Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Fee/PreQual/Technical/Finance | -31.57% | ₹9.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 L+₹66,156.03 (6.66%)Admitted-Fee/PreQual/Technical/Finance | -27.01% | ₹10.6 L+₹66,156.03 (6.66%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.7 L+₹72,684.59 (7.32%)Admitted-Fee/PreQual/Technical/Finance | -26.56% | ₹10.7 L+₹72,684.59 (7.32%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.3 L+₹2.4 L (24.2%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹12.3 L+₹2.4 L (24.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Account No: Linked with GST is not linked with JKPWD OMAS Card as per NIT Conditions |
Tender Value
₹14.5 L
EMD Value
₹29,020
Closing Date
10 Aug 2026, 4:00 pmClosed
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Upgradation of Darvesh bagh Road
2026_PWDJK_317601_6
NIT 38 of RnB Pattan 2026-27
Open Tender
Civil Works
Percentage
50 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Office of The Executive Engineer RnB Division Patt
₹29,020
16 Aug 2026
24 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | UPGRATION OF ROAD Engagement of JCB for Surface dressing/corrections required at site by way of removal of Humps,clearance of Sides, removal of inequalities including disposal from site as per the direction of the site Engineer | 7 | Hours | 1,200 | ₹8,400 |
| 2 | Supply ,stacking, filling,laying and spreading of GSB in 15 cm layers to specified lines,grades and cross sections incld sorting ,spreading to templete ,watering ,dresssing ,ramming and consolidation to the required gradient and camber with 8-10 tonne capacity Power road roller incld. all carriages complete | 122.64 | cum | 1,200 | ₹1,47,168 |
| 3 | Supply and stacking at site Graded Crushed stone aggregrate of size 63mm -45 mm and stone screening of size 13.2 mm nominal size (type A),Stone dust/ moorum (Khakbajree) incld laying ,spreading and compacting stone aggregrate of specified sizes to WBM specifiacations in uniform thickness (75 mm compacted) ,hand picking ,rolling with 3 wheeled road /vibratory roller 8-10 tonne capacity in stages to proper grade and camber ,applying and brooming requisite type of screening /binding material to fill up interstices of course aggregrate ,watering and campacting to the required density incld all carriages from approved source to site of work complete job(crushed from Broken Quarry). | 328.5 | cum | 2,400 | ₹7,88,400 |
| 4 | CC DRAIN Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: | 17.12 | cum | 256.85 | ₹4,397.27 |
| 5 | Supply and laying of dry stone solling dully hand packed incl. spreading , levelling and consolidation with PRP of 8-10 tonne capacity upto required gradient incl. all carriage complete job | 3.02 | cum | 1,000 | ₹3,020 |
| 6 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.01 | cum | 5,667.9 | ₹11,392.48 |
| 7 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.75 | cum | 7,056.25 | ₹54,685.94 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 45.6 | sqm | 286.35 | ₹13,057.56 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete50 mm thick with 20mm nominal size stone aggregate | 7.22 | sqm | 562.15 | ₹4,058.72 |
| 10 | CROSS DRAINAGE PIPES P/l of RCC Pipes in proper position / grade incl. cutting of road surface upto required depth, providing requisite cushion incl. carriage of al materials and piped upto site of work complete.300mm Dia | 14.62 | Rm | 2,500 | ₹36,550 |
stage.html
html • 0.03 MB
finance_1041581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1041581.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .