| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹10.7 LAccepted-AOC | ₹10.7 L | 1st | Accepted-AOC 1st Lowest |
| 2 | 2nd₹11.9 L+₹1.2 L (10.7%)Rejected-AOC | ₹11.9 L+₹1.2 L (10.7%) | 2nd | Rejected-AOC 2nd Lowest |
| 3 | 3rd₹13.2 L+₹2.5 L (23.0%)Rejected-Finance VILL ABHOYNAGAR NALUA BELONIA SOUTH TRIPURA | BELONIA | SOUTH TRIPURA | TRIPURA | 799156 | ₹13.2 L+₹2.5 L (23.0%) | 3rd | Rejected-Finance Financially Not-Qualified |
| 4 | 4th₹15.0 L+₹4.3 L (39.8%)Rejected-Finance VILL ANANDAPARA PO SABROOM SABROOM SOUTH TRIPURA PIN 799145 | SOUTH TRIPURA | TRIPURA | 799145 | ₹15.0 L+₹4.3 L (39.8%) | 4th | Rejected-Finance Financially Not-Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Not-Qualified |
Tender Value
Refer Docs
EMD Value
₹41,710
Closing Date
25 May 2026, 3:00 pmClosed
The EE, WRD-IV, BLN
O/o The EE, WRD-IV, BLN
Cleaning of jungle, repairing of rain cuts, palasiding works, placing of wire crates, CC works etc. including allied works
2026_CEWR_72762_1
01/EE/WRD-IV/BLN/DNIeT/2026-27
Open Tender
Civil Works - Water Works
Percentage
120 days
O/o The EE, WRD-IV, BLN
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹41,710
Yes
22 Jun 2026
12 May 2026
25 May 2026
12 May 2026
25 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 2,000 | sqm | 9.4 | ₹18,800 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300. | 450 | cum | 226.1 | ₹1,01,745 |
| 3 | Providing placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand(of minimum quantity of 0.034 cum) and properly manually stitched to avoid any leakage of sand as per specification | 1,000 | Nos | 45.5 | ₹45,500 |
| 4 | Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.
a) Driven at least 900 mm below ground and 1200 mm above ground on average | 40 | Mtr | 1,149.4 | ₹45,976 |
| 5 | Turfing with sods furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground fetching of sods and watering as per MORT & H technical specification clause of section 300 | 120 | Sqm | 51.1 | ₹6,132 |
| 5.01 | Manufacturing & supplying of machine made PVC wire crates chain link type made by S.W.G PVC wire bearing 12/10 SW. GI wire inside the PVC wire, size of cage 1500 mm. X 600 mm. X 450 mm. having square mesh of 80mm. X 80mm. including carrying to the work site as per direction of the Engineer-in charge (Weight of each cage shall not be less than 7.80 kg) | 400 | Kg | 202 | ₹80,800 |
| 6 | Supplying and stacking mixed class brick bats (50% first class & 50% un-class) including carriage loading & unloading at the site of work complete as per direction of the Engineer-in charge | 30 | Cum | 3,420.92 | ₹1,02,627.6 |
| 7 | Labour charge for filling/packing of mixed class brick bats in S.W.G PVC wire crates of size of 1500 mm. X 600 mm. X 450 mm. fastening with SWG GI wire and placing in river bed/slope properly as per direction of the Engg-in-Charge. | 52 | Nos | 173.3 | ₹9,011.6 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
ii) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 15 | Cum | 8,980 | ₹1,34,700 |
| 9 | Manufacturing of cement concrete block(size=0.45m x 0.45 mx0.30m) with cement concrete 1:4:8(1 cement :4 river sand:8 jhama brick aggregate of 40 mm. Nominal size) including centering and shuttering and engraving of SI. No. of each block as per direction of the Enginee - In - Charge. | 154.8 | Cum | 9,365.66 | ₹14,49,804.17 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74045.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.87 MB
Appendix-II-V.pdf
Additional Documents • 0.47 MB
Statement-I-III.pdf
Additional Documents • 0.07 MB
DNIeT-1.pdf
Tender Documents • 2.36 MB
BOQ_74045.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .