| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance NO 1 DIGHIRPAR P O WEST DIGHIRPAR P S CANNING DIST SOUTH 24 PGS | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | ₹5.7 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹5.8 LRejected-Finance 23B BIDHANNAGAR ROAD KOLKATA 700067 | KOLKATA | WEST BENGAL | 700067 | ₹5.8 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹6.6 LRejected-Finance ASANSOL | ASANSOL | ₹6.6 L | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹7.2 L
EMD Value
₹14,355
Closing Date
18 May 2026, 11:30 amClosed
EE MDD-II
Office of the Executive Engineer Metropolitan Drainage Division No.-II Jalasampad Bhavan(7th Floor), Bidhannagar, Kolkata- 700 091
M/R to Existing C.C. road along Right bank of Intercepting Channel in between Siemens bridge to Naskarhat bridge at Naskarhat within Ward No. 107 of KMC area, P.S. - Kasba, Dist - Kolkata
2026_IWD_1023945_2
WBIW/EE/MDD-II/e-NIT-1/2026-27
Open Tender
CIVIL WORKS
45 days
Naskarhat
Please refer Tender documents.
6 documents required · 6 mandatory
₹14,355
Yes
2 Jun 2026
12 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.
Upto 3 m depth
Without pumping out water and shoring | 1 | Cum | 135.87 | ₹135.73 | 1 |
| 2 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Pakur Variety | - | Cum | 6,279.02 | - | 2 |
| 3 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials.
In 1:4 proportion | - | Cum | 6,606.1 | - | 3 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
By Mechanical Means.
Cement Concrete. | 1 | Cum | 560.15 | ₹559.59 | 4 |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 0.2 | Cum | 197.84 | ₹39.57 | 5 |
| 6 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | 0.12 | Cum | 1,643.52 | ₹197.06 | 6 |
| 7 | Supplying and laying brick Khoa of ordinary bats of size (38 mmx 63 mm)of approved quality in 100 mm layer (loose) filling in gaps with small ones rammed and compact as directed true to level and grade. | 0.8 | Sqm | 189.5 | ₹151.41 | 7 |
| 8 | Supplying to site empty cement polythene bags (capacity 50 kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Polythene bag. | - | Each | 7.15 | - | 8 |
| 9 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 Cum/bag. | - | Each Bag | 8.34 | - | - |
| 10 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | - | Each Bag | 3.58 | - | 9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BARCHART_2.pdf
Tender Documents • 0.05 MB
WB_2911.pdf
Tender Documents • 1.86 MB
BOQ_2516565.xls
BOQ • 0.38 MB