Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance AT CHHOTAGUDA BILANGSIL PO BILANGSIL DASAMANTHAPUR DIST KORAPUT | KORAPUT | ODISHA | -25.01% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.1 L+₹80,139.03 (4.15%)Admitted-Fee/PreQual/Technical/Finance | -21.90% | ₹20.1 L+₹80,139.03 (4.15%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹20.1 L+₹80,139.03 (4.15%)Admitted-Fee/PreQual/Technical/Finance | -21.90% | ₹20.1 L+₹80,139.03 (4.15%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹24.5 L+₹5.2 L (26.7%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹24.5 L+₹5.2 L (26.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹24.6 L+₹5.3 L (27.4%)Admitted-Fee/PreQual/Technical/Finance GADIAGUDA PO LAXMIPUR DIST KORAPUT PIN 765013 | LAXMIPUR | KORAPUT | ODISHA | 765013 | -4.50% | ₹24.6 L+₹5.3 L (27.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.8 L
EMD Value
₹26,000
Closing Date
21 Aug 2026, 5:00 pmClosed
EE RWSS DIVISION KORAPUT
OFFICE OF SE RWSS DIVISION KORAPUT
Rural Piped Water Supply to Jhodipai GP Chanabada of Dasamantpur block under Koraput District DMF Programme
2026_RWSS_138462_2
04/EE/RWSS/KPT/26-27/1.8.26
National Competitive Bid
Civil Works - Water Works
Percentage
120 days
Dasamantpur
Please Refer tender details
3 documents required · 3 mandatory
₹6,000
₹26,000
Yes
26 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
11 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Collection Box | - | - | - | - |
| 2 | Supplying all labour, T&P and materials for earth work excavation in foundation in stoney earth with all lead & lift including dressing the sides & levelling the bed of the foundation as directed by the Engineer-in-charges complete as per specification & direction of the Engineer-in-charge. | 10.45 | cum | 441.2 | ₹4,610.54 |
| 3 | Supplying all materials, labour T&P for providing cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metal of approved quality from approved quarry including hoisting and laying not exceeding 150mm. thick with proper packing including curring, shuttering if necessary with cost, conveyance, royalty, taxes of all materials required for the work including T&P articles finishing the exposed surface smooth as per specification & direction of the Engineer-in-charge. | 3.26 | cum | 5,758.5 | ₹18,772.71 |
| 4 | Supplying all materials, labour T&P providing R.C.C. (1:1.5:3) work using 12mm size hard black hand broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete watering and curing for four weeks, finishing the exposed surface smooth including cost conveyance taxes and royalty of all materials and labour with T&P required for the work etc, complete in all respect .as per specification and direction of the Engineer-in-charge. | 7.04 | cum | 8,455.4 | ₹59,526.02 |
| 5 | Supplying all materials, labour T&P and providng rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including cost of materials etc. | - | - | - | - |
| 6 | Wall | 28.2 | sqm. | 1,090.4 | ₹30,749.28 |
| 7 | Roof slab | 11.51 | sqm. | 772.7 | ₹8,893.78 |
| 8 | Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. | 5.98 | qntl. | 9,400.8 | ₹56,216.78 |
| 9 | Supplying all materials, labour T&P providing 12mm thick cement plaster (1:4) finished smoothincluding punning to out side of walls after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. | 26.18 | sqm | 217.9 | ₹5,704.62 |
| 10 | Supplying all material labour T&P and providing filling gravel inside & packing outside the well stening for filter bed of approved size and quality etc complete as per the direction of Engineer in charge including cost & royality and taxes etc all complete. | 0.79 | cum | 1,420.3 | ₹1,122.04 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_605716.xls
BOQ • 0.35 MB
SBDJHODIPAIPDF.pdf
Tender Documents • 4.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .