Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 2F NORTH SALAPATTI THIRUVELLARAI VIA MANACHANALLUR TK TRICHY DT | MANACHANALLUR | TRICHY | TAMIL NADU | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
20 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Superintending Engineer/TEDC/ Metro/ Trichy.
The Superintending Engineer, Trichy Electricity Distribution Circle, Metro, Mannarpuram, Trichy-20.
Improvement works for extension of control room building of old Srirangam 33/11 kV SS by providing RCC Column, Grade beam, Roof Beam , Roof slab and sunshade for accommodating EE / OM / Srirangam division office.
2020_EB_175042_1
Specification No.13/2020-21
Open Tender
Civil Works
Works
60 days
SRIRANGAM
REFER SPEC
2 documents required · 2 mandatory
₹0
₹2,000
Yes
29 Aug 2020
7 Aug 2020
21 Aug 2020
7 Aug 2020
20 Aug 2020
7 Aug 2020
7 Aug 2020 - 19 Aug 2020
90 days
Amount
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay , stiff black cotton, hard red earth, shales, murram,gravel, stoney earthand earth mixed with small size boulders.
Dismantling and clearing away from site to the designated place as directed by the engineer at site including labour, lead and lift etc., complete.
B.W in CM
Floor finish in cement mortar with tiles
Supply and filling the basement with Msand for foundation and complete basement including watering consolidation etc.
PCC 1:4:8 using 40m HB stone for foundation including cost of al materials and labour etc., complete
RCC 1:1.5:3 using 12- 20mm HB stone with form work for Footing including cost of all materials lead and lift etc., complete
RCC 1:1.5:3 using 20mm HB stone with form work to RCC column portions Including cost of all materials lead and lift etc., complete
RCC 1:1.5:3 using 20mm HB stone with form work for grade beam Including cost of cement all materials lead and lifts etc., complete
RCC. 1:1 1/2:3 mix using 12 mm to 20mm HBS metal(machine crushed) for sunshde with formwork including cost of all labour, materials, lead, lift, etc, complete but excluding cost fo steel reinforcement (by using mixer machine).
Sill slab
Sunshade
RCC. 1:1 1/2:3 mix using 12 mm to 20mm HBS metal(machine crushed) for Lintel / Roof Beam with formwork including cost of all labour, materials, lead, lift, etc, complete but excluding cost fo steel reinforcement (by using mixer machine).
RCC. 1:1 1/2:3 mix using 12 mm to 20mm HBS metal(machine crushed) for Roof Slab with formwork including cost of all labour, materials, lead, lift, etc, complete but excluding cost fo steel reinforcement (by using mixer machine).
Refilling the excavated earth other than sand complying with standard specification for filling in side of foundation and basement including cost of labour charges lead lift etc., Complete.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .