Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹1.6 Cr Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | ₹1.6 Cr | L1 |
| 2 | L2₹1.7 Cr+₹2.7 L (1.64%) Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | ₹1.7 Cr+₹2.7 L (1.64%) | L2 |
| 3 | L3₹1.7 Cr+₹8.2 L (5.02%) Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | ₹1.7 Cr+₹8.2 L (5.02%) | L3 |
| 4 | L4₹1.8 Cr+₹12.4 L (7.58%) Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | ₹1.8 Cr+₹12.4 L (7.58%) | L4 |
| 5 | L5₹1.8 Cr+₹21.0 L (12.8%) Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work | ₹1.8 Cr+₹21.0 L (12.8%) | L5 |
| Sl No | Description | Qty | Unit | ARP ENTERPRISES L7 | J K ELECTRIC ENGINEERING WORKS L3 | KPC PROJECTS LIMITED L10 | M/S LAKSHMI CONSTRUCTIONS L5 | LEO ENTERPRISES L4 | NATIONAL CONSTRUCTION L8 | M/s SKS PROJECTS L9 | Surindra Electricals L6 | P RAGHURAM L11 | unique associates L1 | BANDARU SRINIVAS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | ECPT | - | - | -22.2 ₹1,93,21,480.62 | -30.7 ₹1,72,10,521.94 | -14.93 ₹2,11,26,971.17 | -25.56 ₹1,84,87,031.08 | -29.01 ₹1,76,30,230.2 | -21.33 ₹1,95,37,543.45 | -18.09 ₹2,03,42,191.23 | -23.27 ₹1,90,55,357.28 | -12.49 ₹2,17,32,940.48 | -34.01 ₹1,63,88,489.8 Lowest | -32.93 ₹1,66,56,705.73 |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
8 Jul 2024, 3:00 pmClosed
EE&SM(E )-1
SRINIVASA SANKARA RAVI KUMAR PINGALI
CPWD
Construction of permanent campus of IIPE viasakhapatnam at Sabbavaram Anakapalle dist. Sub head: Street Lighting Work
79696
02/EE&SM(E)/VSKP/2024-25
OPEN
Street Lighting
NCB
180 days
Anakapalli, Andhra Pradesh
8 documents required · 8 mandatory
₹5.0 L
Office of EE SM (E), BSNL Telephone Exchange Building, 1st Floor, CPWD, Visakhapatnam 530007
8 Jul 2024
26 Jun 2024
8 Jul 2024
8 Jul 2024
1 Jul 2024
1 Jul 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.20 MB
NIT.pdf
document • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .