Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC AT GROUND FLOOR BEHRAMAL JHARSUGUDA ODISHA | JHARSUGUDA | ODISHA | 768201 | L1 | Accepted-AOC TECHNO COMMERCIALLY ACCEPTED BID | |
| 2 | L2₹1.1 L+₹9,496.20 (9.28%)Rejected-Finance | L2 | Rejected-Finance AS PER TC RECOMMENDATION | |
| 3 | L3₹1.3 L+₹22,865.56 (22.3%)Rejected-Finance COAL INDIA LIMITED CIL | KODERMA | JHARKHAND | 825318 | L3 | Rejected-Finance AS PER TC RECOMMENDATION | |
| 4 | L4₹1.4 L+₹36,595.70 (35.7%)Rejected-Finance | L4 | Rejected-Finance AS PER TC RECOMMENDATION |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
16 Apr 2024, 5:00 pmClosed
SO E AND M
OFFICE OF SO E AND M BASUNDHARA AREA MCL
Fabrication of transformer stands at township Basundhara Area
2024_MCL_306287_1
MCL/GM/ BA/EM/e-Proc/2024-25/01 Date- 04/04/2024
Open Tender
Miscellaneous Works
Item Rate
20 days
BASUNDHARA AREA
as per NIT AND TC
3 documents required · 3 mandatory
₹2,300
17 Jun 2024
5 Apr 2024
17 Apr 2024
5 Apr 2024
16 Apr 2024
6 Apr 2024
5 Apr 2024 - 9 Apr 2024
Amount
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer (for 02 nos. of transfomrer stand)
Painting with synthetic enamal paint of approved brand and manufacture to give an even shade: two or more coats on new work (for 02 nos. of transfomrer stand)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
ORISSA ENGINEERING WORKS
NAGESWAR SAHU
SUBHASHIS COSNTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .