| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 CrAdmitted-Finance | ₹17.5 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K J Varghese L1 |
|---|---|---|---|---|
| 1.0012.25 MLD WTP - Clearing and Levelling the site | ||||
| 1.00 | OD248226/2023-2024:12.25 MLD WTP - Clearing and Levelling the site - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 13,10,442 ₹13.1 L |
| 2.00Construction of 12.25 Mld WTP at Methipara -Aerator | ||||
| 2.00 | OD248206/2023-2024:Construction of 12.25 Mld WTP at Methipara -Aerator - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 8,65,616 ₹8.7 L |
| 3.0012.25 MLD WTP - Raw Water Channel | ||||
| 3.00 | OD248232/2023-2024:12.25 MLD WTP - Raw Water Channel - - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 8,02,985 ₹8.0 L |
| 4.0012.25 MLD WTP - Flash mixer | ||||
| 4.00 | OD248220/2023-2024:12.25 MLD WTP - Flash mixer - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 7,99,920 ₹8.0 L |
| 5.0012.25 MLD WTP - Clariflocculator | ||||
| 5.00 | OD248227/2023-2024:12.25 MLD WTP - Clariflocculator- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1 | 1 | job | 1,22,90,561 ₹1.2 Cr |
Tender Value
₹14.6 Cr
EMD Value
₹5 L
Closing Date
11 Mar 2024, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, Kerala Water Authority, P.H Circle, Kochi-11
Jal Jeevan Mission JJM WSS to Ramamangalam Marady and Pambakuda part Panchayaths in Ernakulam District Providing FHTC to all houses Package 1 Part A Production Components WTP At Methipara LS estimate General Civil Work
2024_KWA_657545_1
Re- E-Tender No 283/2023-24/SE/PHC/CHN
Open Tender
Civil Works - Water Works
365 days
Ramamangalam Panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹19,518
₹5 L
Kerala Water Authority, P.H Circle, Kochi-11
9 Apr 2024
12 Feb 2024
12 Mar 2024
12 Feb 2024
11 Mar 2024
12 Feb 2024
12 Feb 2024 - 15 Feb 2024
15 Feb 2024
Amount
12.25 MLD WTP - Clearing and Levelling the site
OD248226/2023-2024:12.25 MLD WTP - Clearing and Levelling the site - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
Construction of 12.25 Mld WTP at Methipara -Aerator
OD248206/2023-2024:Construction of 12.25 Mld WTP at Methipara -Aerator - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Raw Water Channel
OD248232/2023-2024:12.25 MLD WTP - Raw Water Channel - - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Flash mixer
OD248220/2023-2024:12.25 MLD WTP - Flash mixer - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clariflocculator
OD248227/2023-2024:12.25 MLD WTP - Clariflocculator- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chemical House
OD248218/2023-2024:12.25 MLD WTP - Chemical House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Alum and Lime solution Tank and Building
OD248223/2023-2024:12.25 MLD WTP - Alum and Lime solution Tank and Building- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Filter House
OD248221/2023-2024:12.25 MLD WTP - Filter House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Filter Box
OD248234/2023-2024:12.25 MLD WTP - Filter Box- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water Chanel
OD248208/2023-2024:12.25 MLD WTP - Clear water Channel- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water Sump
OD248229/2023-2024:12.25 MLD WTP - Clear water Sump- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Clear water pump House
OD248210/2023-2024:12.25 MLD WTP - Clear water pump House- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Lab Room
OD248224/2023-2024:12.25 MLD WTP - Lab Room- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Officers room & Operators room
OD248216/2023-2024:12.25 MLD WTP - Officers room & Operators room- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Back wash water Tank
OD248228/2023-2024:12.25 MLD WTP - Back wash water Tank- as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chlorine room
OD248209/2023-2024:12.25 MLD WTP - Chlorine room - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Lobby & stair
OD248231/2023-2024:12.25 MLD WTP - Lobby & stair - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Tank connection works & Anchor block , valve chamber ,cost of pipes
OD248207/2023-2024:12.25 MLD WTP - Tank connection works & Anchor block , valve chamber ,cost of pipes - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Other Miscellaneous items including Watch & Ward arrangements,Yard lighting,O&M Guarentee etc
OD248225/2023-2024:12.25 MLD WTP - Other Miscellaneous items including Watch & Ward arrangements,Yard lighting,O&M Guarentee etc - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Chamber (Estimate on construction of Wash Water Re cyclic Unit & scour line arrangement for the sludge disposal)
OD248230/2023-2024:12.25 MLD WTP - - Chamber (Estimate on construction of Wash Water Re cyclic Unit & scour line arrangement for the sludge disposal) - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Sludge valve chamber
OD248219/2023-2024:12.25 MLD WTP -Sludge valve chamber - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Estimation of laying 300 mm DI K9 for interconnection works between chambers and raw water Chanel
OD248235/2023-2024:12.25 MLD WTP - Estimation of laying 300 mm DI K9 for interconnection works between chambers and raw water Chanel - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Cost of pipe and specials
OD248205/2023-2024:12.25 MLD WTP - Cost of pipe and specials - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
12.25 MLD WTP - Mechanical items
OD248217/2023-2024:12.25 MLD WTP - Mechanical items- 15% of Civil Work
12.25 MLD WTP - Electrical items
OD248222/2023-2024:12.25 MLD WTP - Electrical items- 10% of Civil Work
Construction of Retaining wall and Compound wall at WTP site Methipara
OD248233/2023-2024:Construction of Retaining wall and Compound wall at WTP site Methipara - as per TS obtained estimate no. WRD/KWA-CE(CR)/EST/13210/2022_5_1_1
Supply & Installation of pumpsets
OD256325/2023-2024:Supply and installation of pump sets
Bidder Name
K J Varghese
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.07 MB
T283NITRamamngalam.pdf
Tender Documents • 1.96 MB
AdditionalPG.pdf
Other Document • 1.54 MB
BOQ_1016124.xls
BOQ • 0.33 MB
Lowquotedorder.pdf
Other Document • 2.51 MB