Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹7.3 LAccepted-AOC | ₹7.3 L | 1st | Accepted-AOC Agt.Executed.EMD may be released |
| 2 | Rejected-Technical PARAVAN VILA VEEDU MELAMMAKAM MARIYAPURAM | - | - | Rejected-Technical 3ED LOWEST |
| 3 | Rejected-Technical PULININNA KALLAMPOTTA BUNGLOW PARANIYAM ARUMANOOR POOVAR P O | - | - | Rejected-Technical 2ND LOWEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical 4TH LOWEST |
| Sl No | Description | Qty | Unit | RAVIDAS M L4 | AJEESH KUMAR AR L3 | PRAKASH N V L2 | MIDHUN M S L1 |
|---|---|---|---|---|---|---|---|
| 1.00construction of bridge | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 112.88 | cum | 229.11 ₹25,862.85 | 217.26 ₹24,525.18 | 216 ₹24,382.94 | 202.52 ₹22,861.27 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.05 | cum | 7,046.88 ₹42,619.53 | 6,690.07 ₹40,461.54 | 6,647.9 ₹40,206.5 | 6,235.96 ₹37,715.09 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 31.2 | sqm | 343.03 ₹10,702.54 | 325.66 ₹10,160.59 | 323.6 ₹10,096.32 | 303.56 ₹9,471.07 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 152.14 | sqm | 745.83 ₹1,13,470.58 | 708.06 ₹1,07,724.25 | 703.6 ₹1,07,045.7 | 660 ₹1,00,412.4 Lowest |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 13.34 | cum | 8,050.47 ₹1,07,425.47 | 7,642.85 ₹1,01,986.19 | 7,595 ₹1,01,347.68 | 7,124.06 ₹95,063.46 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.68 | cum | 8,204.42 ₹1,28,645.31 | 7,789.01 ₹1,22,131.68 | 7,740 ₹1,21,363.2 | 7,260.3 ₹1,13,841.5 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 25.96 | sqm | 677.68 ₹17,592.57 | 643.37 ₹16,701.89 | 639.3 ₹16,596.23 | 599.7 ₹15,568.21 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.78 | cum | 9,317.3 ₹1,09,720.52 | 8,845.53 ₹1,04,164.96 | 8,790 ₹1,03,511.04 | 8,245.11 ₹97,094.42 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,282.88 | kilogram | 99.87 ₹2,27,991.23 | 94.81 ₹2,16,439.85 | 94.2 ₹2,15,047.3 | 88.37 ₹2,01,738.11 Lowest |
Tender Value
₹9.5 L
EMD Value
₹23,710
Closing Date
30 Dec 2025, 4:00 pmClosed
The Assistant Executive Engineer
O/o The Assistant Executive Engineer NIP Channel Sub Division Neyyattinkara.
DEPOSIT-NIP-Parassala
2025_Irrig_823821_1
IRR/IA/EST/3011/2025_5_1_1
Open Tender
Civil Works - Canal
Item Rate
Neyyattinkara
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,095
Yes
₹23,710
Yes
17 Jun 2026
24 Dec 2025
1 Jan 2026
24 Dec 2025
30 Dec 2025
24 Dec 2025
construction of bridge
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1380945.xls
BOQ • 0.30 MB
bid3011.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .