| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-AOC WATHORA CHADOORA BUDGAM KASHMIR J K 191113 | CHADOORA | BUDGAM | JAMMU AND KASHMIR | 191113 | ₹8.4 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 Cr+₹17.8 L (2.49%)Rejected-Finance REDDI CHOWKIBAL KUPWARA KUPWARA | KUPWARA | JAMMU AND KASHMIR | 193221 | ₹7.3 Cr+₹17.8 L (2.49%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.0 Cr+₹81.3 L (11.4%)Rejected-Finance R O TIKKERPORA QASBA KALAROOS DISTRICT KUPWARA | KUPWARA | JAMMU AND KASHMIR | 193221 | ₹8.0 Cr+₹81.3 L (11.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹8.2 Cr+₹1.1 Cr (14.8%)Rejected-Finance | ₹8.2 Cr+₹1.1 Cr (14.8%) | L4 | Rejected-Finance L4 |
Tender Value
₹11.4 Cr
EMD Value
₹22.8 L
Closing Date
10 Jun 2026, 4:30 pmClosed
Chief Engineer PMGSY Kashmir
Engineering Complex Bund Road near Govt. Silk factory Showroom Rajbagh Srinagar-190008
Construction and maintenance of road from L029-Hillan to Skian via Hakpathri, Length 4.700KM, Stage Complete, Carriageway width 3.75Mtrs, PMGSY-IV (Batch-I, 2026-27) (Waste Plastic Technology), P.No. JK03-4504, PMGSY Division Uri.
2026_KSRRD_147694_1
JK034504
Open Tender
CIVIL
Percentage
548 days
Uri
Please refer Tender documents.
21 documents required · 21 mandatory
₹20,000
₹22.8 L
Office of Chief Engineer PMGSY Kashmir
17 Jul 2026
18 May 2026
11 Jun 2026
19 May 2026
10 Jun 2026
26 May 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work | - | - | - | - |
| 2 | Excavation in soil in Hilly Area by mechnical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 | 16,486.4 | Cum | 165.81 | ₹27,33,609.98 |
| 3 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. | 4,710.4 | Cum | 290.35 | ₹13,67,664.64 |
| 4 | Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. | 2,355.2 | Cum | - | - |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1,765 | Cum | 1 | ₹1,764.82 |
| 6 | Unlined Surface Drain | - | - | - | - |
| 7 | Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 | 3,200 | Rm | 27.28 | ₹87,296 |
| 8 | Pavement | - | - | - | - |
| 9 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.1 | 5,076 | Cum | - | - |
| 10 | Construction of Granular Sub-Base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 6,290.7 | cum | 1 | ₹6,290.07 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
SBD_JK03-4504.pdf
Tender Documents • 1.98 MB
BOQ_230521.xls
BOQ • 0.36 MB
ExtensionNIT1.pdf
PDF • 0.11 MB
Corrigendum.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .