| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹4.5 CrRejected-AOC | ₹4.5 Cr | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
18 Jul 2024, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Upgradation of 1 road in Manapparai Block in Tiruchirappalli District under PMGSY III Batch I 2023-24 including maintenance of 5 years Package No.TN22211.
2024_RDTN_133964_1
TN22211
Open Tender
Civil Works - Roads
270 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8.6 L
DRDA Tiruchirappalli
4 Sept 2024
16 May 2024
18 Jul 2024
16 May 2024
18 Jul 2024
16 May 2024
28 May 2024
Amount
Upgradation of T - 01 Malaiyadaipatty Road to Kalapalayathanpatty Road at Km. 0/0 - 7/060 Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle) 'Km : 0/0 7/060
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. 'Km : 0/000 - 7060
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 'Km.0/0 1/0
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder) 'Km. 0/0 1/00
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).KM 0/0 0/10
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.KM 0/0 - 1/0
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity Km 0/0 - 0/1
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared Bituminous Surface & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii). 'Km. 0/0 0/1
Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING]. 'Km. 0/0 - 1/0
Construction of Sub base & Base by way of using blended material comprising of 60% Available soil of CBR> 5; 40% GSB Material, Grade B; 3% Cement by weight of soil; 1kg of Terrasil or Equivalent per cum & 1kg of Zycobond or Equivalent per cum; Mechanically blended using a Rotavator at Optimum Moisture Content; laid in Two layers of Equivalent Depth each and duly compacted with Static Roller Including Maintaining the Camber as per specifications. Complete job, finished work to be measured. (ref: MORD sl.no4.11-(i) page no.4-20) KM 3/50 -4/0
Providing and applying Primer Coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification. KM 0/1 1/0
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared Bituminous Surface & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii). KM 0/1 - 1/0
Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be measured. KM 0/1 - 1/0
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 6030 Removal of Pipes
Removal of Body wall
Removal of RR Masonry RR masonry at : 2310
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1.5m Culvert @ Ch. 2310,
1.5mCulvert @ Ch. 6030,
1.5mCulvert @ Ch. 7010
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 5730 Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 1 Row Pipe Culvert @ Ch. 5730,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1 Row Pipe Culvert @ Ch. 5730,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1 Row Pipe Culvert @ Ch. 5730, ,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1 Row Pipe Culvert @ Ch. 5730,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 1 Row Pipe Culvert @ Ch. 5730,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1 Row Pipe Culvert @ Ch. 5730,
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets 1 Row Pipe Culvert @ Ch. 5730,
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB). 1 Row Pipe Culvert @ Ch. 5730,
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.Pipe culvert at : 6225 Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 2.0mCulvert @ Ch. 6225,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 2.0mCulvert @ Ch. 6225,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 2.0mCulvert @ Ch. 6225,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 2.0mCulvert @ Ch. 6225,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 2.0mCulvert @ Ch. 6225,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 2.0mCulvert @ Ch. 6225,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 2.0mCulvert @ Ch. 6225,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 2.0mCulvert @ Ch. 6225,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 2.0mCulvert @ Ch. 6225,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 2.0mCulvert @ Ch. 6225,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 2.0mCulvert @ Ch. 6225,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 2.0mCulvert @ Ch. 6225,
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. KM 0/0 1/0
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Marker/ Road stud with lens Reflector
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for 60 cm Circle(Mandatory Sign Baoard)
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
Provision for Citizen Information Board
Provision for Maintenance Board
Provision for KM Stone
Provision for HM Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N PERUMAL