Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 CrAccepted-AOC | ₹17.5 Cr | L1 | Accepted-AOC L1 Bidder Agreement executed |
| Sl No | Description | Qty | Unit | K J Varghese L1 |
|---|---|---|---|---|
| 1.0012.25 MLD WTP - Clearing and Levelling the site | ||||
| 1.00 | OD248226/2023-2024:12.25 MLD WTP - Clearing and Levelling the site - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 13,10,442 ₹13,10,442 Lowest |
| 2.00Construction of 12.25 Mld WTP at Methipara -Aerator | ||||
| 2.00 | OD248206/2023-2024:Construction of 12.25 Mld WTP at Methipara -Aerator - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 8,65,616 ₹8,65,616 Lowest |
| 3.0012.25 MLD WTP - Raw Water Channel | ||||
| 3.00 | OD248232/2023-2024:12.25 MLD WTP - Raw Water Channel - - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 8,02,985 ₹8,02,985 Lowest |
| 4.0012.25 MLD WTP - Flash mixer | ||||
| 4.00 | OD248220/2023-2024:12.25 MLD WTP - Flash mixer - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 7,99,920 ₹7,99,920 Lowest |
| 5.0012.25 MLD WTP - Clariflocculator | ||||
| 5.00 | OD248227/2023-2024:12.25 MLD WTP - Clariflocculator- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 1,22,90,561 ₹1,22,90,561 Lowest |
Tender Value
₹14.6 Cr
EMD Value
₹5 L
Closing Date
11 Mar 2024, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, Kerala Water Authority, P.H Circle, Kochi-11
Jal Jeevan Mission JJM WSS to Ramamangalam Marady and Pambakuda part Panchayaths in Ernakulam District Providing FHTC to all houses Package 1 Part A Production Components WTP At Methipara LS estimate General Civil Work
2024_KWA_657545_1
Re- E-Tender No 283/2023-24/SE/PHC/CHN
Open Tender
Civil Works - Water Works
Item Rate
365 days
Ramamangalam Panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹19,518
₹5 L
Kerala Water Authority, P.H Circle, Kochi-11
2 Jul 2026
12 Feb 2024
12 Mar 2024
12 Feb 2024
11 Mar 2024
12 Feb 2024
12 Feb 2024 - 15 Feb 2024
15 Feb 2024
Amount
12.25 MLD WTP - Clearing and Levelling the site
OD248226/2023-2024:12.25 MLD WTP - Clearing and Levelling the site - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
Construction of 12.25 Mld WTP at Methipara -Aerator
OD248206/2023-2024:Construction of 12.25 Mld WTP at Methipara -Aerator - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Raw Water Channel
OD248232/2023-2024:12.25 MLD WTP - Raw Water Channel - - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Flash mixer
OD248220/2023-2024:12.25 MLD WTP - Flash mixer - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clariflocculator
OD248227/2023-2024:12.25 MLD WTP - Clariflocculator- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chemical House
OD248218/2023-2024:12.25 MLD WTP - Chemical House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Alum and Lime solution Tank and Building
OD248223/2023-2024:12.25 MLD WTP - Alum and Lime solution Tank and Building- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Filter House
OD248221/2023-2024:12.25 MLD WTP - Filter House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Filter Box
OD248234/2023-2024:12.25 MLD WTP - Filter Box- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water Chanel
OD248208/2023-2024:12.25 MLD WTP - Clear water Channel- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water Sump
OD248229/2023-2024:12.25 MLD WTP - Clear water Sump- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water pump House
OD248210/2023-2024:12.25 MLD WTP - Clear water pump House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Lab Room
OD248224/2023-2024:12.25 MLD WTP - Lab Room- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Officers room & Operators room
OD248216/2023-2024:12.25 MLD WTP - Officers room & Operators room- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Back wash water Tank
OD248228/2023-2024:12.25 MLD WTP - Back wash water Tank- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chlorine room
OD248209/2023-2024:12.25 MLD WTP - Chlorine room - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Lobby & stair
OD248231/2023-2024:12.25 MLD WTP - Lobby & stair - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Tank connection works & Anchor block , valve chamber ,cost of pipes
OD248207/2023-2024:12.25 MLD WTP - Tank connection works & Anchor block , valve chamber ,cost of pipes - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Other Miscellaneous items including Watch & Ward arrangements,Yard lighting,O&M Guarentee etc
OD248225/2023-2024:12.25 MLD WTP - Other Miscellaneous items including Watch & Ward arrangements,Yard lighting,O&M Guarentee etc - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chamber (Estimate on construction of Wash Water Re cyclic Unit & scour line arrangement for the sludge disposal)
OD248230/2023-2024:12.25 MLD WTP - - Chamber (Estimate on construction of Wash Water Re cyclic Unit & scour line arrangement for the sludge disposal) - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Sludge valve chamber
OD248219/2023-2024:12.25 MLD WTP -Sludge valve chamber - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Estimation of laying 300 mm DI K9 for interconnection works between chambers and raw water Chanel
OD248235/2023-2024:12.25 MLD WTP - Estimation of laying 300 mm DI K9 for interconnection works between chambers and raw water Chanel - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Cost of pipe and specials
OD248205/2023-2024:12.25 MLD WTP - Cost of pipe and specials - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Mechanical items
OD248217/2023-2024:12.25 MLD WTP - Mechanical items- 15% of Civil Work
12.25 MLD WTP - Electrical items
OD248222/2023-2024:12.25 MLD WTP - Electrical items- 10% of Civil Work
Construction of Retaining wall and Compound wall at WTP site Methipara
OD248233/2023-2024:Construction of Retaining wall and Compound wall at WTP site Methipara - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
Supply & Installation of pumpsets
OD256325/2023-2024:Supply and installation of pump sets
Bidder Name
K J Varghese
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.07 MB
T283NITRamamngalam.pdf
Tender Documents • 1.96 MB
AdditionalPG.pdf
Other Document • 1.54 MB
BOQ_1016124.xls
BOQ • 0.33 MB
Lowquotedorder.pdf
Other Document • 2.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].