guy rod assembly at anticreep portals will also be paid for under this Item. 3. Galvanization shall be as per Railway Specification No. No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 4. All components should be as per latest RDSO Drawing and Specification with Revision (if any). DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply and erection of Each Guy Rod Assembly, for both conventional and High Rise OHE, of various lengths for traction masts, feeder line towers or supports complete with mast guy rod fittings, guy rod with adjustments and part/s be grouted in the anchor block The price shall not include the cost of supply and erection of a dwarf or stub mast with anchor plates drilled and welded in position, where required, for anchorage, and small parts steel work, complete with bolts and nuts etc., if any for attaching the mast guy rod fittings to the mast/structure which shall be paid for separately under the relevant Item. Prices indicated against all other Items should be exclusive of the price of supply and erection of guy rod, if any which will be paid for under this Item. COMPONENTS REQUIREMENT Riy. Id. No.Description of componentsQty. per unit 3232Mast guy rod fitting (welded) completes with 4 short bolts, nuts, lock nuts and washers for attachment to mast/S.P.S including appropriate fittings1 set 5001/ 5001-1/ 5001-3Anchor bolts (complete with nuts lock nuts and split pins 1 Set 5002Guy rod stirrup1 no. 5004 or 5005 or 5005-2 or 5006-+1 or 9070 or 9071 or5006-2Guy rod with nut, lock nut, washer and split pin1 Set 5007-1Anchor 'v' bolt2 nos. 5008Anchor loop2 nos. 5220Guy rod double strap assembly1 set or 2 set as required NOTE: 1 . In case the Contractor desires to adopt a different design for guy rod assembly, the same shall be indicated by him in the Tender and the components required should be clearly listed under this Item as deviation. 2.Supply and erection of guy rod assembly at anticreep portals will also be paid for under this Item. 3. Galvanization shall be as per Railway Specification No. No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 4. All components should be as per latest RDSO Drawing and Specification with Revision (if any). Total 2454720.00 Item- 6 Supply and erection of 25kV Caution Board S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site . DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site. Total 359100.00 Item- 7 Supply without insulator and erection of Single bracket assembly S No. Item Description of Item Unit Qty Rate Amount No
SEE THE TENDER DOCUMENT REPECTIVE Each ITEMS EXPLANTORY NOTE
SEE THE TENDER DOCUMENT REPECTIVE Each ITEMS EXPLANTORY NOTE Total 15518160.00 Item- 8 Supply without insulator and erection of a pull off arrangement for one OHE S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. Total 119540.00 Item- 9 Supply without Insulator and erection of materials for termination of Double conductor S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all materials Each necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all materials Each necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 1068636.00 Item- 10 Supply and erection of a GI structure bond S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. 4.Pric shall also cover for connection of structure bond to Rail in track circuiting area under the sleeper as per HQ letter No. EL-94/15/1 datd 17.10.2025 5.Price shall also cover for chamfering of all type Rail hole for traction bonding. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. 4.Pric shall also cover for connection of structure bond to Rail in track circuiting area under the sleeper as per HQ letter No. EL-94/15/1 datd 17.10.2025 5.Price shall also cover for chamfering of all type Rail hole for traction bonding. Total 1554888.00 Item- 11 Supply and erection of a GI longitudinal bond S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. Total 257700.00 Item- 12 Supply & erection of a GI transverse and special bond S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail.
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY Total 448800.00 Item- 13 Supply & erection of a single earth electrode S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest.
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 253920.00 Item- 14 Supply and erection of 8 SWG G.I. wire for earthing S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item.
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item. Total 7638.00 Item- 15 Supply and erection of fencing panels at switching Station S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include supply and erection Metre of fencing panels painted with two coats of red Oxide zinc chromate primer to IS:2074:1979 and finished with two coats of aluminium paint. The prices shall not include supply and erection of fencing up- rights, anti-climbing devices but hall include the cost of fasteners and the price shall be for a metre length of the panels, 2.4 meter height measured in the plan view of appropriate approved drawings. The fencing panel should be made with 8 SWG Wire.
The price shall include supply and erection Metre of fencing panels painted with two coats of red Oxide zinc chromate primer to IS:2074:1979 and finished with two coats of aluminium paint. The prices shall not include supply and erection of fencing up- rights, anti-climbing devices but hall include the cost of fasteners and the price shall be for a metre length of the panels, 2.4 meter height measured in the plan view of appropriate approved drawings. The fencing panel should be made with 8 SWG Wire. Total 683340.00 Item- 16 Supply and erection of fencing uprights S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply and erection of MT fencing uprights painted with two coats of red oxide zinc chromate primer to IS- 2074:1992 and finished with two coats of aluminium paint The price shall be on the basis of black weight of the steel with no deduction for holes or skew cut or no increase for weld materials. The cost of foundation of uprights will be paid under Item-2.
The price shall cover supply and erection of MT fencing uprights painted with two coats of red oxide zinc chromate primer to IS- 2074:1992 and finished with two coats of aluminium paint The price shall be on the basis of black weight of the steel with no deduction for holes or skew cut or no increase for weld materials. The cost of foundation of uprights will be paid under Item-2. Total 400452.00 Item- 17 Supply and erection of anticlimbing device for Switching stations S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply with erection of Metre an anti-climbing device consisting of steel fixture sand galvanized barbed wire mounted on the fencing panels as per approved drawings. The price shall be per meter length of the panel. The price shall include painting of the fixtures with two coats of red oxide zinc chromate primer and finished with two coats of Aluminum paint as per IS: 2339. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply with erection of Metre an anti-climbing device consisting of steel fixture sand galvanized barbed wire mounted on the fencing panels as per approved drawings. The price shall be per meter length of the panel. The price shall include painting of the fixtures with two coats of red oxide zinc chromate primer and finished with two coats of Aluminum paint as per IS: 2339. Total 29085.00 Item- 18 Supply and erection of anti-climbing device for L.T. Supply Transformer Stations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply with erection of Each an anti-climbing device consisting of steel fixture sand galvanized barbed wire mounted on the fencing panels as per approved drawings. The price shall be per meter length of the panel. The price shall include painting of the fixtures with two coats of red oxide zinc chromate primer and finished with two coats of Aluminum paint as per IS: 2339.
The price shall cover supply with erection of Each an anti-climbing device consisting of steel fixture sand galvanized barbed wire mounted on the fencing panels as per approved drawings. The price shall be per meter length of the panel. The price shall include painting of the fixtures with two coats of red oxide zinc chromate primer and finished with two coats of Aluminum paint as per IS: 2339. Total 73350.00 Item- 19 Supply and erection of anti-monkey menace. S No. Item Description of Item Unit Qty Rate Amount No
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design. Total 3660228.00 Item- 20 Supply & Erection of protective screens on ROB/FOB S No. Item Description of Item Unit Qty Rate Amount No
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE. Total 266400.00 Supply of steel reinforcement for RCC work including cost of cutting, straightening, bending, biding, Item- 21 erecting and placing & keeping in position including all lead & lift & including cost of binding wire S No. Item Description of Item Unit Qty Rate Amount No
The Item covers the price of supply of MT tested quality of steel for reinforcement of appropriate size and for reinforcement steel above 8 mm or suitable dia shall be High strength deformed steel bars conforming to IS:1786/1985 and below 8 mm dia shall be mild steel and medium tensile steel bars conforming to IS:432(Pt.I)/1982. Price shall cover the cost towards cutting, straightening hooking, bending, binding, erecting and placing and keeping in position including all lead and lift and including cost of binding wire Test certificates for steel will be furnished by the Contractor at his own cost from a laboratory approved by the Engineer-in- Charge. Nothing extra will be paid for unauthorized overlaps and wastage of steel involved in cutting the bars to their required sizes. Total 69261.00
Item Breakup - 4-Section-IV: Non Ferrous for SMLA - TBA Project
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az) .
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az) . Total 324400.00 Item- 2 Supply and erection of Over Head Equipment only. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender Document respective items Kilometre explanatory note
See the Tender Document respective items Kilometre explanatory note Total 14151750.00 Supply and Erection of copper cross feeder wires (37/2.25 mm HDBC) across the track at Item- 3 SP/SSP/FP/BT locations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 150 sqmm (37/2.25 mm). The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 150 sqmm (37/2.25 mm). The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. Total 5059969.60 Item- 4 Supply without Insulator & erection of a section insulator assembly S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied bythe Contractor. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied bythe Contractor. Total 838785.00 Item- 5 Supply and Erection of a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and Erection of Each a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly complete assembly. The price shall also cover end fitting for contact & catenary wire and other material required for erection & smooth operation with earthing arrangement. The short neutral assembly to be as per RDSO specification No. TI/SPC/OHE /SNS/0000 Rev.-1 with A&C Slip No.1or latest. Neutral section should be purchase from RDSO/CORE approved source only. The material is suitable for i.e. 65 sq.mm Catenary and 107 sq.mm contact wires. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply and Erection of Each a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly complete assembly. The price shall also cover end fitting for contact & catenary wire and other material required for erection & smooth operation with earthing arrangement. The short neutral assembly to be as per RDSO specification No. TI/SPC/OHE /SNS/0000 Rev.-1 with A&C Slip No.1or latest. Neutral section should be purchase from RDSO/CORE approved source only. The material is suitable for i.e. 65 sq.mm Catenary and 107 sq.mm contact wires. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 2275116.00 Item- 6 Supply without Insulator and erection of a 25 kV single pole isolator without earth contact assembly S No. Item Description of Item Unit Qty Rate Amount No
earth contact assembly The price shall Each cover Supply without Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest.
earth contact assembly The price shall Each cover Supply without Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 687792.00 Item- 7 Supply without Insulators & erection of 25kV Double Pole Isolator S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator.
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator. Total 333136.00 Item- 8 Extra for supply & erection of an earth contact assembly in an isolator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall be payable as extra for Each supply and erection of an earth contact assembly in any isolator. The price shall cover the cost of supply and erection of 3x25 mm copper connections between the earth contact assembly and the structures.
The price shall be payable as extra for Each supply and erection of an earth contact assembly in any isolator. The price shall cover the cost of supply and erection of 3x25 mm copper connections between the earth contact assembly and the structures. Total 46272.00 Item- 9 Supply & erection of large copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 160 sq.mm connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item.
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 160 sq.mm connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item. Total 1258500.00 Item- 10 Supply & erection of small copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item.
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item. Total 105000.00 Supply & erection of a copper jumper (5 mm dia dropper wire) over and Excess of item No.2 Item- 11 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in.
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in. Total 475350.00 Supply of materials and erection of large copper jumper 160 Sq. mm between Aluminium bus and Item- 12 cross feeders S No. Item Description of Item Unit Qty Rate Amount No
See the Tender Document.
See the Tender Document. Total 194880.00 Supply of materials and erection of large copper jumper 160 Sq. mm between cross feeder and Item- 13 OHE. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
This jumper shall be provided between Each copper cross feeders and OHE. The price shall cover supply of 160 sq_mm flexible copper jumper wire, made of annealed standard 100% pure copper conductor as per RDSOs specification Tl/SPC/OHE/JMP/0941 (or latest spec and all components and fittings required for providing a flexible (160 Sq. mm) between copper cross feeder and existing OHE, including Parallel clamps (1030-3 & 1050-3) complete with fasteners etc as required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall cover providing (Supply & Erection) for Provision of anti- falling arrangement for along feeder jumper connected to OHE.
This jumper shall be provided between Each copper cross feeders and OHE. The price shall cover supply of 160 sq_mm flexible copper jumper wire, made of annealed standard 100% pure copper conductor as per RDSOs specification Tl/SPC/OHE/JMP/0941 (or latest spec and all components and fittings required for providing a flexible (160 Sq. mm) between copper cross feeder and existing OHE, including Parallel clamps (1030-3 & 1050-3) complete with fasteners etc as required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall cover providing (Supply & Erection) for Provision of anti- falling arrangement for along feeder jumper connected to OHE. Total 237584.00 Item- 14 Supply and erection of copper strips for equipment earthing. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted.he price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry.
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted.he price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry. Total 158100.00 Item- 15 Supply & erection of Solid copper bus-bars 18mm. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Metre Erection of 18mm solid copper busbar as per latest RDSO/CORE specification or drawing. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Supply & Metre Erection of 18mm solid copper busbar as per latest RDSO/CORE specification or drawing. Total 459450.00 Item- 16 Supply & Erection of Tubular Aluminium Bushars 50x39mm Dia. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Metre Erection of 50/39 mm Al. bus bars procured from CORE approved sources in standard length. Bus bar shall be made of aluminium alloy grade63401 (WP condition to IS:5082- 1981 or latest. The tolerance on diameter & thickness shall be as per Class-I of IS:2673- 1979 or latest. The bus bar shall be clean, smooth, mechanically sound and free from surface and other defects. The open end of bus-bar shall be covered by suitable tube cap. No splicing normally be allowed in the tubular bus-bars, unless the bus-bars exceeds 6M.
The price shall cover cost for Supply & Metre Erection of 50/39 mm Al. bus bars procured from CORE approved sources in standard length. Bus bar shall be made of aluminium alloy grade63401 (WP condition to IS:5082- 1981 or latest. The tolerance on diameter & thickness shall be as per Class-I of IS:2673- 1979 or latest. The bus bar shall be clean, smooth, mechanically sound and free from surface and other defects. The open end of bus-bar shall be covered by suitable tube cap. No splicing normally be allowed in the tubular bus-bars, unless the bus-bars exceeds 6M. Total 385600.00 Supply & Erection of Rigid Bimetallic Terminal Connector Suitable for 50 Dia Aluminium Tubular Item- 17 Busbar to Terminal Pad of 25kV Isolator/CT (RI-11090). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of Rigid Bimetallic Terminal Connector Suitable for 50 Dia Aluminium Tubular Busbar to Terminal Pad of 25kV Isolator/CT (RI-11090) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of Rigid Bimetallic Terminal Connector Suitable for 50 Dia Aluminium Tubular Busbar to Terminal Pad of 25kV Isolator/CT (RI-11090) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 37420.00 Supply & Erection of Expansion Type Terminal Connector to Suit 50 Dia Aluminium Tubular Busbar, Item- 18 Terminal Pad of 25kV CT/Isolator (RI-11060). S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Supply & Each Erection of Expansion Type Terminal Connector to Suit 50 Dia Aluminium Tubular Busbar, Terminal Pad of 25kV CT/Isolator (RI-11060) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of Expansion Type Terminal Connector to Suit 50 Dia Aluminium Tubular Busbar, Terminal Pad of 25kV CT/Isolator (RI-11060) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 66170.00 Supply & Erection of 25kV System Rigid Bus Splice Connector to Suit 50 O/D Aluminium Tube on Item- 19 Both Ways (RI-11180). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of 25kV System Rigid Bus Splice Connector to Suit 50 O/D Aluminium Tube on Both Ways (RI-11180) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of 25kV System Rigid Bus Splice Connector to Suit 50 O/D Aluminium Tube on Both Ways (RI-11180) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 35590.00 Supply & Erection of 25kV System TEE Connector to Suit 50 O/D Aluminium Tubular Busbar (RI- Item- 20 11150). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of 25kV System TEE Connector to Suit 50 O/D Aluminium Tubular Busbar (RI- 11150) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of 25kV System TEE Connector to Suit 50 O/D Aluminium Tubular Busbar (RI- 11150) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 35600.00 Supply & Erection of Rigid Through Connector to Suit 50 Dia Aluminium Tubular Busbar & SPIDER Item- 21 AAC Conductor for 25kV P.T Type-II (RI-11110). S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Supply & Each Erection of Rigid Through Connector to Suit 50 Dia Aluminium Tubular Busbar & SPIDER AAC Conductor for 25kV P.T Type-II (RI- 11110) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of Rigid Through Connector to Suit 50 Dia Aluminium Tubular Busbar & SPIDER AAC Conductor for 25kV P.T Type-II (RI- 11110) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 32290.00 Item- 22 Supply & Erection of 25kV System Expansion Bus Coupler on SI to Suit 50 O/D Al. Tube (RI-11120). S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection of 25kV System Each Expansion Bus Coupler on SI to Suit 50 O/D Al. Tube (RI-11120).
Supply & Erection of 25kV System Each Expansion Bus Coupler on SI to Suit 50 O/D Al. Tube (RI-11120). Total 78490.00 Supply & Erection of 25kV System Tee Connector to Suit 50 O/D Aluminium Tubular Spider AAC Item- 23 Conductor (RI-11140). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of 25kV System Tee Connector to Suit 50 O/D Aluminium Tubular Spider AAC Conductor (RI-11140) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of 25kV System Tee Connector to Suit 50 O/D Aluminium Tubular Spider AAC Conductor (RI-11140) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 32530.00 Supply & Erection of 25kV System Tee to Suit ZEBRA (28.58 Dia) ACSR Conductor on Both Ways Item- 24 (RI-11040). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of 25kV System Tee to Suit ZEBRA (28.58 Dia) ACSR Conductor on Both Ways (RI-11040) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Supply & Each Erection of 25kV System Tee to Suit ZEBRA (28.58 Dia) ACSR Conductor on Both Ways (RI-11040) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 34740.00 Supply & Erection of Rigid Terminal Conductor Suitable for 20 Dia Al. Conductor To Terminal Pad of Item- 25 132/66 kV CB, Isolator & 25kV PT Type I & II (RI-11120). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of Rigid Terminal Conductor Suitable for 20 Dia Al. Conductor to Terminal Pad of 132/66 kV CB, Isolator & 25kV PT Type I & II (RI-11120) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of Rigid Terminal Conductor Suitable for 20 Dia Al. Conductor to Terminal Pad of 132/66 kV CB, Isolator & 25kV PT Type I & II (RI-11120) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 28710.00 Item- 26 Supply & Erection of Rigid Connector On SI To Suit 50 Mm O/D Al. Bus Bar (RI-11200). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of Rigid Connector On SI To Suit 50 Mm O/D Al. Bus Bar (RI-11200) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only.
The price shall cover cost for Supply & Each Erection of Rigid Connector On SI To Suit 50 Mm O/D Al. Bus Bar (RI-11200) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 14370.00 Item- 27 Supply & Erection of Sliding Clamp for 50mm O/D Al. Bus Bar (RI-11190). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each Erection of Sliding Clamp for 50mm O/D Al. Bus Bar (RI-11190) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Supply & Each Erection of Sliding Clamp for 50mm O/D Al. Bus Bar (RI-11190) as per requirement. The price also covers supply of fasteners and bimetallic strip (if applicable). The material shall be procured with latest RDSO specifications and approved source only. Total 20900.00
Item Breakup - 5-Section-V: Insulator for SMLA - TBA Project
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain stay Arm insulator (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 5431860.00 Supply of Insulators for Cantilever assembly vide RE SOR items 4(a)(i) & 4(a)(iii):- Bracket Porcelain Item- 2 (CD-1050 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain Bracket Porcelain insulator (CD- 1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 5211360.00 Item- 3 Supply of 9-Tonne insulators for RE SOR items 4(b)(i) & 4(b)(iii):- Porcelain (CD-1050 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9-Tonne insulators for items 4(b) (i) & 4(b)(iii): Stay Arm Porcelain (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 34038.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD- Item- 4 1050 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 1304790.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 5 1050 mm) DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 239500.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 6 1600 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 176000.00 Item- 7 Supply of 9-Tonne insulators for RE SOR items 9(a), (b), (c), (d)& (e):-Porcelain (CD-1050 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 9(a), (b), (c), (d)& (e):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 567250.00 Item- 8 Supply of 9-Tonne insulator for items 11(a)(i), &11 (a)(ii):- Porcelain (CD-1050 mm) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 11(a) (i), &11 (a)(ii):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 680760.00 Supply of 9-Tonne insulator for items No. 12(a):- Porcelain 9-Tonne (CD-1050 mm) & Sectioning Item- 9 Insulator S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items No. 12(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). DYCEE-C-BRC-ELEC/WESTERN RLY Total 280120.00 Item- 10 Supply of Sectioning Insulators for 12(c) and 12(cx) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item No. 12(c) and 12(cx) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 66664.00 Item- 11 Supply of Post & Operating rod insulators for item 13(a) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 288465.00 Item- 12 Supply of Post & Operating rod insulators for item 13(c) S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(c) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines) Total 576930.00
Item Breakup - 6-Section-VI: Bridge Mast for SMLA - TBA Project
The price shall be covered for Preparation Each of design and drawing of Bridge Mast Fixing arrangement for holding of OHE on Bridge pier. The price also cover cost for design and calculation of bridge OHE mast and its fixings arrangement calculation (holding down bolt calculation, Base plate calculation etc.) and OHE profile calculation for OHE under steel girder Bridge, Web bridge. The price also cover cost for approval of all these drawing and calculation from Railway Competent Authority open line as well as Construction. The price also cover cost for supply minimum 6 sets of Hard copy on paper/tracing with soft copy. The price also cover cost for submission and preparation of as erected drawing, design & calculation. Total 5459.00 DYCEE-C-BRC-ELEC/WESTERN RLY Scanning of RCC piar capes of Bridges with approved scanner detector /Rebar locater to find out the correct locations of reinforcement in piar caps of bridge up to depth of 900mm at various Item- 2 location marking on safe properly and submit the sketch of each location to avoid any damage to reinforcement of piar caps (work will be done under traffic condition with contractor ladder staging protection team and all safety arrangement with contractor tools plants equipments etc.) S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered cost for Each Scanning of RCC piar capes of Bridges with approved scanner detector/Rebar locater to find out the correct locations of reinforcement in piar caps of bridge up to depth of 900mm at various location marking on safe properly and submit the sketch of each location to avoid any damage to reinforcement of piar caps(work will be done under traffic condition with contractor ladder staging protection team and all safety arrangement with contractor tools plants equipment etc.). Total 4118.00 Drilling horizontal/ vertical holes of up to 50 mm dia. in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair to a depth varying from 500 to 1100 mm under line block using pneumatic driller, compressor etc and cleaning the holes using compressor for pressure Item- 3 grouting and removing the rock/ soil/ concrete fallen due to cavity formation and disposal of surplus spoils at locations and also as directed by the engineer -in charge with all lead and lift (all labour and materials by the contractor. the rate is inclusive of providing lighting arrangements.) S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered cost for drilling Each horizontal/ vertical holes of up to 50 mm dia. in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair to a depth varying from 500to 1100 mm under line block as shown in the approved drawing using pneumatic driller, compressor etc using pneumatic driller, compressor etc. and cleaning the holes using compressor for pressure grouting and removing the rock/ soil/concrete fallen due to cavity formation and disposal of surplus spoils at locations and also as directed by the engineer -in charge with all lead and lift. The price shall be covered cost for all required labour and materials arranged by the contractor. The price shall be also covered cost for electricity & lighting arrangements. Total 38208.00 Supply of TGT bolts 25x1350x250 mm dia. Corrugated surface with hex nut, lock nut, Flat washer Item- 4 and spring washer as per RDSO Specification no. TI / SPC / OHE / Fasteners/0120 or latest. S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered cost for Supply Kg o f TGT bolts size of 25x1350x250mm or bolt size shall be vary in length & dia asper calculation submitted by firm and approved by Railway with Corrugated surface with hex nut, lock nut, Flat washer and spring washer as per RDSO Specification no. TI / SPC / OHE /Fasteners/0120 or latest. Total 48000.00 Fixing of bolts of 25mm dia1250mm long up to 1100mm with pressure grouting the existing drilled holes in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair Item- 5 by epoxy goutings UNDER LINE BLOCK conditions at a minimum pressure of 7/kg/cm2 consists of approved quality of epoxy reasin harder and thinner (Araldite, Aradur, Fosroc,& similar make)) by suitable proportions including filler, such as silicon flour etc. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered for Fixing of Each bolts of 25mm dia 1250mm long up to1100mm with pressure grouting the existing drilled holes in the existing stonemasonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair by epoxy grouting at a minimum pressure of7/kg/cm2 consists of approved quality of epoxy reasin harder and thinner (Araldite, Aradur, Fosroc, & similar make)) by suitable proportions including filler, such as silicon flour etc. as recommends by manufacturer the grouting should carried after placing the bolts in position including all operation as per bridge code for epoxy grouting and also as directed by the Engineer -in charge with all lead and lift(all labour, materials and tools and plants like pneumatic driller equipment's, pressure injection, air compressor portable generator etc. by the contractor. The contractor's supply of items such as epoxy, resin and hardener should be provided with necessary test certificate for pot life test, strength test from approved test houses. The rate is also inclusive for providing lighting arrangements while execution). Total 44088.00
Item Breakup - 7-Section-VII: Other than SOR Item for SMLA - TBA Project
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor.
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor. Total 1728720.00 Supply of Nylon/plastic Net- High density polyethelene (HDPE) monofilament netting type-III, UV Item- 2 stabilized s per IS 16008(Part-2)-2016/PVC Virgin HDPE Net Preferably in black colour. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI.
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI. Total 157200.00 Item- 3 Supply of 10 KVA Change over panel as per RDSO spec. suitable for 10 KVA AT supply. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each Erection of 10KVA Change over panel as per RDSO specification No. ETI/SPC/PSI/CLS/0020 or latest and suitable for 10 KVA AT Supply. The price also covers cost of Type one junction box and its drawing required to approval of Dy.CEE/CN. The price also cover cost of MCB, any relay, fittings, Glands, fasteners, Lugs etc. for commissioning of panel and smooth working.
The price shall cover cost for supply & Each Erection of 10KVA Change over panel as per RDSO specification No. ETI/SPC/PSI/CLS/0020 or latest and suitable for 10 KVA AT Supply. The price also covers cost of Type one junction box and its drawing required to approval of Dy.CEE/CN. The price also cover cost of MCB, any relay, fittings, Glands, fasteners, Lugs etc. for commissioning of panel and smooth working. Total 214548.00 Supply of Station Equipments at SP/SSP as per RDSO Spec. No. TI/RCC/ SCADA/0134 with latest Item- 4 A&C slip with amendments. S No. Item Description of Item Unit Qty Rate Amount No
The Price shall cover cost for supply & Each Erection of Remote terminal unit (RTU) for SP/SSP asper RDSO specification No. TI/SPC/RCC/SCADA/0134 or latest and same shall support existing SCADA system at RCC.
The Price shall cover cost for supply & Each Erection of Remote terminal unit (RTU) for SP/SSP asper RDSO specification No. TI/SPC/RCC/SCADA/0134 or latest and same shall support existing SCADA system at RCC. Total 3996920.00 Item- 5 Providing (Supply & erection) of layout board for switching posts. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for providing Each (Supply with erection) of lay-out board for switching post. The board shall be framed with Aluminium section in suitable size. Before supply the board necessary approval should be got from Concern Dy.CEE. Total 14696.00 Item- 6 Providing (Supply & erection) of SWR/Sectioning diagram board at stations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost for providing Each (Supply with Erection) of Sectioning/TWR diagram at Stations or TPC Room. The board shall be framed on 6mm Acroleic Sheet. The price shall also cover the cost of designing for Board. The board should be high resolution printing on Vinyle and to be pasted on acrylic sheet with lamination. The price shall also cover for erection /fixing on site with SS stud. Before supply the board necessary approval should be taken from Concern Dy. CEE. Total 63108.00 Item- 7 Digging of Trench size 450x1000 mm. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover erection of digging of Metre Cable trench 450mm wide and 900mmdepth for laying of different size cable. The price shall also cover for preparation of a detail plan for laying of cable & get approval of Dy.CEE/C before start the work. Total 130000.00 Item- 8 Supply & laying of sand and 2nd class bricks in trenches. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and layings of Metre bricks and sand in cable trench for protection of cable. A detail plan for laying of cable and showing method of laying of cable with bricks and sand shall be prepared and get approval of Dy.CEE/C before start the work. Total 255000.00 Item- 9 Tree Trimming / cutting. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost of all type of Each tree cutting/trimming in section required for charging of OHE. The price shall cover in this schedule which all tree comes within6mtrs from OHE. The price shall cover the cost of tree cutting from bottom. Total 25050.00 Item- 10 Supply & Erection of Fire Bucket with Stand for Switching Post. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the cost of Supply & Set Erection of Fire Bucket with Stand for Switching Post. The work includes the procurement, fabrication, painting, and installation of a complete fire-fighting set at each designated switching post. High- quality galvanized mild steel fire buckets and a heavy-duty steel stand with a protective canopy. Secure installation of the stand at the switching post, typically near the entrance or in a clearly visible, accessible location. The stand should be grouted or firmly bolted to a concrete foundation at the switching post to prevent tipping. Filling of the buckets with clean, dry, and fine-grained sand. All components must comply with RDSO standards and Indian Standard IS 2546. Warranty: Standard tenders often require a warranty period, typically 30 months from delivery. Inspection: Materials are subject to inspection by authorized railway representatives (like RITES or RDSO) before d is p a t c h . Technical specification is as under:- •Fire Buckets: oCapacity: Standard 10 litres. oMaterial: Galvanized mild steel (GMS) with a minimum zinc coating thickness of 0.06 g/cm². oDesign: Round- bottom type to ensure they are not used for general purposes; must have a sturdy handle for easy manual handling. oFinish: Painted with two coats of white paint inside and two coats of signal red paint outside. The word "FIRE" must be painted in black on the outside. •Bucket Stand & Canopy: oFabrication: Made from M.S. Angles (typically 50x50x6mm) and a canopy of 18 SWG MS Sheet to protect the sand from rain. oConfiguration: Usually a 4-bucket or 6-bucket arrangement per stand. oPainting: One coat of red oxide primer followed by two coats of Post Office Red enamel paint. Total 17608.00 Item- 11 Supply & erection of desk for Switching station. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of desk for Switching station. The price shall cover cost for Desk should be made of Wood and boxes/ drawer should be done for keeping register. The price shall also cover cost for fixing arrangement of desk on wall. The material shall be supplied after approval of Dy.CEE/C. The approval for size of desk shall be taken from concern Dy.CEE. Total 9324.00 Item- 12 Supply & Erection of Name board of switching Post. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for Providing Each (supply with erection) of Name board of switching Post. Name board of switching Post shall be supplied from CORE/RDSO approved vendor and material shall be asper RDSO/CORE latest specification. The price shall also cover cost for fixing arrangement of Name Board on fencing. The price shall cover cost of require fasteners for fixing. Total 9944.00 Item- 13 Supply & Erection of Standarad Wooden Isolator Key Box with glass for SSP & Station. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of Standard Wooden Isolator Key Box with glass for SSP &Station. Isolator key box should be made of wooden material with glass in front side. Before supply of this material, Size and item specification shall be got approval from DY.CEE/C. The price shall also cover cost for fixing arrangement on wall. The price shall cover cost of require fasteners for fixing. Total 3934.00 Drilling of horizontal bore below track by pushing method for laying of HDDE pipe of various size Item- 14 upto 450 mm dia. S No. Item Description of Item Unit Qty Rate Amount No
This item covers drilling of horizontal bore Metre by pushing method or any suitable means in all types of soil 1.5 meter below ground level or 2.1 meter below track level for laying of HDDE pipes 150 mm to 450 mm dia by pushing method in presence of Railway representative taking necessary safety precautions of track and movement of trains. Total 264700.00 Modification, Upgradation, testing, wiring & commissioning in existing RTU at Site in the section and standard SCADA software at RCC equipments for configuration, integration/ hooking up of Item- 15 additional RTUs of section & adjacent section with master station as per RDSO Spec. No. TI/RCC/SCADA/134 with latest A&C slip with amendments or latest. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Modification Lumpsum Upgradation, testing & commissioning in existing standard SCADA software at RCC equipment's for configuration, integration/ hooking up of additional RTUs of adjacent section with master station as per RDSO Spec. No. TI/RCC/SCADA/ 0134 with latest amendments. Total 406283.00 Providing utility van for tower wagon crew, shifting of man and material for the work, supervision of Item- 16 work and other misc work S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover providing utility van Month for tower wagon crew, shifting of man and Material for the work, supervision of work and other misc. work. The cost shall cover for Fuelling of Diesel/Petrol in utility van, Maintenance Charges, Toll Taxes etc. The price shall also cover for night working and outstation work. DYCEE-C-BRC-ELEC/WESTERN RLY Total 1347192.00 Item- 17 Supply & erection of fire fighting equipment. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of fire extinguisher confirming to IS:2171 or latest. The firefighting equipment shall be suitable to take care of B & C class of fire. The extinguisher shall have 10 Kg. Capacity of dry chemical powder. The price also cover cost for hanging arrangement / suitable clamps. Total 39808.00 Item- 18 Supply of First aid Box with Strecher etc. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply with erection of Each standard first Aid box and stretcher with hanging arrangement of GI Sheet with pad lock as approved by the Employer. The list of items containing min the first aid box shall be obtained from employer/engineer. Total 4096.00 Erection of Additional contact wire piece across RRA clamp with supply & erection of 02 nos. of PG Item- 19 Clamps on either side (contact wire piece shall be supplied by Railway). S No. Item Description of Item Unit Qty Rate Amount No
The price shall include Supply and fitting of Each 02 Nos. PG clamps on either side of RRA clamp as per RDSO SMI No. TI/MI/00058 Rev-I, dtd 10.08.2021. The additional contact wire of Nos. PG clamps on either side (RI No. 1041-2) as per SMI. The work involves bending and fixing of contact wire as per site requirement. Contract wire will be supplied by Railway. Total 378000.00 Item- 20 Provision of Buried Rail. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of Buried Rail with all required materials except piece of Rail(13mtrs) as per RDSO specification No. TI/SPC/PSI/EARTHING/0210 dtd20.08.2021. The price shall cover cost for Providing Earth electrode with Earth pit, GI Flat size of 75*8 as required for connecting earth electrode to Buried Rail & Buried rail to Running track as mentioned in RDSO specification No.TI/SPC/PSI/EARTHING/0210 dtd20.08.2021. The price shall cover cost for Providing digging, copper rivet, fasteners, Nut bolt, washer, Check nut etc. Rail will be provided by Railway from nearby site/P-way depot. The transportation up to site shall be in contractor's scope. All material except rail shall be supplied by contractor. Total 76000.00 Transportation of Railway supply materials/Released material from Railway depots/work site to Item- 21 Work site/Scrap depot. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The Price shall cover cost for Loading, MT unloading and transportation of all released OHE materials i.e. OHE mast, cantilevers, SI, SP Isolator, Guy rod, insulators, DA, Chair etc. from site to Construction depot. /Scrap depot for DS-8 or as desired by SSE/TRD/C. The price also covers cost for transportation of materials (from OHE depot to Site) which is supplied by Railway and not covered in contractor's supply. The item of transportation of Contact wire, catenary wire, feeder wire and different type of cable shall not be cover under this item. Total 260000.00 Supply of regulating equipment 5 pulley type complete with all accessories including SS wire rope Item- 22 and counter weight assembly for 2400kgf tension as per RDSO Spec. TI/SPC/OHE/ATD/0060(Rev. 2) or latest for conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of regulating Each equipment 3 pulley type complete with all accessories including SS wire rope and counter weight assembly for 2400 kgf tension including 9 Tonne adjuster & 9TPorcelain Insulator CD 1050 mm with double strap assembly, and normal/antitheft guide tube assembly (RI5026-4,5,6,7, 3076-4, 5, 6, 7) including supply of regulating equipment as per RDSO Specification No. TI/SPC/OHE/ATD/0060 Rev.-2 with latest A&C Slip or latest and stainless steel wire rope as per Rly Specification No. TI/SPC/OHE/WR/1060(06/2006) With A &C No.1, 2, 3 & 4 or latest, suitable for 5 Pulley ATD required for regulating equipment suitable for 2400 kgf tension asper latest RDSO drawings & specification and small parts steel work, if any. The price shall also cover supply of anti-falling device (with extra fitting 3241 & 3243-01No. each), anti- climbing (stiffener) Angle on Anchoring, double eye distance rod with fasteners counter weight as per RDSO Drawing and mast fittings for all type mast. The price also covers cost for compliance of Latest Technical circular, MI/SMI's, Reliability action plan etc. (if applicable) Galvanization of all component shall be asper Railway Specification No. No. ETI/OHE/13(4/84) with C.S. No. 4(05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. Hot dip zinc galvanization of Guide tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. The price shall cover the provision of pipe on Hex tie rod of ATD's as per RDSO MI No. TI/MI/0035 Rev-1 dt.28.09.2001 (or latest). The provision on Hex tie rod shall be on ATDs connected on Turnouts, X-overs, Neutral sections, other short tension lengths and tension length with FTA on other end. The length of pipe shall be asper procedure given in RDSO MI. The pipe shall be of 20mm dia GI, medium class asper IS 1161- 1979 (or latest). The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of regulating Each equipment 3 pulley type complete with all accessories including SS wire rope and counter weight assembly for 2400 kgf tension including 9 Tonne adjuster & 9TPorcelain Insulator CD 1050 mm with double strap assembly, and normal/antitheft guide tube assembly (RI5026-4,5,6,7, 3076-4, 5, 6, 7) including supply of regulating equipment as per RDSO Specification No. TI/SPC/OHE/ATD/0060 Rev.-2 with latest A&C Slip or latest and stainless steel wire rope as per Rly Specification No. TI/SPC/OHE/WR/1060(06/2006) With A &C No.1, 2, 3 & 4 or latest, suitable for 5 Pulley ATD required for regulating equipment suitable for 2400 kgf tension asper latest RDSO drawings & specification and small parts steel work, if any. The price shall also cover supply of anti-falling device (with extra fitting 3241 & 3243-01No. each), anti- climbing (stiffener) Angle on Anchoring, double eye distance rod with fasteners counter weight as per RDSO Drawing and mast fittings for all type mast. The price also covers cost for compliance of Latest Technical circular, MI/SMI's, Reliability action plan etc. (if applicable) Galvanization of all component shall be asper Railway Specification No. No. ETI/OHE/13(4/84) with C.S. No. 4(05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. Hot dip zinc galvanization of Guide tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. The price shall cover the provision of pipe on Hex tie rod of ATD's as per RDSO MI No. TI/MI/0035 Rev-1 dt.28.09.2001 (or latest). The provision on Hex tie rod shall be on ATDs connected on Turnouts, X-overs, Neutral sections, other short tension lengths and tension length with FTA on other end. The length of pipe shall be asper procedure given in RDSO MI. The pipe shall be of 20mm dia GI, medium class asper IS 1161- 1979 (or latest). The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 13220580.00 "Supply & Erection of fittings for provision of false catenary ( Catenary ending cone , double strap, Item- 23 contact ending clamp) as per latest Railway HQ/RDSO guideline of false catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 7030.00 "Erection of fittings for provision of false catenary as per latest Railway HQ/RDSO guideline of false Item- 24 catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 1405.00 "Provision of jumpering arrangement (160 sq.mm copper jumper wire) with PG clamp and related Item- 25 fittings for false catenary as per latest Railway HQ/RDSO guideline of false catenary. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 8535.00 Provision of Large-size modified double bolted PG clamps at all G-jumper connections to ensure Item- 26 better electrical continuity and mechanical strength. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 359310.00 Work under Power Block: Any erection work as per schedule done under power and /or Traffic block Item- 27 is subject to have extra rate. S No. Item Description of Item Unit Qty Rate Amount No
The price covers 30% payment done of Lumpsum erection cost of an item under this schedule item which is required Erection under a power block. The price under this item covers extra charges over and above erection rates of items for erection of equipment in the vicinity (less than 2 mtrs) of energized overhead equipment which calls for a power block (shut off of traction power supply). Power block will be arranged by Railway as per suitable demand of contractor. The price payable under this item shall be 30% extra over the erection rates of the items referred to above provide such work is not called for on account of non-compliance with specifications, approved drawings and instructions given by the purchaser from time to time. Total 317137.00
Item Breakup - 8-Section-I: General for Lakodhara Flyover Project
Per Track See the Tender Document. KM Total 141372.00 Item- 2 Marking/Painting of temperature & 'Y'-Measurement of OHE mast at BWA locations. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover for Marking/Painting of Each temperature & 'Y'-Measurement of OHE mast at BWA locations. The contractor is responsible for recording the precise physical measurements of the OHE at the time of final adjustment and painting these values onto the relevant masts. This is specifically required at all BWA (regulated OHE) where tensioning weights are used. The markings must be clear and durable: The mast surface must be cleaned of rust, scale, or grease before painting. Use high- quality enamel paint. Typically, the background is painted with a white/yellow patch, and the letters/numbers are in black or signal red. Measurements must be taken using a calibrated thermometer and a standard measuring tape after the OHE has been "final-tuned" (final tensioning and staggering completed). Markings are usually placed on the face of the mast (the side facing the track) at a height of approximately 1.5 to 2 metres from the rail level for easy visibility from the ground or a motor trolley. Total 2340.00 Supply without insulator and erection of material for termination of Single conductor of Over Head Item- 3 Equipment or terminating wire. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 80148.00 Supply without insulator and erection of anti-creep with Cadmium copper catenary wire in polluted Item- 4 area. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each erection of complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051).
The price shall cover cost for Supply & Each erection of complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 97911.00 Item- 5 Supply without Insulator and erection of cut-in (9 Tonne) Insulator S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051).
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 52880.00 Item- 6 Supply without Insulator and erection of a suspension (9 Tonne) Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings.
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings. Total 87760.00 Item- 7 Supply without Insulator and erection of 25 kV Post Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each erection of 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest.
The price shall cover cost for supply & Each erection of 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest. Total 49800.00 Item- 8 Supply and Installation of cables for L.T. Power supply. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor.
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor.' Total 1170000.00 Item- 9 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (10 kVA). S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 187286.00 Item- 10 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (25 KVA). S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 194679.00 Item- 11 Supply without Insulator of 25 kV D.O. fuse switch. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 37380.00 Item- 12 Transfer of equipment from one mast or support to another. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 231735.00 Item- 13 Dismantling of Over Head Equipment. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 40404.00 Item- 14 Splicing & extension of an anchored overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 85380.00 DYCEE-C-BRC-ELEC/WESTERN RLY Item- 15 Dismantling of a Section Insulator Assembly. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 12376.00 Item- 16 Slewing and Putting Back of OHE in Original Shape. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 16990.00 Item- 17 Dismantling of an Isolator. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 9572.00 Item- 18 Dismantling of a Post / Pedestal Insulator. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 12176.00
Item Breakup - 9-Section-II: Concrete for Lakodhara Flyover Project
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock.
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock. Total 5187000.00
Item Breakup - 10-Section-III: Ferrous for Lakodhara Flyover Project
The price shall cover the cost of supply of MT O, N and R type portals with components as per RDSO's Drg. No (i)ETVC/0008 Sheet No.1 latest Mod for 'N type. (ii)ETI/C/0017 Sheet No.1 latest Mod for 'O type. (iii)ETI/C/0011 Sheet No.1 latest Mod for 'R' t y p e . The structures shall be fabricated from steel conforming to IS-2062f2011 (or latest) Grade - E250 Quality-A IS-808/1989 and galvanised as per RDSOs specification No-ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). The price shall cover, cost of erection, alignment and setting before grouting, wherever required, of portals assembly of boom components and erection of the same. The prices shall also include Supply and erection of galvanised bolts, nuts washers etc. wherever required as per approved designs and drawings. The price shall cover assembling, adjustment and erection of all types of booms including TTC booms and any special structures across the track, not covered under Item The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a portal at platforms. 1.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 2.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 3.The price shall also include the straightening of portal uprights etc bent during transit and cutting of masts/portal uprights to suit the site condition. 4.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 5.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 6.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 7.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 8.Crane will be arranged by railway for Portal boom erection only on demand by contractor. 9.Materials will be supplied at site of work. 10.Payable unit weights for standard mast. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the cost of supply of MT O, N and R type portals with components as per RDSO's Drg. No (i)ETVC/0008 Sheet No.1 latest Mod for 'N type. (ii)ETI/C/0017 Sheet No.1 latest Mod for 'O type. (iii)ETI/C/0011 Sheet No.1 latest Mod for 'R' t y p e . The structures shall be fabricated from steel conforming to IS-2062f2011 (or latest) Grade - E250 Quality-A IS-808/1989 and galvanised as per RDSOs specification No-ETI/OHE/13 (4/84) with A&C slip Nos 1 to 4 (or latest). The price shall cover, cost of erection, alignment and setting before grouting, wherever required, of portals assembly of boom components and erection of the same. The prices shall also include Supply and erection of galvanised bolts, nuts washers etc. wherever required as per approved designs and drawings. The price shall cover assembling, adjustment and erection of all types of booms including TTC booms and any special structures across the track, not covered under Item The price shall also include the cost of repairing platform shelters in case the shelter is dismantled/ removed/damaged during the course of erection of a portal at platforms. 1.Galvanization shall be as per Railway Specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest with galvanization thickness of 1000 gram per sq. meter. 2.In case, required size of channels are not available as per approved drawing, higher size of channels can be used with approval of Dy. Chief Electrical Engineer (construction) and payment as per actual black weight will be paid. 3.The price shall also include the straightening of portal uprights etc bent during transit and cutting of masts/portal uprights to suit the site condition. 4.For standard fabrication of steel work or structures for which RDSO/CORE approved drawing are available, the black steel weight of steel work as specified in RDSO/CORE drawing, shall be considered for payment. 5.However in case the unit sectional weight of any member indicated in RDSO's drawing is not in conformity with the unit sectional weight as per the latest IS specification the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment for the nonstandard fabricated steel work, the calculated weight to be considered for payment under this item shall be included in the relevant drawing based on latest IS sectional weight at the time of submitting the designs for approval of the purchaser. 6.There will be no addition for increased weight due to galvanizing or painting or reduction for holes or screw cut. 7.Galvanization damaged during transportation/ carting will be touch up with cold ZINC paints by tenderer. 8.Crane will be arranged by railway for Portal boom erection only on demand by contractor. 9.Materials will be supplied at site of work. 10.Payable unit weights for standard mast. Total 3403382.00 DYCEE-C-BRC-ELEC/WESTERN RLY Supply and erection of structure steel (traction masts) fabricated and galvanised of all type: B- Item- 2 Series Mast. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 6253382.00 Supply and erection of special fabricated and galvanised steel structures other than portals & Item- 3 traction masts not covered under items 3(b)(i) & 3(b)(ii). S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 2301000.00 Item- 4 Supply only of fabricated steel SPS other than masts. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost of supply only MT of all fabricated steel work excluding fasteners which are required to be supplied by the Contractor. The cost of erection for such steel work, If carried out by the Contractor shall be paid for under Item-III. For standard fabricated steel work for which RDSO'S approved drawings are available, the weight of steel work as specified in RDSOS drawing shall be considered for payment. However, in case the unit sectional weight of any member indicated in RDSOs drawing is not in conformity with the unit sectional weight as per the latest IS specification, the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment For the non- standard fabricated steel work, the calculated weight to be considered for payment under this Item shall be included in the relevant drawing based on, latest IS sectional weight at the time of submitting the designs for approval of the Purchaser. The price shall include the cost of supply of bracket top and bottom mast fittings suitable for PSC masts. Total 1222470.00 Item- 5 Supply and erection of a Guy Rod Assembly. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 245472.00 Item- 6 Supply and erection of 25kV Caution Board / Plate. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site Total 92340.00 Item- 7 Supply without insulator and erection of Single bracket assembly. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 2463200.00 Item- 8 Supply without insulator and erection of a pull off arrangement for one OHE. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. Total 59770.00 Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for Item- 9 conventional/composite OHE. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 933984.00 Item- 10 Supply without Insulator and erection of materials for termination of Double conductor. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all materials Each necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all materials Each necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 112488.00 Item- 11 Supply and erection of a GI structure bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. Total 185400.00 Item- 12 Supply and erection of a GI longitudinal bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. Total 85900.00 Item- 13 Supply & erection of a GI transverse and special bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail.
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY Total 149600.00 Item- 14 Supply & erection of a single earth electrode. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest.
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 84640.00 Item- 15 Supply and erection of 8 SWG G.I. wire for earthing . S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item.
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item. Total 3350.00 Item- 16 Supply and erection of anti-climbing device for L.T. Supply Transformer Stations. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 44010.00 Item- 17 Supply and erection of anti-monkey menace. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design.
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design. Total 213300.00 Item- 18 Supply & Erection of protective screens on ROB/FOB. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE.
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE. Total 159840.00
Item Breakup - 11-Section-IV: Non-Ferrous for Lakodhara Flyover Project
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az) .
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az) . Total 324400.00 Item- 2 Supply and erection of Over Head Equipment only. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 1698210.00 Supply and Erection of copper cross feeder wires (37/2.25 mm HDBC) across the track at Item- 3 SP/SSP/FP/BT locations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 37/2_25 mm. The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 37/2_25 mm. The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. Total 361426.40 Item- 4 Supply without Insulator & erection of a section insulator assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied Contractor.bythe DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied Contractor.bythe Total 223676.00 Item- 5 Supply and Erection of a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and Erection of Each a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly complete assembly. The price shall also cover end fitting for contact & catenary wire and other material required for erection & smooth operation with earthing arrangement. The short neutral assembly to be as per RDSO specification No. TI/SPC/OHE /SNS/0000 Rev.-1 with A&C Slip No.1or latest. Neutral section should be purchase from RDSO/CORE approved source only. The material is suitable for i.e. 65 sq.mm Catenary and 107 sq.mm contact wires. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply and Erection of Each a Ceramic/beaded Glass Fibre type (PTFE) Short Neutral section assembly complete assembly. The price shall also cover end fitting for contact & catenary wire and other material required for erection & smooth operation with earthing arrangement. The short neutral assembly to be as per RDSO specification No. TI/SPC/OHE /SNS/0000 Rev.-1 with A&C Slip No.1or latest. Neutral section should be purchase from RDSO/CORE approved source only. The material is suitable for i.e. 65 sq.mm Catenary and 107 sq.mm contact wires. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 2275116.00 Supply without Insulator and erection of a 25 kV single pole isolator without earth contact Item- 6 assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest.
The price shall cover Supply without Each Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 196512.00 Item- 7 Supply without Insulators & erection of 25kV Double Pole Isolator. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator.
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator. Total 166568.00 Item- 8 Extra for supply & erection of an earth contact assembly in an isolator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall be payable as extra for Each supply and erection of an earth contact assembly in any isolator. The price shall cover the cost of supply and erection of 3x25 mm copper connections between the earth contact assembly and the structures.
The price shall be payable as extra for Each supply and erection of an earth contact assembly in any isolator. The price shall cover the cost of supply and erection of 3x25 mm copper connections between the earth contact assembly and the structures. Total 15424.00 Item- 9 Supply & erection of large copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 105 sq.mm (19/7/1.02mm) connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item.
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 105 sq.mm (19/7/1.02mm) connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item. Total 125850.00 Item- 10 Supply & erection of small copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item.
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item. Total 30000.00 Supply & erection of a copper jumper (5 mm dia dropper wire) over and Excess of item No.2 Item- 11 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in.
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in. Total 63380.00 Supply of materials and erection of large copper jumper 160 Sq. mm between cross feeder and Item- 12 OHE. S No. Item Description of Item Unit Qty Rate Amount No
This jumper shall be provided between Each copper cross feeders and OHE. The price shall cover supply of 160 sq_mm flexible copper jumper wire, made of annealed standard 100% pure copper conductor as per RDSOs specification Tl/SPC/OHE/JMP/0941 (or latest spec and all components and fittings required for providing a flexible (160 Sq. mm) between copper cross feeder and existing OHE, including Parallel clamps (1030-3 & 1050-3) complete with fasteners etc as required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall cover providing (Supply & Erection) for Provision of anti- falling arrangement for along feeder jumper connected to OHE. DYCEE-C-BRC-ELEC/WESTERN RLY
This jumper shall be provided between Each copper cross feeders and OHE. The price shall cover supply of 160 sq_mm flexible copper jumper wire, made of annealed standard 100% pure copper conductor as per RDSOs specification Tl/SPC/OHE/JMP/0941 (or latest spec and all components and fittings required for providing a flexible (160 Sq. mm) between copper cross feeder and existing OHE, including Parallel clamps (1030-3 & 1050-3) complete with fasteners etc as required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall cover providing (Supply & Erection) for Provision of anti- falling arrangement for along feeder jumper connected to OHE. Total 29698.00 Item- 13 Supply and erection of copper strips for equipment earthing. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted the price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry.
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted the price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry. Total 52700.00 Item- 14 Supply & erection of Solid copper bus-bars 18mm. S No. Item Description of Item Unit Qty Rate Amount No
See the tender document.
See the Tender document. Total 153150.00
Item Breakup - 12-Section-V: Insulator for Lakodhara Flyover Project
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain stay Arm insulator (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines) Total 862200.00 Supply of Insulators for cantilever assembly of RE SOR items 4(a)(i) & 4(a)(iii)Bracket Porcelain (CD- Item- 2 1050 mm). DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain Bracket Porcelain insulator (CD- 1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 827200.00 Item- 3 Supply of 9-Tonne insulators for RE SOR items 4(b)(i) & 4(b)(iii):- Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9-Tonne insulators for items 4(b) (i) & 4(b)(iii): Porcelain (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 34038.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD- Item- 4 1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines).' Total 141825.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 5 1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 119750.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 6 1600 mm). S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 105600.00 Item- 7 Supply of 9-Tonne insulators for RE SOR items 9(a), (b), (c), (d)& (e):- Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 9(a), (b), (c), (d)& (e):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 283625.00 Item- 8 supply of 9-Tonne insulator for RE SOR items 11(a)(i), &11 (a)(ii):- Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 11(a) (i), &11 (a)(ii):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 283650.00 supply of 9-Tonne insulator for RE SOR items No. 12(a):- Porcelain 9-Tonne (CD-1050 mm) & Item- 9 Sectioning Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items No. 12(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 56024.00 Item- 10 Supply of Sectioning Insulators for 12(c) and 12(cx). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item No. 12(c) and 12(cx) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 33332.00 Item- 11 Supply of Post & Operating rod insulators for item 13(a). DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 307696.00 Item- 12 Supply of Post & Operating rod insulators for item 13(c). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(c) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines) Total 384620.00
Item Breakup - 13-Section-VI: Bridge Mast for Lakodhara Flyover Project
The price shall be covered for Preparation Each/month of design and drawing of Bridge Mast Fixing arrangement for holding of OHE on Bridge pier. The price also cover cost for design and calculation of bridge OHE mast and its fixings arrangement calculation (holding down bolt calculation, Base plate calculation etc.) and OHE profile calculation for OHE under steel girder Bridge, Web bridge. The price also cover cost for approval of all these drawing and calculation from Railway Competent Authority open line as well as Construction. The price also cover cost for supply minimum 6 sets of Hard copy on paper/tracing with soft copy. The price also cover cost for submission and preparation of as erected drawing, design & calculation. Total 5459.00 Scanning of RCC piar capes of Bridges with approved scanner detector /Rebar locater to find out the correct locations of reinforcement in piar caps of bridge up to depth of 900mm at various Item- 2 location marking on safe properly and submit the sketch of each location to avoid any damage to reinforcement of piar caps (work will be done under traffic condition with contractor ladder staging protection team and all safety arrangement with contractor tools plants equipments etc.) S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall be covered cost for Each Scanning of RCC piar capes of Bridges with approved scanner detector/Rebar locater to find out the correct locations of reinforcement in piar caps of bridge up to depth of 900mm at various location marking on safe properly and submit the sketch of each location to avoid any damage to reinforcement of piar caps(work will be done under traffic condition with contractor ladder staging protection team and all safety arrangement with contractor tools plants equipment etc.). Total 10295.00 Drilling horizontal/ vertical holes of up to 50 mm dia. in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair to a depth varying from 500 to 1100 mm under line block using pneumatic driller, compressor etc and cleaning the holes using compressor for pressure Item- 3 grouting and removing the rock/ soil/ concrete fallen due to cavity formation and disposal of surplus spoils at locations and also as directed by the engineer -in charge with all lead and lift (all labour and materials by the contractor. the rate is inclusive of providing lighting arrangements.) S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered cost for drilling Each horizontal/ vertical holes of up to 50 mm dia. in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair to a depth varying from 500to 1100 mm under line block as shown in the approved drawing using pneumatic driller, compressor etc using pneumatic driller, compressor etc. and cleaning the holes using compressor for pressure grouting and removing the rock/ soil/concrete fallen due to cavity formation and disposal of surplus spoils at locations and also as directed by the engineer -in charge with all lead and lift. The price shall be covered cost for all required labour and materials arranged by the contractor. The price shall be also covered cost for electricity & lighting arrangements. Total 12736.00 Supply of TGT bolts 25x1350x250 mm dia. Corrugated surface with hex nut, lock nut, Flat washer Item- 4 and spring washer as per RDSO Specification no. TI / SPC / OHE / Fasteners/0120 or latest. S No. Item Description of Item Unit Qty Rate Amount No
The price shall be covered cost for Supply Kg of TGT bolts size of 25x1350x250mm or bolt size shall be vary in length & dia asper calculation submitted by firm and approved by Railway with Corrugated surface with hex nut, lock nut, Flat washer and spring washer as per RDSO Specification no. TI / SPC / OHE /Fasteners/0120 or latest. Total 16000.00 Fixing of bolts of 25mm dia1250mm long up to 1100mm with pressure grouting the existing drilled holes in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair Item- 5 by epoxy goutings UNDER LINE BLOCK conditions at a minimum pressure of 7/kg/cm2 consists of approved quality of epoxy reasin harder and thinner (Araldite, Aradur, Fosroc,& similar make)) by suitable proportions including filler, such as silicon flour etc. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall be covered for Fixing of Each bolts of 25mm dia 1250mm long up to1100mm with pressure grouting the existing drilled holes in the existing stonemasonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair by epoxy grouting at a minimum pressure of7/kg/cm2 consists of approved quality of epoxy reasin harder and thinner (Araldite, Aradur, Fosroc, & similar make)) by suitable proportions including filler, such as silicon flour etc. as recommends by manufacturer the grouting should carried after placing the bolts in position including all operation as per bridge code for epoxy grouting and also as directed by the Engineer -in charge with all lead and lift(all labour, materials and tools and plants like pneumatic driller equipment's, pressure injection, air compressor portable generator etc. by the contractor. The contractor's supply of items such as epoxy, resin and hardener should be provided with necessary test certificate for pot life test, strength test from approved test houses. The rate is also inclusive for providing lighting arrangements while execution). Total 14696.00
Item Breakup - 14-Section-VII: Other than SOR for Lakodhara Flyover Project
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor.
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor. Total 274400.00 Supply of Nylon/plastic Net- High density polyethelene (HDPE) monofilament netting type-III, UV Item- 2 stabilized s per IS 16008(Part-2)-2016/PVC Virgin HDPE Net Preferably in black colour. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI.
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI. Total 39300.00 Item- 3 Supply of 10 KVA Change over panel as per RDSO spec. suitable for 10 KVA AT supply. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each Erection of 10KVA Change over panel as per RDSO specification No. ETI/SPC/PSI/CLS/0020 or latest and suitable for 10 KVA AT Supply. The price also covers cost of Type one junction box and its drawing required to approval of Dy.CEE/CN. The price also cover cost of MCB, any relay, fittings, Glands, fasteners, Lugs etc. for commissioning of panel and smooth working.
The price shall cover cost for supply & Each Erection of 10KVA Change over panel as per RDSO specification No. ETI/SPC/PSI/CLS/0020 or latest and suitable for 10 KVA AT Supply. The price also covers cost of Type one junction box and its drawing required to approval of Dy.CEE/CN. The price also cover cost of MCB, any relay, fittings, Glands, fasteners, Lugs etc. for commissioning of panel and smooth working. Total 71516.00 Item- 4 Providing (Supply & erection) of SWR/Sectioning diagram board at stations. S No. Item Description of Item Unit Qty Rate Amount No
The Price shall cover cost for supply & Each Erection of Remote terminal unit (RTU) for SP/SSP asper RDSO specification No. TI/SPC/RCC/SCADA/0134 or latest and same shall support existing SCADA system at RCC. Total 42072.00 Item- 5 Digging of Trench size 450x1000 mm. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for providing Metre (Supply with erection) of lay-out board for switching post. The board shall be framed with Aluminium section in suitable size. Before supply the board necessary approval should be got from Concern Dy.CEE. Total 39000.00 Item- 6 Supply & laying of sand and 2nd class bricks in trenches. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost for providing Metre (Supply with Erection) of Sectioning/TWR diagram at Stations or TPC Room. The board shall be framed on 6mm Acroleic Sheet. The price shall also cover the cost of designing for Board. The board should be high resolution printing on Vinyle and to be pasted on acrylic sheet with lamination. The price shall also cover for erection /fixing on site with SS stud. Before supply the board necessary approval should be taken from Concern Dy. CEE. Total 76500.00 Item- 7 Tree Trimming / cutting. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover erection of digging of Each Cable trench 450mm wide and 900mmdepth for laying of different size cable. The price shall also cover for preparation of a detail plan for laying of cable & get approval of Dy.CEE/C before start the work. Total 7515.00 Item- 8 Supply & Erection of Standarad Wooden Isolator Key Box with glass for SSP & Station. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of Standard Wooden Isolator Key Box with glass for SSP &Station. Isolator key box should be made of wooden material with glass in front side. Before supply of this material, Size and item specification shall be got approval from DY.CEE/C. The price shall also cover cost for fixing arrangement on wall. The price shall cover cost of require fasteners for fixing. Total 1124.00 Drilling of horizontal bore below track by pushing method for laying of HDDE pipe of various size Item- 9 upto 450 mm dia. S No. Item Description of Item Unit Qty Rate Amount No
This item covers drilling of horizontal bore Metre by pushing method or any suitable means in all types of soil 1.5 meter below ground level or 2.1 meter below track level for laying of HDDE pipes 150 mm to 450 mm dia by pushing method in presence of Railway representative taking necessary safety precautions of track and movement of trains. Total 264700.00 Providing utility van for tower wagon crew, shifting of man and material for the work, supervision of Item- 10 work and other misc work. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover providing utility van Month for tower wagon crew, shifting of man and Material for the work, supervision of work and other misc. work. The cost shall cover for Fuelling of Diesel/Petrol in utility van, Maintenance Charges, Toll Taxes etc. The price shall also cover for night working and outstation work. Total 336798.00 Erection of Additional contact wire piece across RRA clamp with supply & erection of 02 nos. of PG Item- 11 Clamps on either side (contact wire piece shall be supplied by Railway). S No. Item Description of Item Unit Qty Rate Amount No
The price shall include Supply and fitting of Each 02 Nos. PG clamps on either side of RRA clamp as per RDSO SMI No. TI/MI/00058 Rev-I, dtd 10.08.2021. The additional contact wire of Nos. PG clamps on either side (RI No. 1041-2) as per SMI. The work involves bending and fixing of contact wire as per site requirement. Contract wire will be supplied by Railway. Total 54000.00 Item- 12 Provision of Buried Rail. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of Buried Rail with all required materials except piece of Rail(13mtrs) as per RDSO specification No. TI/SPC/PSI/EARTHING/0210 dtd20.08.2021. The price shall cover cost for Providing Earth electrode with Earth pit, GI Flat size of 75*8 as required for connecting earth electrode to Buried Rail & Buried rail to Running track as mentioned in RDSO specification No.TI/SPC/PSI/EARTHING/0210 dtd20.08.2021. The price shall cover cost for Providing digging, copper rivet, fasteners, Nut bolt, washer, Check nut etc. Rail will be provided by Railway from nearby site/P-way depot. The transportation up to site shall be in contractor's scope. All material except rail shall be supplied by contractor. Total 38000.00 Transportation of Railway supply materials/Released material from Railway depots/work site to Item- 13 Work site/Scrap depot. S No. Item Description of Item Unit Qty Rate Amount No
The Price shall cover cost for Loading, MT unloading and transportation of all released OHE materials i.e. OHE mast, cantilevers, SI, SP Isolator, Guy rod, insulators, DA, Chair etc. from site to Construction depot. /Scrap depot for DS-8 or as desired by SSE/TRD/C. The price also covers cost for transportation of materials (from OHE depot to Site) which is supplied by Railway and not covered in contractor's supply. The item of transportation of Contact wire, catenary wire, feeder wire and different type of cable shall not be cover under this item. Total 104000.00 DYCEE-C-BRC-ELEC/WESTERN RLY "Supply & Erection of fittings for provision of false catenary ( Catenary ending cone , double strap, Item- 14 contact ending clamp) as per latest Railway HQ/RDSO guideline of false catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 16872.00 "Erection of fittings for provision of false catenary as per latest Railway HQ/RDSO guideline of false Item- 15 catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 3372.00 "Provision of jumpering arrangement (160 sq.mm copper jumper wire) with PG clamp and related Item- 16 fittings for false catenary as per latest Railway HQ/RDSO guideline of false catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 20484.00 Provision of Large-size modified double bolted PG clamps at all G-jumper connections to ensure Item- 17 better electrical continuity and mechanical strength. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 102660.00 Work under Power Block: Any erection work as per schedule done under power and /or Traffic block Item- 18 is subject to have extra rate. S No. Item Description of Item Unit Qty Rate Amount No
The price covers 30% payment done of Lumpsum erection cost of an item under this schedule item which is required Erection under a power block. The price under this item covers extra charges over and above erection rates of items for erection of equipment in the vicinity (less than 2 mtrs) of energized overhead equipment which calls for a power block (shut off of traction power supply). Power block will be arranged by Railway as per suitable demand of contractor. The price payable under this item shall be 30% extra over the erection rates of the items referred to above provide such work is not called for on account of non-compliance with specifications, approved drawings and instructions given by the purchaser from time to time. Total 168688.00
Item Breakup - 15-Section-I: General for Y connecion Vishwamitri to Pratapnagar Project
Per Track See the Tender document. KM Total 70686.00 Item- 2 Marking/Painting of temperature & 'Y'-Measurement of OHE mast at BWA locations. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover for Marking/Painting of Each temperature & 'Y'-Measurement of OHE mast at BWA locations. The contractor is responsible for recording the precise physical measurements of the OHE at the time of final adjustment and painting these values onto the relevant masts. This is specifically required at all BWA (regulated OHE) where tensioning weights are used. The markings must be clear and durable: The mast surface must be cleaned of rust, scale, or grease before painting. Use high- quality enamel paint. Typically, the background is painted with a white/yellow patch, and the letters/numbers are in black or signal red. Measurements must be taken using a calibrated thermometer and a standard measuring tape after the OHE has been "final-tuned" (final tensioning and staggering completed). Markings are usually placed on the face of the mast (the side facing the track) at a height of approximately 1.5 to 2 metres from the rail level for easy visibility from the ground or a motor trolley. Total 1260.00 Supply without insulator and erection of material for termination of Single conductor of Over Head Item- 3 Equipment or terminating wire. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply without Each insulator and erection of all material necessary for the termination of Single conductor of overhead equipment terminating wire on a traction mast or structure including clevis assembly, with fitting and porcelain 9 tonne insulator assembly (for polluted zone) but excluding terminating wire if any, wherever double termination if required. Materials like equalizing /compensating double strap assembly. It includes the all fasteners required for termination. The price shall also cover Supply without Insulator and erection of materials for Provision of Double composite insulators at termination locations in platform areas to enhance reliability and safety, Anti-Creep, FTAs, etc. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 46753.00 Supply without insulator and erection of anti-creep with Cadmium copper catenary wire in polluted Item- 4 area. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Each erection of complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051).
The price shall cover cost for Supply & Each erection of complete Anti-creep assembly including 9T insulators, Terminations, copper anti creep wire etc. over and above as included in item no. E39. The copper wire will be supplied by railway from concern SSE's store. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 32637.00 Item- 5 Supply without Insulator and erection of cut-in (9 Tonne) Insulator S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051).
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain cut-in- insulator including Double strap, Catenary wire or contact wire ending cone etc. as per latest RDSO/CORE specification. The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Total 21152.00 Item- 6 Supply without Insulator and erection of a suspension (9 Tonne) Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings.
The price shall cover cost for supply & Each erection of complete 25 KV solid core long creepage Porcelain suspension insulator assembly including Double strap, single eye clevis, suspension clamp etc. as per latest RDSO/CORE specification and drawings. Total 21940.00 Item- 7 Supply without Insulator and erection of 25 kV Post Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each erection of 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest.
The price shall cover cost for supply & Each erection of 25KV Post Insulator with fasteners and saddles as per RDSO specification No. TI/SPC/OHE/INS/0071 or latest. Total 19920.00 Item- 8 Supply and Installation of cables for L.T. Power supply. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor.
Supply and Installation of cables for L.T. Metre Power supply of PVC insulated 2 core, 70 Sqmm, heat resisting insulation cable, ISI marked PVC outer sheeted (FRLSH) of type ST-2 cable (FR-LSH) armoured with aluminium conductor having insulation of PVC Type C suitable for rated voltage at 1100 Volts & confirming to IS:1554 (Part1)/1988 (Reaffirmed 2005) or latest and the cable will be used for fixed/stable wiring with Stranded & Shaped conductor, Aluminium grade H2 or H4 for better Thermal stability i.e. ST-2 and tensile strength of conductor. Total 1170000.00 Item- 9 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (10 kVA). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 10 KVA as per RDSO specification No. ETl/PSl/15(8-2003) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc.
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 10 KVA as per RDSO specification No. ETl/PSl/15(8-2003) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc. Total 187286.00 Item- 10 Supply, Erection, oil-filtration, testing and commissioning of L.T. supply transformers (25 KVA). S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 25 KVA as per RDSO specification No. ETl/PSl/15(8 /03) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14 (1/86) Rev 1 (Apr•87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc.
The price shall cover cost for supply, Each Erection, oil-filtration, testing and commissioning of Auxiliary Transformer 25 kV/230 V, 25 KVA as per RDSO specification No. ETl/PSl/15(8 /03) or latest, with 25 KV DO fuse complete assembly including insulators as per RDSO Specification No. ETl/ PSl/14 (1/86) Rev 1 (Apr•87), LV box (including MCB) for AT & Anti climbing device complete including barbed wires etc. the price also cover cost for Clamps, lugs, Name Plate, split arcing horn etc. Total 194679.00 Item- 11 Supply without Insulator of 25 kV D.O. fuse switch. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply, Each Erection, testing and commissioning of 25 KV DO fuse complete assembly excluding insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87).
The price shall cover cost for supply, Each Erection, testing and commissioning of 25 KV DO fuse complete assembly excluding insulators as per RDSO Specification No. ETl/ PSl/14(1/86) Rev 1 (Apr87). Total 37380.00 Item- 12 Transfer of equipment from one mast or support to another. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover transfer of overhead Each equipment to a bracket assembly on a new mast or support and dismantling of the erected bracket assembly from the old mast of support and consequent adjustment to overhead equipment required such as re-spacing of droppers (including cost of dropper wire), levelling etc. the foundation and steel work and bracket assembly for the new mast or structure will be paid for under appropriate Items and 4 respectively.
The price shall cover transfer of overhead Each equipment to a bracket assembly on a new mast or support and dismantling of the erected bracket assembly from the old mast of support and consequent adjustment to overhead equipment required such as re-spacing of droppers (including cost of dropper wire), levelling etc. the foundation and steel work and bracket assembly for the new mast or structure will be paid for under appropriate Items and 4 respectively. Total 99315.00 Item- 13 Dismantling of Over Head Equipment. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling of Kilometre equipment including Terminations, tensioning devices, guy rod assemblies bracket assemblies and associated small parts steel work (excluding components embedded in concrete) The price also cover cost for cutting of catenary wire, contact wire and other materials for DS-8 purpose (if required) and same will be handed over to concern SSE/C, Railways scrap depot for DS-8 or as desired by SSE/TRD/C. Transportation charges will be given relevant item of transportation. Total 10101.00 Item- 14 Splicing & extension of an anchored overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover splicing of terminated Each overhead equipment for extension and consequent adjustment of the affected equipment The dismantled equipment (excluding portions embedded in concrete) shall be returned to the Purchaser's Engineer The cost of dismantling of overhead equipment would be paid for under Item 31(d) for the whole length of the anchoring span Irrespective of the physical position of the splices. The extended overhead equipment shall be deemed as starting from the center line of the structure preceding the old terminating structure and the extended overhead equipment shall be paid for under Item 6(az) or 6(bz) or 6(cz) as applicable. Total 34152.00 Item- 15 Dismantling of a Section Insulator Assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling Each 107 sq mm contact wire, 65 sq mm catenary wire, dropper wire and a section insulator, splicing of catenary and contact wires and the necessary adjustments to droppers. The price shall exclude the supply of required copper conductors for the adjustment. The dismantled equipment shall be handed over to the Purchaser's Engineer at the spot of dismantling or at the contactor's Depot's.
The price shall cover cost of dismantling Each 107 sq mm contact wire, 65 sq mm catenary wire, dropper wire and a section insulator, splicing of catenary and contact wires and the necessary adjustments to droppers. The price shall exclude the supply of required copper conductors for the adjustment. The dismantled equipment shall be handed over to the Purchaser's Engineer at the spot of dismantling or at the contactor's Depot's. Total 12376.00 Item- 16 Slewing and Putting Back of OHE in Original Shape. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover for temporary slewing Sqm or lowering of erected OHE adjusted and unadjusted to ground for special works, at the request of the Purchaser and restoration and re-adjustment of the equipment after completion of special works. The price shall be per span or part thereof, including anchoring spans. Additional components or materials used during such restoration or re-adjustment will be paid for at rates included in schedule 3 plus handling charges of provided such use has, in the opinion of the Purchaser, become necessary due to reasons beyond the control of the Contractor. Total 16990.00 Item- 17 Dismantling of an Isolator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for dismantle of Each complete isolator including terminal connectors, jumper wire, PG clamps operating rod and support insulators, operating handle and SPS. Transportation charges will be given relevant item of transportation. Total 4786.00 Item- 18 Dismantling of a Post / Pedestal Insulator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost of dismantling of Each an isolator, single or gang-operated, including dismantling of connections to the over-head equipment and associated small parts steel work. Total 9132.00
Item Breakup - 16-Section-II: Concrete for Y connection Vishwamitri to Pratapnagar Project
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock.
The price shall include all works mentioned cum in Item 2(a) in all classes of soil except hard soil, concrete or masonry drains and walls and rock. Total 2394000.00
Item Breakup - 17-Section-III Ferrous for Y connection Vishwamitri to Pratapnagar Project
See the Tender document.
See the Tender document. Total 938864.00 Supply and erection of structure steel (traction masts) fabricated and galvanised of all type: B- Item- 2 Series Mast S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. DYCEE-C-BRC-ELEC/WESTERN RLY Total 2521525.00 Supply and erection of special fabricated and galvanised steel structures other than portals & Item- 3 traction masts not covered under items 3(b)(i) & 3(b)(ii). S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 1035450.00 Item- 4 Supply only of fabricated steel SPS other than masts. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost of supply only MT of all fabricated steel work excluding fasteners which are required to be supplied by the Contractor. The cost of erection for such steel work, If carried out by the Contractor shall be paid for under Item-III. For standard fabricated steel work for which RDSO'S approved drawings are available, the weight of steel work as specified in RDSOS drawing shall be considered for payment. However, in case the unit sectional weight of any member indicated in RDSOs drawing is not in conformity with the unit sectional weight as per the latest IS specification, the weight of the fabricated steel work shall be calculated on the basis of latest IS specification and the same will be considered for payment For the non- standard fabricated steel work, the calculated weight to be considered for payment under this Item shall be included in the relevant drawing based on, latest IS sectional weight at the time of submitting the designs for approval of the Purchaser. The price shall include the cost of supply of bracket top and bottom mast fittings suitable for PSC masts. Total 611235.00 Item- 5 Supply and erection of a Guy Rod Assembly. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 122736.00 Item- 6 Supply and erection of 25kV Caution Board / Plate. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover price of material Each including Caution Boards, SPS Items, nuts, bolts etc. as required and erection charges Caution Boards shall be of two types. (i)General Caution Notice at entrance to Railway station (Hindi & English) No. ETI/OHE/G/7551 Mod-C (or latest) (ii) Caution Plate 25000 V No. ETI/OHE/Gf7531 Mod-C (or latest) (iii) Price shall be inclusive of Sales tax, Excise duty, Freight etc Boards shall require to be installed on a steel structure/Rail post/wall of a building therefore mode of erection shall be as per requirement of the site Total 30780.00 Item- 7 Supply without insulator and erection of Single bracket assembly. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 985280.00 Item- 8 Supply without insulator and erection of a pull off arrangement for one OHE. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a pull-off arrangement to pull one equipment only including supply Of copper conductors, small jumper(50) wire, head-span mast fittings complete with M.S. angle, equalising plate assembly, steady-arm, catenary dropper clip, contact wire swivel clip and fittings excluding solid core insulators (Cost of insulator will be paid in Schedule-I, Section-5). The price shall cover erection of all components including solid core insulators; small jumper wire and conductors. Note:- (i)For composite OHEI a catenary dropper clip with necessary bimetallic strip/ washer to be used in place of catenary dropper clip (Id. No. 1192). (ii) 5 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper for all locations except for those on long Girder Bridges, where wear rate is high for which 7 mm diameter Hard drawn Copper wire shall be used for Register Arm Dropper. Total 23908.00 Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for Item- 9 conventional/composite OHE. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 544824.00 Item- 10 Supply without Insulator and erection of materials for termination of Double conductor. S No. Item Description of Item Unit Qty Rate Amount No
conductor The price shall cover supply of all Each materials necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
conductor The price shall cover supply of all Each materials necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure, including appropriate mast anchoring clevis assembly, two adjusters, ending damps for catenary and contact wires, anchor double strap assembly. equalising/ compensating plate and fittings including 9 tonne insulators (Cost Of insulator will be paid in Schedule-I, Section-5), assembly and terminating wirer if any. However, the price shall cover erection of all materials including the 9-tonne insulator assembly. The ending clamp shall be installed correctly duly following instruction given in RDSO SMI No. TI/MI/0051 dt. 08.12.2017 (latest). The price shall cover supply & erection (Provision) of fluorescent red tape before ending cone. (As per RDSO SMI No. TI/MI/0037 Rev-3 and TI/MI/0051). Hot dip zinc galvanization of SPS shall be 1000 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 65618.00 Item- 11 Supply and erection of a GI structure bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a structure bond of GI flat 40 x 6 mm required to connecting a traction mast or structures to the nearest non track circuited rail, or earth electrode including all fasteners at both ends. Connection of structure bond to Rail in track circuiting area shall be done as per HQ letter No.El94/15/1(Comp. No. 677982) dated: 17.10.2025 The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. Total 148320.00 Item- 12 Supply and erection of a GI longitudinal bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY
1.The price shall cover for Supply and Each erection of a longitudinal bond of GI flat 40 x 6 mm required an electrical connection across a rail joint between consecutive lengths of rails including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. Total 42950.00 Item- 13 Supply & erection of a GI transverse and special bond. S No. Item Description of Item Unit Qty Rate Amount No
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail.
1.The price shall cover for Supply and Each erection of a transverse and special bond of GI flat 40 x 6 mm, required a bond between two rails of a track or two rails of adjacent tracks including all fasteners at both ends. The galvanization shall be done as per RDSO specification No. ETI/OHE/13(4/84) with C.S. No. 4 (05/2018) or latest ensuring quality of zinc, base metal, surface preparation. The weight of Zinc coating to be adopted is 750g/sqm. If galvanization is damaged due to hole drilling, welding, cutting, handling, erection etc. the rectification shall be done as per clause 8 of RDSO specification No. ETI/OHE/13(4/84) with ACS 1-4 (using zinc based solder/zinc based paints). 2.The price shall include shaping and drilling of the bond. 3.The price shall also include provision of heat shrinkable PVC sleeve & HDPE pipe as per latest guideline for structure bond under track circuited rail. DYCEE-C-BRC-ELEC/WESTERN RLY Total 44880.00 Item- 14 Supply & erection of a single earth electrode. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest.
The price shall cover supply of an earth Each electrode assembly as per RDSO Drawing No.ETI/PSI/222 Rev-A & ETI/OHE/P/7021 or latest & RDSO specification No. TI/SPC/OHE/Fittings/0130 with A&C Slip No1, ETI-OHE-13 (4-84) may 2018, TI/SPC/OHE/Fittings/0130-10/13-Rev-1 with all accessories & fasteners for switching station of 4.00 mtrs length. The price also covers the provision of a protective concrete box with removable cover. Hot dip zinc galvanization of earth electrode tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 33856.00 Item- 15 Supply and erection of 8 SWG G.I. wire for earthing. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item.
The price shall cover Supply and erection of Metre 8 SWG G.I. wire for earthing of control panels, L.T. AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing panel earthing to the nearest fencing upright shall also be included and paid for under this item. Total 3350.00 Item- 16 Supply and erection of anti-climbing device for L.T. Supply Transformer Stations. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 29340.00 Item- 17 Supply and erection of anti-monkey menace. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design.
The price shall include supply and Each fabrication of Anti Monkey scare measure for OHE mast at Monkey menace prone areas as per RDSO SMI No. TI/MI/0056 Rev- 2 or ltest. The AMCD shall be barbed wire frame type as per Drg no TI/SK/OHE/ANTIMON/RDSO/00001/08/0 given in Annexure I OR Cylindrical arrangement as per drawing given in Annexure II. Location and type of AMCD shall be jointly decided by SSE/Elect/Construction and SSE/TRD and approved by Sr.DEE/TRD. One sample for each type of OHE mast /Structure is to be fabricated and submitted to concern SSE for approval before utilization at site. Any modification suggested by concern SSE based on practical implication must be incorporated in the design. Total 127980.00 Item- 18 Supply & Erection of protective screens on ROB/FOB. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE.
The price shall include design, supply, Set fabrication & erection of of continuous protective screens across the entire span of ROBs and FOBs passing over electrified tracks (Provision of continuous protective screen on FOB and ROB from inside shall be done) as per the RDSO latest drawing No. ETI/C/0068 Mod-H. The price shall cover all materials required for fabrication, including steel angles, tees, expanded metal (Jali), GI sheets, and paints. The price shall also include labour charges for fabrication, transportation, painting, and erection at specified locations. All works must strictly adhere to the Research Designs and Standards Organisation (RDSO) guidelines. Fabrication and erection must follow RDSO Drawing No. ETI/C/0068 Mod-I (latest revision). For ROBs, a parapet wall height of 1.80m must be ensured. If the existing wall is lower, a standard protective screen of 1.80m must be provided. Protective screens must be fixed inside the FOB/ROB structure to prevent any components from falling onto the live Over Head Equipment (OHE) wires. All gaps under the screens must be properly closed to prevent rainwater from seeping onto the OHE. Total 159840.00
Item Breakup - 18-Section-IV: Non-Ferrous for Y connection Vishwamitri to Pratapnagar Project
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az)
The price shall cover supply and erection of Metre a large span wire (130) per meter The payable length in case of head span wires shall be the horizontal distance between the inner faces of all traction masts/structure on which the mast attachments are mounted. and in case of Large Span Wire, the actual length shall be measured at the time of erection. No extra payment shall be made on account of the sag Erections of a meter beyond the first decimal shall be rounded off to the nearest first decimal. NOTE: The quantity for which the payment is made for the supply and erection of large span wire under this Item shall be deducted from the corresponding length in the span for which payment is made under Item 6(az) Total 405500.00 Item- 2 Supply and erection of Over Head Equipment only. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document.
See the Tender document. Total 566070.00 Supply and Erection of copper cross feeder wires (37/2.25 mm HDBC) across the track at Item- 3 SP/SSP/FP/BT locations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 37/2_25 mm. The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply and Kilometre erection of 25 kV feeder wire across/along the track at the location of SP/SSP/FP/BT/Gantries stations. Feeder wire shall be made of hard drawn bare copper conductor of size 37/2_25 mm. The price shall be inclusive of cost of feeder wire but exclusive of termination (which will be paid under Item 8(b)(ix) and small parts steel work complete with bolts, nuts etc if any. The price shall cover supply & erection for Provision of anti-falling arrangement for along feeder jumper connected to OHE. Total 361426.40 Item- 4 Supply without Insulator & erection of a section insulator assembly S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied Contractor.bythe DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of all Each components required for a standard section insulator assembly (serving both the overhead equipment conductors) including supply of dropper wires for special droppers for supporting the equipment and all terminal fittings for conductors and the section insulator assembly including 9 tonne Insulator (RI No.6020) (Cost of insulator will be paid in Schedule-I, Section- 5) on the catenary and Sectioning insulator (RI No.6110). The price shall be exclusive of Contact and Catenary wires, required if any. The price shall cover erection and adjustment of all components including section insulator assembly, 9-ton insulator on the catenary, Sectioning Insulator, Contact wire and droppers. Required quantity of Contact wire for the work shall be supplied by the purchaser. Rly. Ident. No.Description of componentsQty. per unit 1120 or 1120-1(1122 & 1123Catenary ending clamp2 set 1192,'ET1/OHE/SK/333.Catenary dropper dip assemblyAs required 6170Parallel clamp for double contact wire12 set 6180Section insulator dropper assembly3 set 6100Section insulator assemblyTO be supplied Contractor.bythe 60209 tonne insulator assemblyTo be supplied Contractor.bythe Total 223676.00 Supply without Insulator and erection of a 25 kV single pole isolator without earth contact Item- 5 assembly. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply without Each Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover Supply without Each Insulator and erection of a 25 KV, 1600A Single pole isolator complete for SP/SSP's and OHE's as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 and 2 or latest, with mounting base (including 25 KV pedestal insulators-2 Nos. and operating rod insulators- 1 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, integral lock, a 50 mm Brass pad- lock (Make - Godrej, Link), copper jumper for earthing and an Enameled number plate of approved design for each isolator. Hot dip zinc galvanization of operating tube shall be 800 gram/sqmtr as per A&C correction slip no.4 of ETI/OHE/13(4/84) or latest. Total 196512.00 Item- 6 Supply without Insulators & erection of 25kV Double Pole Isolator. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator.
The price shall cover Supply & Erection of a Each 25 KV, 3150A Double pole isolator complete as per RDSO specification No. TI/SPC/PSI/ISOLTR/0210 with ACS Slip No.1 or latest, with mounting base (including 25 KV pedestal insulators-4 Nos. and operating rod insulators-2 Nos.), operating rod and operating rod guides required for the operation of the isolator. The price shall also cover supply of Al/Cu strips, Integral lock, a 50 mm Brass pad-lock (Make - Godrej), flexible copper jumper for earthing and an Enameled number plate of approved design for each isolator. Total 83284.00 Item- 7 Supply & erection of large copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 105 sq.mm (19/7/1.02mm) connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item.
The price shall cover the supply of large Each jumper wire size 160 sqmm made of annealed stranded 100% pure copper conductor as per RDSO's specification No. TI/SPC/OHE/JMP/0941 or latest and on a flat rate basis, the supply of all components and fittings required for providing a flexible copper large jumper connection, including supply of parallel damps, bi-metallic and Aluminium Copper Al-Cu strips, wherever required, and bolted type terminal connectors where ever required The price shall also cover the erection of the complete jumper assembly including jumper Wire. The price shall not, however be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any jumper of 105 sq.mm (19/7/1.02mm) connections in any combination between feeders, lightening arrestors, isolators and boosters' stations. Continuity jumper at Boom anchor anti-creep will be payable under this Item. Total 83900.00 Item- 8 Supply & erection of small copper jumpers over and Excess of item No.2 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item.
The price shall cover supply of small jumper Each wire size 50sq mm (19/1.80 mm) made of annealed stranded pure copper conductor as per as per RDSO/CORE latest drawing and specification No. TI/SPC/OHE/JMP/0941 or latest , and on a flat rate basis, the supply of all components and fittings required for providing a flexible small copper jumper connection, including supply of parallel clamps, Aluminium Copper (Al- Cu) bi-metallic strips, wherever required, and bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire. The price shall not, however, be applicable for jumper connections already including under Item 6(az) and 10, but shall be applicable for any small jumper connection in any combination required for lightening arresters and Isolators etc. Anti-theft jumper as per drawing No. ETI/OHE/G/05107, with latest mod. for connecting out-of-run OHE with the in running OHE at insulated/un-insulated over- lap locations and also anticreep locations at polluted zone wherever considered necessary will be payable under this Item. Total 15000.00 Supply & erection of a copper jumper (5 mm dia dropper wire) over and Excess of item No.2 Item- 9 Overhead equipment. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in.
The conductors/jumper wires, and on a flat rate basis, the supply of all components and fittings required for providing a single strand/flexible copper jumper connections not included under Items 6(az), 107 15(a) (ii) & 15(az)(iii), including supply of parallel clamps, Aluminium Copper (Al-Cu) bi- metallic strips, wherever required, including supply of bolted type terminal connector where ever required. The price shall also cover the erection of the complete jumper assembly including jumper wire, to be provided between the Overhead equipment and LT. Transformers, drop out switch. Note: In case the required length of jumper wires vary from the lengths given in column (4) of Annexure-6; the payment/deduction towards the extra/short length of jumper wires supplied 15(d) & 15(e) will be made at the rates given in. Total 63380.00 Item- 10 Supply and erection of copper strips for equipment earthing. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted.he price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry.
The price shall cover supply and erection of Metre 25mmx3mm copper strips to connect the earth terminals of equipments like potential transformers, lightening arrestors, L.T supply transformers and booster transformer to the main masts of the gantries on which they are mounted.he price shall cover all fastenings required for fixing the copper strips along any structure member of the gantry. Total 52700.00 Item- 11 Supply & erection of Solid copper bus-bars 18mm. DYCEE-C-BRC-ELEC/WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Supply & Metre Erection of 18mm solid copper busbar as per latest RDSO/CORE specification or drawing.
The price shall cover cost for Supply & Metre Erection of 18mm solid copper busbar as per latest RDSO/CORE specification or drawing. Total 91890.00
Item Breakup - 19-Section-V: Insulator for Y connection Vishwamitri to Pratapnagar Project
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain stay Arm insulator (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines) Total 344880.00 Supply of Insulators for cantilever assembly of RE SOR items 4(a)(i) & 4(a)(iii)Bracket Porcelain (CD- Item- 2 1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain Bracket Porcelain insulator (CD- 1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 330880.00 Item- 3 Supply of 9-Tonne insulators for RE SOR items 4(b)(i) & 4(b)(iii):- Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9-Tonne insulators for items 4(b) (i) & 4(b)(iii): Stay Arm Porcelain (CD-1050 mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 34038.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD- Item- 4 1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). DYCEE-C-BRC-ELEC/WESTERN RLY Total 56730.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 5 1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 47900.00 Supply of 9-Tonne insulators for RE SOR items 8(b)(i), (ii), (iii), (vi), (vii),(vii)&(ix):- Composite (CD- Item- 6 1600 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 8(b) (i), (ii), (iii), (vi), (vii),(vii)&(ix):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 35200.00 Item- 7 Supply of 9-Tonne insulators for R SOR items 9(a), (b), (c), (d)& (e):- Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 9(a), (b), (c), (d)& (e):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 56725.00 Item- 8 Supply of 9-Tonne insulator for RE items 11(a)(i), &11 (a)(ii):-Porcelain (CD-1050 mm). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items 11(a) (i), &11 (a)(ii):- Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 102114.00 supply of 9-Tonne insulator for RE SOR items No. 12(a):- Porcelain 9-Tonne (CD-1050 mm) & Item- 9 Sectioning Insulator. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for items No. 12(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 28012.00 Item- 10 Supply of Sectioning Insulators for 12(c) and 12(cx). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Each complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item No. 12(c) and 12(cx) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 33332.00 Item- 11 Supply of Post & Operating rod insulators for item 13(a). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(a) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines). Total 115386.00 Item- 12 Supply of Post & Operating rod insulators for item 13(c). S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply of Set complete 25 KV solid core long creepage Porcelain 9 Tonne insulators for item 13(c) Porcelain (CD-1050mm) as per latest RDSO/CORE specification TI/SPC/OHE/INS/0071 or latest. The price shall cover for 100% testing (joint testing) of insulators shall be done before providing to the line. (As per the latest guidelines) Total 76924.00
Item Breakup - 20-Section-VII: Other than SOR Item for Y connection Vishwamitri to Pratapnagar Project.
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall cover supply & Erection of Each Antibird disc on ST, BT & 9 ton insulators end fittings as per RDSO Drg No. TI/DRG/OHE/ABD/RDSO/00000/19/0 Rev.-I (Sh-1 & 2) or latest, under RDSO MI No. TI/MI/00059 Rev 3 or latest. The disk shall be made up of polycarbonate of fire- flammability rating of V-2 or higher as per UL94, from Group 01, class 2 of latest from Group 01, Class 2 of ASTM D 3935-2, with additional properties as given in SMI. Material shall be procured from RDSO/CORE Approved vendor. Total 109760.00 Supply of Nylon/plastic Net- High density polyethelene (HDPE) monofilament netting type-III, UV Item- 2 stabilized s per IS 16008(Part-2)-2016/PVC Virgin HDPE Net Preferably in black colour. S No. Item Description of Item Unit Qty Rate Amount No
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI.
The price shall Supply include erection of Sqm Anti Bird high density polyethelene (HDPE)monofilament netting type III, UV stabilized as per IS 16008 (Part-2)-2016. PVC virgin HDPE net preferably in black colour on fabricated structure, Portals/TTC, Fabricated DA, Gantry boom, etc. as perRDSO MI No. TI/MI/0050 Rev- IDtd.27.09.2021. The price shall include tying with UV resistant as per para 4.4 of RDSO/SMI. Total 39300.00 Item- 3 Supply of 10 KVA Change over panel as per RDSO spec. suitable for 10 KVA AT supply. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for supply & Each Erection of 10KVA Change over panel as per RDSO specification No. ETI/SPC/PSI/CLS/0020 or latest and suitable for 10 KVA AT Supply. The price also covers cost of Type one junction box and its drawing required to approval of Dy.CEE/CN. The price also cover cost of MCB, any relay, fittings, Glands, fasteners, Lugs etc. for commissioning of panel and smooth working. DYCEE-C-BRC-ELEC/WESTERN RLY
The price shall be covered cost for drilling Each horizontal/ vertical holes of up to 50 mm dia. in the existing stone masonry of RCC slab/CC/ Stone / Brick etc. work in piar cap of bridge pair to a depth varying from 500to 1100 mm under line block as shown in the approved drawing using pneumatic driller, compressor etc using pneumatic driller, compressor etc. and cleaning the holes using compressor for pressure grouting and removing the rock/ soil/concrete fallen due to cavity formation and disposal of surplus spoils at locations and also as directed by the engineer -in charge with all lead and lift. The price shall be covered cost for all required labour and materials arranged by the contractor. The price shall be also covered cost for electricity & lighting arrangements. Total 71516.00 Item- 4 Providing (Supply & erection) of SWR/Sectioning diagram board at stations. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost for providing Each (Supply with Erection) of Sectioning/TWR diagram at Stations or TPC Room. The board shall be framed on 6mm Acroleic Sheet. The price shall also cover the cost of designing for Board. The board should be high resolution printing on Vinyle and to be pasted on acrylic sheet with lamination. The price shall also cover for erection /fixing on site with SS stud. Before supply the board necessary approval should be taken from Concern Dy. CEE. Total 42072.00 Item- 5 Digging of Trench size 450x1000 mm. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover erection of digging of Metre Cable trench 450mm wide and 900mmdepth for laying of different size cable. The price shall also cover for preparation of a detail plan for laying of cable & get approval of Dy.CEE/C before start the work. Total 39000.00 Item- 6 Supply & laying of sand and 2nd class bricks in trenches. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover Supply and layings of Metre bricks and sand in cable trench for protection of cable. A detail plan for laying of cable and showing method of laying of cable with bricks and sand shall be prepared and get approval of Dy.CEE/C before start the work. Total 76500.00 Item- 7 Tree Trimming / cutting S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover the cost of all type of Each tree cutting/trimming in section required for charging of OHE. The price shall cover in this schedule which all tree comes within6mtrs from OHE. The price shall cover the cost of tree cutting from bottom. DYCEE-C-BRC-ELEC/WESTERN RLY Total 2505.00 Item- 8 Supply & Erection of Standarad Wooden Isolator Key Box with glass for SSP & Station. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover cost for Providing Each (supply with erection) of Standard Wooden Isolator Key Box with glass for SSP &Station. Isolator key box should be made of wooden material with glass in front side. Before supply of this material, Size and item specification shall be got approval from DY.CEE/C. The price shall also cover cost for fixing arrangement on wall. The price shall cover cost of require fasteners for fixing. Total 1124.00 Drilling of horizontal bore below track by pushing method for laying of HDDE pipe of various size Item- 9 upto 450 mm dia. S No. Item Description of Item Unit Qty Rate Amount No
This item covers drilling of horizontal bore Metre by pushing method or any suitable means in all types of soil 1.5 meter below ground level or 2.1 meter below track level for laying of HDDE pipes 150 mm to 450 mm dia by pushing method in presence of Railway representative taking necessary safety precautions of track and movement of trains. Total 264700.00 Providing utility van for tower wagon crew, shifting of man and material for the work, supervision of Item- 10 work and other misc work. S No. Item Description of Item Unit Qty Rate Amount No
The price shall cover providing utility van Month for tower wagon crew, shifting of man and Material for the work, supervision of work and other misc. work. The cost shall cover for Fuelling of Diesel/Petrol in utility van, Maintenance Charges, Toll Taxes etc. The price shall also cover for night working and outstation work. Total 336798.00 Erection of Additional contact wire piece across RRA clamp with supply & erection of 02 nos. of PG Item- 11 Clamps on either side (contact wire piece shall be supplied by Railway). S No. Item Description of Item Unit Qty Rate Amount No
The price shall include Supply and fitting of Each 02 Nos. PG clamps on either side of RRA clamp as per RDSO SMI No. TI/MI/00058 Rev-I, dtd 10.08.2021. The additional contact wire of Nos. PG clamps on either side (RI No. 1041-2) as per SMI. The work involves bending and fixing of contact wire as per site requirement. Contract wire will be supplied by Railway. Total 32400.00 Transportation of Railway supply materials/Released material from Railway depots/work site to Item- 12 Work site/Scrap depot. S No. Item Description of Item Unit Qty Rate Amount No DYCEE-C-BRC-ELEC/WESTERN RLY
The Price shall cover cost for Loading, MT unloading and transportation of all released OHE materials i.e. OHE mast, cantilevers, SI, SP Isolator, Guy rod, insulators, DA, Chair etc. from site to Construction depot. /Scrap depot for DS-8 or as desired by SSE/TRD/C. The price also covers cost for transportation of materials (from OHE depot to Site) which is supplied by Railway and not covered in contractor's supply. The item of transportation of Contact wire, catenary wire, feeder wire and different type of cable shall not be cover under this item. Total 104000.00 "Supply & Erection of fittings for provision of false catenary ( Catenary ending cone , double strap, Item- 13 contact ending clamp) as per latest Railway HQ/RDSO guideline of false catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 7030.00 "Erection of fittings for provision of false catenary as per latest Railway HQ/RDSO guideline of false Item- 14 catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 1405.00 "Provision of jumpering arrangement (160 sq.mm copper jumper wire) with PG clamp and related Item- 15 fittings for false catenary as per latest Railway HQ/RDSO guideline of false catenary. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 8535.00 Provision of Large-size modified double bolted PG clamps at all G-jumper connections to ensure Item- 16 better electrical continuity and mechanical strength. S No. Item Description of Item Unit Qty Rate Amount No
See the Tender document. Total 102660.00 Work under Power Block: Any erection work as per schedule done under power and /or Traffic block Item- 17 is subject to have extra rate. S No. Item Description of Item Unit Qty Rate Amount No
The price covers 30% payment done of Lumpsum erection cost of an item under this schedule item which is required Erection under a power block. The price under this item covers extra charges over and above erection rates of items for erection of equipment in the vicinity (less than 2 mtrs) of energized overhead equipment which calls for a power block (shut off of traction power supply). Power block will be arranged by Railway as per suitable demand of contractor. The price payable under this item shall be 30% extra over the erection rates of the items referred to above provide such work is not called for on account of non-compliance with specifications, approved drawings and instructions given by the purchaser from time to time. Total 168688.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
TenderdocumentsTR-C-04-2025-26.pdf
ATTACHMENT
annexurevib.pdf
ATTACHMENT
correctionupto11_compressed.pdf
ATTACHMENT
AnnexureSOR.pdf
ATTACHMENT
Download all tender documents and submit your bid