Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC KARINGAPPARA HOUSE KUPPAKKAYAM P O KOMBUKUTHI MUNDAKKAYAM | KERALA | ₹10.3 L | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L2₹10.7 LRejected-AOC POTTENMALACKAL PALACKATHAKIDI P O KUNNAMTHANAM | ₹10.7 L | L2 | Rejected-AOC rejected since the lowest quoted bidder accepted work order |
Updated dates
Tender Value
₹11.7 L
EMD Value
₹29,200
Closing Date
3 Mar 2026, 4:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Electrical Sub Division, Kanjirappally
Re-conductoring of LT line under Punchavayal Factory padi Transformer under Ele. Section Mundakkayam
2026_KSEB_834399_1
TENDER/2025-26/5252/18 dt. 07-02-2026
Open Tender
Electrical Works
60 days
under Electrical Section Mundakkaym
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
₹29,200
11 May 2026
9 Feb 2026
5 Mar 2026
9 Feb 2026
3 Mar 2026
9 Feb 2026
Reconductoring LT line with ABC
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading
Transporting one LT PSC pole by Head load for an average distance of one km (limited to 0.3km).
Erecting one LT PSC Pole in position incl. digging & back filling pit.
Providing Strut using LT PSC pole incl. digging & back filling pit.
Providing Stay for LT poles incl. digging & back filling pit.
Renewal of existing damaged/broken old LT stay with existing stay rod.
Straightening one Slanted LT pole after unbinding the line and rebinding the line after work.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion
Dismantling one section fuse
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane
Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
Stringing one km LT 1ph 2 wire line XLPE Insulated ACSR Rabbit or equivalent, incl. fitting cross arm etc. removing touchings and conveyance of materials.
Erection of Anchor clamp / dead end clamp for LT ABC of any size
Erection of suspension clamp for LT ABC of any size
Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm
Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm
Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size
Providing End Caps
Providing one Driven Earth using Steel earth rod at standard distance away from the pole/structure in loose soil.
Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.
Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite.
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.
Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1403773.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 0.92 MB
BOQ_1403773.xls
BOQ • 0.36 MB
conditionseng.pdf
Tender Documents • 0.43 MB
conditionsmal.pdf
Tender Documents • 0.82 MB
tenderform.pdf
Tender Documents • 0.41 MB
declaration.pdf
Tender Documents • 0.38 MB
proforma.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid