Loading…
Loading…
Tender Value
₹54.3 L
EMD Value
₹1.1 L
Closing Date
30 Jul 2026, 3:00 pmClosed
PM BRIDCUL
BRIDCUL Opp Govt ITI Niranjanpur Majra Dehradun
Renovation of Existing Hostel at Sridev Suman University at Railway Road Rishikesh Dehradun Uttarakhand
2026_BRID3_97758_1
651/BRIDCUL/233/26 Dated 10.07.2026
Open Tender
Civil Works - Buildings
Item Rate
270 days
Rishikesh
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Project Manager, Project Unit Dehradun, BRIDCUL
₹1.1 L
BRIDCUL Dehradun
30 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
30 Jul 2026
24 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING WORK | - | - | - | - |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,823.01 | Sqm | - | - |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead | 23 | Nos | - | - |
| 4 | REINFORCED CEMENT CONCRETE WORK | - | - | - | - |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified mininum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works above plinth level upto floor V level | - | - | - | - |
| 6 | Concrete of M25 grade with minimum cement content of 330 kg /cum | 0.53 | Cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars | 83.68 | Kg | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : | - | - | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 11.65 | sqm | - | - |
| 10 | WOOD WORK | - | - | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SBD_RISHIKESH.pdf
Tender Documents • 9.98 MB
BOQ_115414.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .