| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹16.0 L (6.40%)Rejected-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹2.7 Cr+₹16.0 L (6.40%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.7 Cr+₹17.2 L (6.86%)Rejected-Finance VILLAGE ROPARI POST OFFICE GHAMIRU TEHSIL LAD BHAROL DISTRICT MANDI H P | ₹2.7 Cr+₹17.2 L (6.86%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.7 Cr+₹19.8 L (7.88%)Rejected-Finance HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176093 | ₹2.7 Cr+₹19.8 L (7.88%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.9 Cr+₹35.0 L (14.0%)Rejected-Finance | ₹2.9 Cr+₹35.0 L (14.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
3 Feb 2026, 10:30 amClosed
Superintending Engineer 1st Circle HPPWD Mandi
O/o Superintending Engineer 1st Circle HPPWD Mandi
Construction of Link road from Kotli Bus Stand to Upparli Surrari Km. 0/00 to 4/120 under NABARD RIDF-XXXI, District Mandi (H.P.) MLA Priority 2021-22. (SH - ROFD, Formation Cutting, R/walls, RCC Hume Pipe, Slab Culverts and unlined surface drain etc
2026_PWD_126769_1
PW-SE-I-Tender-107- RIDF-XXXI-MDII- 1st Call/Publication/2026- 13322-73 Dated 23.01.2026
Open Tender
Civil Works - Roads
Percentage
365 days
In Mandi Division No.II HPPWD
As per SBD/tender document.
9 documents required · 9 mandatory
₹7,000
₹7.4 L
25 Apr 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
28 Jan 2026 - 31 Jan 2026
Execuation in soil in hilly area in all kinds of soil such as pick work, jumper work, pick jumper work, pick jumper blasting work, jumper blasting work, blasting work (soft and hard rock) conglomerate rock including/ chiseling wedging out of rocks (where blasting is prohibited), saturated soil and their intermediate classification of soil including ramming and de-watering where required as per the geometrics, grades and levels shown on the drawings, including clearing of jungles uprooting of trees, vegetation, grass wood trees and sapling of all girth upto any heights/depths and removal of rubbish up to any distance outside the periphery of the area including stacking the useful material along the road side and disposal of all unserviceable materials through all modes of transportation with in all leads and lifts. The recovery of 4488.08 cubic metre @ Rs. 300/- per cubic metre amounting to Rs. 13,46,424/- only, shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to public or private property during the course of execution shall be the responsibility of the contractor, which shall have to be duly compensated by him at his own cost in all cases to the extent The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Earth work in excavation for structures in all depths as per drawing and technical specification for rural roads clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super elevation and levels as shown on the drawings or as directed by the Engineer-in-Charge including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing of the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met within the excavation due to stream flow, seepage, rain and other causes, it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all casesas The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying 1:4:8 (One cement : four sand : eight graded stone aggregate 40mm (Forty millimetre nominal size) concrete for plain/reinforced concrete in open foundations and curing complete including cost of form work , vibrator and as per drawing and technical MORD specification clauses 802, 803, 1202 and 1203, The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying concrete for plain concrete 1:6:12 (one cement : six sand : twelve graded stone aggregate 40mm (Forty millimetre nominal size) in open foundations and curing complete including cost of form work , vibrator and as per drawing and technical MORD specification clauses 802, 803, 1202 and 1203, The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying cement concrete 1:3:6 (One cement : three sand : six graded crushed stone aggregate 40mm (forty millimetre nominal size) concrete for plain/reinforced concrete in open foundations complete including cost of form work , vibrator and as per drawing and technical MORD specification clauses 802, 803, 1202 and 1203, The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying Plain/reinforced cement concrete M-25 (twenty five) in super structure including form work complete including cost of form work , vibrator and as per drawings and technical MORD specification clauses 800, 1205.4 and 1205.5 including reinforcement grade , The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying Plain/reinforced cement concrete M-30 (Thirty) in super structure including form work complete including cost of form work , vibrator and as per drawings and technical MORD specification clauses 800, 1205.4 and 1205.5 including reinforcement grade , The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Construction of RCC railing of M-25 (Twenty Five) grade, cast in situ with 20mm (twenty millimetre) nominal size stone aggregate true to line and grade of vertical RCC post not to exceed 1 in 500 (one in five hundred), centre to centre spacing between vertical post not to exceed 2000 mm (two thousand millimetre), leaving adequate space between vertical post for expansion, complete including cost of form work , vibrator and as per approved drawing and technical MORD specifications clause 800, 900 and 1208.30 , The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Drainage spouts 100mm (one hundred millimetre) dia Galvanised iron complete as per drawing and technical MORTH specification 2705 , The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in super structrue complete including cost of binding wire and as per drawings and technical MORD specification Clauses 1002, 1005, 1010 & 1202. The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying of boulder apron laid in wire crates with 4mm (four millimetre) dia. GI wire conforming to IS: 280 and IS: 4826 in 100mm X 100mm ( one hundred millimetre into one hundred millimetre) mesh (woven diagonally including 10 (Ten) percent extra for laps and joints laid with stone boulders weighting not less than 25kg (twenty five kilogram) each as per drawing and technical MORD specification clause 1301, The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Coursed rubble stone masonry in cement mortar (1:4) (One cement : Four sand) in foundation / supper structure complete as drawing and technical MORD specification clauses 702, 704, 1202 and 1204 . The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Coursed rubble stone masonry in cement mortar (1:5) (One Cement : Five sand )in foundation / supper structure complete as drawing and technical MORD specification clauses 702, 704, 1202 and 1204 The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Random rubble masonry in cement mortar 1:6 (One cement : six sand) for substructure / supperstructure complete as per drawing and technical MORD specification Clause 702, 704, 1202 and 1204, The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Construction of dry rubble masonry for retaining walls, breast walls, revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical MORD specification clauses 704.6 & 1302.5 ,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification Clause 1204.3.8. Granular material ,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing weep holes in block masonry/ stone masonry/ plain reinforced concrete abutments wing wall, return wall with 100mm PVC pipe extending through the full width of the structure with slope of I (V) : 20 (H) towards drawing face complete as per drawing and technical MORD specifications clause 614, 709, 1204.3.7 ,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying dry stone flooring as per drawing and technical MORD specifications clause 1303.3 ,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing, and laying reinforced cement concrete 900mm diameter (Nine hundred millimeter) pipe NP3 as per design for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement: two sand) but excluding excavations, protection works, back filling, concrete and masonry works in head walls and parapets as per drawings and technical specifications for Rural roads clause 1106 ,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 Rubble stone laid in cement mortar 1:3 (One cement : three sand) Earth work in excavation and cement concrete for bedding to be measured and paid for separately,,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Construction of unlined surface drain of average cross-sectional area 0.40 sqm (zero point four zero) in ordinary rock to specified line grades levels and dimension as per approved design and technical specification clause 307. Excavated material to be used in embankment at site,The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
Carriage for the dumping materials in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rate are inclusive of Octroi , royality , malkana , toll tax , sale tax or other taxes imposed by the Government , but excluding GST and including entire carriage of material within all leads and lift as per entire satisfaction and direction of Engineer - in - Charge.
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_187072.xls
BOQ • 0.32 MB
SBD_LR_KOTLI_SURRARI.pdf
Tender Documents • 4.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .