Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹16.8 L
Closing Date
17 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Name of the Work :- Replacement of less implanted/ leaning OHE mast by new mast.
TRD-ADA-e-Tender-08-2026~SER
TRD-ADA-e-Tender-08-2026
Open
Works - General
12 Months
Purulia, West Bengal
₹0
₹16.8 L
17 Jul 2026
26 Jun 2026
3 Jul 2026
75 items across 2 schedules · ₹8,41,05,500.73 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Supply of rolled or fabricated and galvanized traction masts, auxiliary transformer masts, Feeder mast. | MT | 100.11 | 96,606.16 | 96,71,242.68 | |
| 2 | Supply of TTC Structures and Portals with boom. | MT | 226.64 | 96,606.16 | 2,18,94,820.1 |
| 3 | Supply of fabricated and galvanized steel work other than traction mast (SPS) | MT | 67.00 | 1,14,760.35 | 76,88,943.45 |
| 4 | Supply of single cantilever assembly complete with insulator for conventional OHE | Each | 475.00 | 33,533.59 | 1,59,28,455.25 |
| 5 | Supply of guy rod assembly | Each | 70.00 | 10,653.37 | 7,45,735.9 |
| 6 | Supply of regulating equipment, 3 (three) pully type, with all accessories including counter weight assembly, SS wire rope for conventional OHE. | Each | 15.00 | 94,666.47 | 14,19,997.05 |
| 7 | Supply of materials for termination of double conductor (including supply of cut-in insulator) of overhead equipment. | Each | 35.00 | 11,129.04 | 3,89,516.4 |
| 8 | Supply of materials for termination of a single conductor (including supply of cut-in insulator) of OHE or a terminating wire. | Each | 35.00 | 8,569.4 | 2,99,929 |
| 9 | Supply of OHE excluding catenary, contact, jumper, dropper wire and large span wire which will supplied by Railway. | Per Track KM | 5.00 | 71,196 | 3,55,980 |
| 10 | Supply for additional, fittings at a turnout/crossings/overlaps. | Each | 40.00 | 4,360.82 | 1,74,432.8 |
| 11 | Supply of anti-creep with Railway supply catenary wire . | Each | 6.00 | 12,062.99 | 72,377.94 |
| 12 | Supply of 25KV single pole isolator without earth contact assembly. | Each | 1.00 | 63,012.77 | 63,012.77 |
| 13 | Supply of structure bonds (other than platform) | Each | 500.00 | 741.05 | 3,70,525 |
| 14 | Supply of Retro reflective Structure Number plate | Each | 500.00 | 486.74 | 2,43,370 |
| 15 | Supply of 25 kV Support/post Insulator. | Each | 12.00 | 6,346.3 | 76,155.6 |
| 16 | Supply of 25 kV suspension 9 ton Insulator with suspension arrangement. | Each | 10.00 | 5,629.44 | 56,294.4 |
| 17 | Supply of 25 KV solid core cut-in-insulator assembly ( Porcelain). | Each | 10.00 | 11,417.13 | 1,14,171.3 |
| 18 | Supply of Contact wire parallel clamp groove PG 1030-3 with GI bolt 16x50x38mm with nut spring washer, as per RDSO drawing No. ETI/OHE/P/1030-3, Rev-A, RI No.1031-3. | Each | 3600.00 | 247.8 | 8,92,080 |
| 19 | Supply of Contact wire parallel clamp (Small) part No.- 1041-2 with fasteners as per RDSO Drg. No.- ETI/OHE/P/1040-2 Mod-E or latest. | Each | 500.00 | 168.74 | 84,370 |
| 20 | Supply of Parallel Clamp for 160 SQ MM (jumper)/107 SQ MM contact wire or catenary 65 SQ MM. RI No 1051-3. | Set | 100.00 | 755.2 | 75,520 |
| 21 | Supply of packing saddle part no. RI no. 1174 as per RDSO drawing no. RE/33/P/1174 Rev-B or latest | Each | 5000.00 | 20.3 | 1,01,500 |
| 22 | Supply of GI NUT AND BOLT OF SIZE 16X50X38MM | Each | 3000.00 | 25.37 | 76,110 |
| Schedule total | ₹6,07,94,539.64 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .