Similar tender results from the same govt authority in the past 3 years.
SE-TR JAMNAGAR
Construction of Line Bay Foundations, Cable trench and misc. civil works at Various 66 kV Sub-station under AM Division Ranavav under TR Circle Jamnagar. [Link Line 2024-25]
315113
TCJ/26-27/18
Open
Civil Works
Jamnagar
14 documents required · 13 mandatory · 1 optional
₹1,062
GETCO-JAMNAGAR
₹19,999
17 Jun 2026
17 Jun 2026
17 Jun 2026
8 Jul 2026
17 Jun 2026
Name of work :-"Construction of Line Bay Foundations, C/T and misc. civil works at Various
66 kV Sub-station under AM Division Ranavav under TR Circle Jamnagar." [Link Line 2024-25]
Description Unit Rate Amount
[A] DISMANTLING & DEMOLITION
Demolition of brick work/stone masonry including
1 stacking of serviceable materials and disposal of 1.00 CMT 583.86
unserviceable materials with all lead and lift.
Demolition of R.C.C. work including stacking of
2 serviceable materials and disposal of 1.00 CMT 1122.66
unserviceable materials with all lead and lift.
Labour Charges for removing, Collecting, Stacking
existing yard Metal including stacking the useful
material and disposed of non-usable material upto
any lead etc. complete as directed by E.I.C.
[B] EXCAVATION, FILLING AND EARTH WORK
Excavation for foundation up to 1.50m Depth
including sorting out and stacking of useful
materials & Refilling the sides of the trenches
4 and disposing of the excavated stuff up to any 255.00 CMT 705.00
lead, including De-watering if required - Any
type of soil/ Murrum/Soft rock / Hard rock
Excavation for foundation 1.50 to 3.10m Depth
including sorting out and stacking of useful
materials & Refilling the sides of the trenches
5 and disposing of the excavated stuff up to any 29.00 CMT 1212.00
lead, including De-watering if required - Any
type of soil/ Murrum/Soft rock / Hard rock
Eartwork in cuting in all sorts of soil and soft
murrum including conveying and spreading the
6 stuff, embankment as where directed from the end 20.00 CMT 139.48
of the cutting with all required lead and lift.
[C] CONSTRUCTION
(1) Masonry WORK
White Stone Bela mesonry block incoursein
superstructure with stone of approved quality in
Cement Mortar1:6(1-Cement:6-course sand)
including packing the joint setc. complete.(more
(2) CONCRETE WORK
Providing and laying cement concrete 1:4:8(1
Cement : 4 Coarse and : 8 black crushed stone
aggregate 40mm nominal size ) and curing
complete- Foundation and plinth.
Providing form work of ply wood shuttering so as
to give a smooth exposed finish including centering
(adjustable tubular steel supports). Shuttering
strutting and propping etc. for any height of
propping and centering below supporting floor to
ceiling , and removal of the same for reinforced
concrete and plain concrete. for Footings
foundations and pedestal
Providing & laying control cement concrete M-20
as per mix design exposed work with curing etc.
complete excluding the cost of ply wood form
10 work & adjustable tubular steel supports / Props. 143.00 CMT 4116.85
but excluding the cost of reinforcement.G.F+FF &
Staircasse -For Footing base of col.,foundation &
Providing Thermo Mechanically treated bars (TMT
bars) confirmed to IS 1786 FE 500/500D for RCC
work including bending, binding and placing in
position etc. completed for RCC work.
(3) PLASTER WORK
Providing 15mm thick cement plaster single coat on
masonary / bela / concrete wall / ceiling for
12 plastering up to any floor level finished even and 65.00 SMT 187.11
smooth/Sand Face in cement mortar 1:3 (1 Cement
(4) FABRICATION ITEMS
Supply, fabrication,cutting,threading of M.S rod
including hot dip galvanizing the same of required
size and length including 2 Nos of hex nuts with
13 check nut, lock nut, plain washer,spring washer, 828.75 KG 108.00
base plate 65X10 thick stopper pit welded at end.
etc; complete as directed by E.I.C (Revised Basic
rate+Transportation Charges as per RA)
Setting of template & foundation bolts in line and
level before concreting of foundation and making
arrangement of fixing template in such a way as it
remains in position during concrete etc. comp. As
directed by EIC. Note:The rate includes supplying
and setting both.
Drilling of Bore holes 32mm to 40mm dia by means
of compressor machine having depth of hole up to
1.00 to 1.20 mt. as decided by Engineer in charge &
as per drawing in all sorts of Soil, sand, clay, hard
rock etc. truly vertical to existing land with cleaning
the same by air & Grouting of Bores holes by means
of Cement, sand, Grit, etc. with utilization of
aluminum powder or ACC shrink compound ‘N’
grout or equivalent any other bonding material as
approved by competent authority in suitable
content with mixing ramming curing etc. complete
including with 20mm dia. of M.S. Anchor bar having
minimum length of 1.70 mt (Reinforcement) ( The
rate includes the cost of MS Anchor bar) as directed
by Engineer in charge.
Providing & placing 50mm thick & 300mm wide
Prestressed Concrete Cover (for clear span of up to
1.2 meter in proportion (1:1:5:3) or M-20 necessary
reinforcement or 4mm dia HT steel wire-4 Nos. bars
and 4mm dia. distribution bars at 150 mm C/C as per
drawing & design including providing necessary
M.S. bar hooks for lifting arrangement & vibrating
with vibrators. Finishing all the surfaces, curing by
placing in water pond for ten days etc. complete as
directed by E.I.C. ( The rate includes cost of all
material required, labour charges, transportation,
loading, unloading etc.)
[D] WATER SUPPLY AND DRAINAGE & MISC.
Providing & laying rigid 10 kg/cm2 PVC drainage
pipe 75mm dia. including necessary fittings like
17 bend, tee,Y bend plug etc. fixed with wall by means 30.00 RMT 160.17
of clamps & nails with water tight joints by approved
solution etc. complete as directed by EIC.
TOTAL ESTIMATED COST FOR CIVIL WORKS
Welfare cess 1%
Total estimated cost
NOTE: (1) Please note that change in commercial terms & conditions in (i) Section-A ”Instruction to Bidders” , (ii) Section-C
(Conditions of Contract), Caluse No.3 (Compensation for the delay) and clause No.6 (Action on default by contractor) and
(iii) Section-D (General Condition of Contract), Clause-37 (Rights of Owner), Clause-38 (Relationship with employee) and
clause-39 (Conflict of Interest among Bidder/Agents)
Supt Engineer (TR),
GETCO: Circle Office, Jamnagar.
I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical specifications put by GETCO on WEB
I/We hereby accept all the conditions and specifications of this tender document, and accordingly, I/We am/are willing to carry
out the work at _________________% (in words ______________percentage) above/below the estimated cost. Accordingly
the total amount of my/our tender works out to Rs.____________________ (Rupees__________________
the total amount of my/our tender works out to Rs.____________________ (Rupees__________________
SIGNATURE OF CONTRACTOR.
(With rubber stamp/seal of the company)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice TCJ-26-27-18.pdf
Price Bid TCJ-26-27-18.pdf
Tech Specification TCJ-26-27-18.pdf
Integrity Pact TCJ-26-27-18.pdf
Download all tender documents and submit your bid