Loading…
Loading…
Tender Value
₹20.4 L
EMD Value
₹20,420
Closing Date
11 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
CHIEF OFFICER
Construction of Store Room for Kalawad Nagarpalika, at Kalawad, Dist. Jamnagar (6th Attempt).
280041
KLDNP/2025-26/52/1378/19-02-26/6th Attempt
Open
Civil Works - Buildings
Jamnagar
2 documents required · 2 mandatory
₹1,062
Yes
Chief Officer, Kalavad Nagarpalika
₹20,420
Yes
24 Feb 2026
24 Feb 2026
24 Feb 2026
11 Mar 2026
24 Feb 2026
Name of work : Construction of Store Room for Kalawad Nagarpalika, at Kalawad, Dist. Jamnagar (6th Attempt)
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful
materials and disposing of excavated stuff any Rupees SeventyEight
lead (A) For Loose or Soft soil (S.O.R, Sr. No. Paise Five Only
04001A, Item No.0)
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful
materials and disposing of excavated stuff any Rupees NinetyNine Paise
lead (B) For Dense or Hard soil (S.O.R., Sr. No. EightyNine Only
04001B, Item No.0)
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful Rupees One Hundred
3 27.60 materials and disposing of excavated stuff any 169.58 SixtyNine Paise M3
lead (B) Hard Murrum (S.O.R., Sr. No. 04001C, FiftyEight Only
Excavation for foundation from 1.5 to 3.0 Meter
depth including sorting out and stacking of Rupees Four Hundred
4 27.60 useful materials and disposing of excavated 413.49 Thirteen Paise M3
stuff any lead (C) Hard Rock (S.O.R. Page No. FourtyNine Only
35, Sr. No. 04002E, Item No.0)
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Filling in foundation and plinth with murrum or
selected soil in layers of 20 cm thickness Rupees Two Hundred
5 66.80 including watering, ramming and consolidating 217.70 Seventeen Paise Seventy M3
etc. complete. (S.O.R, Sr. No. 4008A, It. No. 0) Only
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm. In depth
Rupees EightyEight Paise
6 39.70 consolidating each deposited layer by ramming 88.86 M3
and watering (S.O.R., Sr. No. 4006, It. No.
Providing and laying cement concrete 1:2:4 (1-
cement : 2- coarse sand : 4- graded stone
aggregate 20 mm. Nominal size) and curing Rupees Three Thousand
7 18.20 complete excluding cost of form work in : (a) 3064.14 SixtyFour Paise Fourteen Kg.
Foundation and plinth S.O.R., Sr. No. 05010AA, Only
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of Rupees Three Thousand
form work and excluding cost of reinforcement Seven Hundred
for reinforced concrete work in : RCC Column SeventyFour Paise
Footings Rate Analysis ThirtySeven Only
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of
Rupees Five Thousand
form work and excluding cost of reinforcement
9 1.60 5435.82 Four Hundred ThirtyFive M3
for reinforced concrete work in : RCC Column up
Paise EightyTwo Only
to Plinth Lvl. Rate Analysis
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of
Rupees Five Thousand
form work and excluding cost of reinforcement
10 10.00 5435.82 Four Hundred ThirtyFive sqm
for reinforced concrete work in : RCC Columns
Paise EightyTwo Only
for Ground Floor Rate Analysis
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of Rupees Four Thousand
form work and excuding cost of reinforcement Two Hundred
for reinforced concrete work in : RCC Plinth FourtyThree Paise One
beams Rate Analysis Only
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of
form work and excuding cost of reinforcement Rupees Four Thousand
for reinforced concrete work in : RCC Floor 4532.88 Five Hundred ThirtyTwo Kg
Beams at GF Slab lvl. Rate Analysis Paise EightyEight Only
Providing laying Controlled cement concrete M-
250 and curing complete including the cost of
form work and excluding cost of reinforcement Rupees Four Thousand
for reinforced concrete work in : RCC GF Slabs & 4500.56 Five Hundred Paise Kg
Landings Rate Analysis FiftySix Only
Providing laying Controlled cement concrete M-
200 and curing complete including the cost of
form work and excluding cost of reinforcement Rupees Five Thousand
for reinforced concrete work in : RCC Lintels 5415.62 Four Hundred Fifteen Kg
Ground Floor Rate Analysis Paise SixtyTwo Only
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and Rupees SeventyTwo
15 9416.00 placing in position complete upto floor two level 72.43 Kg
Paise FourtyThree Only
Brick Work using common burnt clay building
bricks having crushing strength not less than
35kg./sq. Cm. in Superstructure above plinth Rupees Three Thousand
level upto floor two level in cement mortar 1:5 Three Hundred
(1- Cement : 5- Fine Sand) (A) Modular (upto ThirtySeven Paise
10 ton) S.O.R., Sr. No. 06006A, It No. 6.19 + FourtyFour Only
Half Brick Masonry in common burnt clay
building bricks having crushing strength not less
than 35kg./sq. Cm. in Superstructure above Rupees Four Hundred
17 23.00 plinth level upto floor two level in cement 425.96 TwentyFive Paise Kg
mortar 1:5 (1- Cement : 5- Fine Sand) (A) NinetySix Only
Modular (upto 10 ton) S.O.R, Sr. No. 06008B1,
Providing 15 mm thick cement plaster in single
coat on Rough side of single or half brick walls
for interior plastering up to floor two level and
finished even and smooth in & Extra over items Rupees One Hundred
18 218.90 for finishing with a floating coat of neat cement 134.27 ThirtyFour Paise Kg
slurry. ( more than 10 ton) (ii) Cement mortar TwentySeven Only
1:4 ( 1 cement : 4 sand) for Ground Floor
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing 10 mm thick cement plaster in single
coat on brick/concrete walls for interior
plastering up to floor two level and finished
even and smooth in & Extra over items for
finishing with a floating coat of neat cement Rupees One Hundred
19 120.30 slurry for plastering on ceiling and soffits of 126.10 TwentySix Paise Ten Kg
stairs up to floor two level instead of plastering Only
on walls. Ground floor (ii) Cement mortar 1:4 (
1 cement : 4 sand) S.O.R. Sr. No. 17001B, It.
20 mm thick sand faced cement plaster on walls
upto height 10 meters above ground level
consisting of 12 mm thick backing coat of c.m.
Rupees Two Hundred
20 373.50 1:3 (1:cement - 3:sand) and 8 mm thick 200.43 Kg
Paise FourtyThree Only
finishing coat of c.m. 1:1 (1:cement - 1:sand)
etc. complete S.O.R. Sr. No. 17009, It. No.
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after
Rupees SeventySix Paise
21 373.50 thoroughly brushing the surface to remove all 76.36 Kg
dirt, and remains of loose powdered
materials.etc completeS.O.R. Sr. No. 19031, It.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing and laying broken china mosaic
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar crème out up to Rupees Four Hundred
surface using white cement including rounding 499.50 NinetyNine Paise Fifty Kg
off junctions and extending them up to 15cm Only
along the wall clearing with water and oxalic
acid etc. as directed S.O.R. Sr. No. 14035, It.
Providing and laying Granite slab (18mm thick)
slab flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-Coarse sand) Rupees Two Thousand
or L.M. 1:1.5 laid over and jointed with grey Three Hundred
cement slurry including rubbing and polishing EightyOne Paise
complete (Basic Granite rate shall be 250/Sft) EightyEight Only
(A) Granite slab 18mm thick Rate Analysis
providing and laying 24" x 24" vitrified 8mm
thick tiles flooring over 20mm (average) base of
cement mortar 1:6 (1-cement : 6-coarse sand)
on new surface or fixing on existing flooring by
adhesive materials including dismentaling of Rupees Nine Hundred
existing flooring and jointed with colour cement 937.48 ThirtySeven Paise Kg
slurry including finished with flush pointing & FourtyEight Only
clearing the surface etc. complete for Light
Shade (more than 10 ton)S.O.R. Sr. No.
14022A, Item No.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Applying Two coats of Birla or Asian Acrylic
Lappy (putty) and two coats of primer of
approved brand and manufacture on new wall
surface to give an even shade including Rupees FourtySeven
25 339.08 throughly brushing the surface free from mortar 47.88 Kg
Paise EightyEight Only
dropping and other foreign matter and sand
papered smooth. S.O.R. Sr. No. 19032, It. No.
Wall painting (two coats) with plastic emulsion
paint of approved brand and manufacture on
undecorated wall surface to give an even shade
including throughly brusing the surface free Rupees FiftyThree Paise
from mortar droppings and other foreign matter FiftySix Only
and sand papered smooth.S.O.R. Sr. No.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing and fixing window having extruded
aluminum Colour powder coated section frame
main outer size 127 x 38.10 x 1.35 mm(of
Jindal Section no:2443,@ Wt 1.384 Kg / Rmt),
horizontal Four track member size 122.20 mm x
31.75 mm x 1.10mm (of Jindal Section no:
8787 @ wt.of 1.205 Kg/mt), vertical member of
size 122.20 mm x 31.75mm x 1.50 mm (of
Jindal Section no:8935 @ wt.of 1.398 Kg/mt)
with sliding shutters of horizontal member size Rupees Two Thousand
27 6.50 40mm x 18mm x 1.29mm (of Jindal Section 2525.63 Five Hundred TwentyFive Kg
no:8949 @ wt.of 0.456Kg/mt), vertical member Paise SixtyThree Only
of size 40mm x 18mm x 1.29mm (of Jindal
Section no:8947 @ wt.of 0.456Kg/mt/ Section
8948, @ Wt. 0.457 Kg/mt) with 5 mm thick
trans- -parent bronze colour tinted float glass
with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass
fixing to frame as per details etc complete for
window.S.O.R. Sr. No. 11032 Item no.
Painting two coats (including priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade Rupees EightyOne Paise
including clening the surface of all dirt, dust and SixtySix Only
other foreign matter.S.O.R. Sr. No. 19001, Item
No. 19.2 + Sr. No. 19002, Item No.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing, laying and jointing in true line and
level 50mm dia. U.P.V.C. pipe (SCH-40) for cold
water including fitting as approved by engineer-
in-charge. Pipe shall be fixed on the wall with
the help of clamp at every two meter C/C or Rupees Two Hundred
shall be concealed as directed including 230.90 Kg
Thirty Paise Ninety Only
necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive
solvent, including cost of all materials.S.O.R. Sr.
Providing and fixing 35mm thick shutters for
doors, Windows and clearstory windows Rupees Three Thousand
30 1.70 including blcknamelled M.S. butt hinges with 3194.23 One Hundred NinetyFour Kg
necessary screws. (A) Indian teak Wood. (i) Paise TwentyThree Only
Fully Panelled. (upto 10 ton)S.O.R. Sr. No.
Providing and fixing PVC SWR Nahni Trap is
14735 for drain 100 mm dia. with Jali of the
following nominal dia of self cleaning design Rupees Three Hundred
31 4.00 with C.I. screwed down or hinged grating 372.24 SeventyTwo Paise Kg
including the cost of cutting and making good TwentyFour Only
the walls.S.O.R. Sr. No. 23068, It. No.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Constructing brick masonry chamber for under
ground C.I. Inspection chamber and bends with
bricks having crushing strength not less than
Kg/cm2 in cm. 1:5 C.I. Cover with frame (light
duty) 455 mm. X 610 mm. Internal dimensions,
total weight of cover with frame to be not less
than 38 Kgs. weight of cover 23 Kg. and wt. of
frame 15 Kg) R.C.C. top slab with 1:2:4 mix(1 Rupees Two Thousand
32 5.00 cement : 2 coarse sand : 4 graded stone 2691.55 Six Hundred NinetyOne Kg
aggregate 20 mm. size ) foundation concrete Paise FiftyFive Only
1:5:10 inside plaster 15 mm. thick with cement
mortar 1:3 finished smooth with a floating coat
of neat cement on walls & abed concrete etc.
complete (I) inside dimensions, 455 mm.
mm. And 450 mm. Deep for single pipe line
S.O.R. Sr. No. 24016A, Item No.
Providing and fixing M.S. grills of required
pattern to wooden frames of windows etc. with
M.S. flats at required spacings and frame
around, square or round bars with round headed Rupees SixtyNine Paise
bolts and nuts or by screws. TwentySix Only
(A) Plain Grills (more than 10 ton)S.O.R. Sr.
No. 10025A, Item No.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
Providing and fixing rolling shutters of approved
make made of 80 mm wide M.S. laths inter-
locked together through their entire length and
jointed together at the ends by end locks
mounted on specially designed pipe shaft with
Rupees Three Thousand
bracket plates, guide channels and arragements
34 48.30 3812.43 Eight Hundred Twelve Sqm
for inside and outside locking with push-pull
Paise FourtyThree Only
operation including the cost of hood cover and
spring etc. complete.(A) Shutters having width
below 3.5 M.S.O.R. Sr No. 11005A, It. No.
` Add for Electrification @ 10.0% :-
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
KALAVAD NAGARPALIKA
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or quantities.
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site
moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment
shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and
amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the
5) Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As
per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and
conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
KALAVAD NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. MILE STONE DATES AND TENDER NIVIDA.pdf
2. FORM B-1.pdf
3. SCHEDULE-B.pdf
4. DRG AND SECTION.pdf
5. COVERPAGE.pdf
6. DETAILS OF WORK.pdf
6. MATERIAL TESTING SCHEDULE.pdf
7. NON BLAKLSIT AFFIDEVIT FORMAT.pdf
8. CIVIL MATERIAL VENDER LIST.pdf
9. ELECTRIC MATERIAL VENDER LIST.pdf
10. WATER WORKS MATERIAL VENDER LIST.pdf
11. SPECIFICATION OF ROAD WORK.pdf
12. SPECIFICATION OF BUILDING WORK.pdf
13. SPECIFICATION OF ELECTRICAL WORK.pdf
14. GOVERMENT RESOLUTTION GUJARAT.pdf
15. NIVIDA EPAPER SANDESH_RAJKOT_20260221.pdf
Download all tender documents and submit your bid