Loading…
Loading…
Tender Value
₹39.8 L
EMD Value
₹69,600
Closing Date
9 Jun 2026, 4:00 pm4d left
Executive Engineer
Kotranka
Balance Work for construction of 03 ACR at GMS Dhar Sakri.
2026_PWDJK_311500_2
NIT No. 07 of 2026-27 dated 03.06.2026
Open Tender
Civil Works
Kotranka
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RnB Division Kotranka
₹69,600
4 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
9 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mech. means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of
bottoms lift upto 1.5 m, including getting out excavated earth and disposal of | 36 | Cum | 257.85 | ₹9,282.6 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed . | 22 | Cum | 5,202.4 | ₹1,14,452.8 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed. With 20% Boulders | 60 | Cum | 4,774.4 | ₹2,86,464 |
| 4 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) & Extra for brick work in superstructure above plinth level upto floor V level. | 19.5 | Cum | 9,027.2 | ₹1,76,030.4 |
| 5 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level | 4 | Cum | 9,821.85 | ₹39,287.4 |
| 6 | Reinforcement for RCC work including straightening cutting, bending, placing in position & binding all complete with TMT bars. | 414 | Kg | 123.2 | ₹51,004.8 |
| 7 | Centring and Shuttering including strutting, propping etc and removal of form work for Foundations: footings, bases of columns etc. for mass concrete. | 222 | Sqm | 286.35 | ₹63,569.7 |
| 8 | Centring and Shuttering including strutting, propping etc and removal of form work for Suspended floors, roofs, landings, balconies and access platform. | 18 | Sqm | 718.2 | ₹12,927.6 |
| 9 | Centring and Shuttering including strutting, propping etc and removal of form work for Lintels, beams, plinth beams, girders, bressumers and centilevers. | 15 | Sqm | 577.55 | ₹8,663.25 |
| 10 | Centring and Shuttering including strutting, propping etc and removal of form work for Edges of Slabs | 47 | Rmt | 262.2 | ₹12,323.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1008548.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid